Date Time in Time out Hours Description Total Hours

Organize and move things in basement to be able to hang up sheetrock.


Get all materials that are needed into basement to hang up sheetrock.
Began my project and screw and nail sheetrock to walls. Cut out door opening.
April 9 2:00 PM 6:45 PM 4.75 Vaccumed and swept sheetrock dust to finish for the day. 15.25
Buy more sheetrock to be able to finish. Load sheetrock onto trailor.
Take out basement window to be able to get sheetrock in basement.
Unload sheetrock from trailor through the window opening into basement.
April 16 5:45 PM 6:45 PM 1 When done loading sheetrock in basement put window back in.
Measured, cut and hanged sheetrock on ceiling and wall.
April 22 5:00 PM 7:00 PM 2 Cut out area where lights, ceiling fans and outlets will be.
Measured, cut and hanged sheetrock on ceiling and wall.
April 23 8:00 PM 10:00 PM 2 Cut out area where lights, ceiling fans, vents and outlets will be.
Measured, cut and hanged sheetrock on ceiling and wall.
April 24 11:00 AM 4:00 PM 5 Cut out area where lights, ceiling fans, vents and outlets will be.
April 30 6:00 PM 6:30 PM 0.5 Cleaned basement from sheetrock dust.