Group Assignment (30%)

Group 1: Using wind power design 15 kW micro power plant that will electrify rural area that
has 120 residents.
Group 2: Design of 30 kW micro hydro power plant for rural electrification (assume: there are
120 residents that consume different loads).
Group 3: Using solar system design 5 kW power plant for rural electrification that has 60
residents.
N.B: all groups must prepare a document that has 20 – 25 page. And you must submit both in
hard copy and soft copy to my email abrha.ftsum324@gmail.com 3 days before presentation.

Presentation day 10/6/2014 E.C