You are on page 1of 2

>>>Following CMS items are checked and inspected by LR surveyor at Langkawi anchorage. (05/04/08).

>>Carried out CMS survey on ME attached LO circulating port pump @ 73991 Rhys. (Survey item No.1515)
>>Carried out CMS survey on ME attached LO circulating stb. Pump @ 74038 Rhys. (Survey item No.1508).
>>LR survey carried out on life boat motor / fuel oil tank / gear box with propeller arrangement and running tested.
>>SE survey carried out on rescue boat life raft crane and boat motor( portside aft).
>>Carried out CMS survey on boiler steam generating plant alarms, control and safeguards by class surveyor @ 1066295. ( No.1827 ).
>>Carried out survey on hose handling crane by LR class surveyor.
>>Carried out CMS survey on fuel oil & LO transfer and storage system. No.1908
>>Starting and control air system of main engine. MEP:7991 / MES: 74038. (1834)
>>Starting inner air compressor and safety devices @ Count. 9423. ( 1010 )
>>Starting outer air compressor and safety devices @ Count. 15509. (1027)
>>Topping up air compressor and safety devices @ count.. 13644. (1034)
>>GS air compressor and safety devices. (1041)
>>Main starting upper air receiver and safety devices. ( 1058 )
>>Main starting lower air receiver and safety devices. (1065)
>>Auxiliary starting air receiver and safety devices. ( 1072 )
>>GS air receiver and safety devices. ( 1089 )
>>Starting air pipes. (1096)

You might also like