You are on page 1of 1

Topic Strategic Methodology Persons Timeline Budgetary

Goal/Objective Involved Requiremen


s t

ENVIRONMENTAL 1.To ensure the 1.For The May 9, Utilities and


AND WATER protection of the wastewater – representative 2022 – Equipment -
DISPOSAL environment chlorination s and First 10,000
through the regulatory movement
proper water 2. Physical bodies. in the Food and
disposal or checking the Volunteer Block 1 Water - 5,000
management. canal and citizens around area.
other sources the barangay. May 11, Medicine -
2.To conduct an of water 2022 – 1,000
activity for the disposal. Second
innovation of the movement Total =
proper care on in the 16,000
the environment Block 2
through area.
checking the May 13,
drainage water 2022 –
and discharge of Final
water in the movement
community. in the
Block 3
area.

DRAMA SINGING 1. To produce 1.Graphic or Students and Every Talent Fee -


AND ARTS creative works Visual casuals who Saturday 5,000
WORKSHOPS and aspiring Organizers. loves drama, of June
talents in the singing and 2022. Food & water
form of art. 2.Focused art. Also, the – 5,000
exploration, people or
2.To create and Discussion professionals Arts
explore the and who have the Materials –
vision, content, Brainstorming skills to teach 3,000
and talents of in this field.
ambitious Rent for
individual. Location –
2,000

Total =
15,000

You might also like