You are on page 1of 5
Government of West Bengal Public Works Directorate Establishment Branch No.:5744-E/(5)-E/PW/0/E-II/6P-02/17 Date: 12.04.2022, 79.04.2022 From: The Chief Engineer(H.Q), P.W. Directorate. To: 1. The C.G.A. P.W. Directorate 2. The, Zone, PW. Directorate. 3. The. Circle, P.W. Directorate, 4. The EE, sane Division, P.W. Directorate. 5. The Al .$ub-Division, P.W. Directorate. Subject: Final Gradation List of Head Clerks under Public Works Directorate as on 01.04.2022 and ‘Submission of APR. in respect of all the Head Clerks as per above mentioned Gradation list for the purpose of consideration for promotion to the Post of Head Assistant under P.W, Directorate. With reference to the above noted subject, the undersigned is to inform that Final Gradation List of Head Clerks under Public Works Directorate as on 01.04.2022 is prepared and being enclosed along with this Memo. ‘The Gradation List has been prepared on the basis of the Draft Gradation List of Head Clerks under Public Works Directorate as on 01.02.2022 circulated vide Public Works Directorate’s Memo No.5343-E-/PW/G/E-Il/6P-02/17 dated 16.02.2022 and as per available records based on opinions submitted by respective Offices of Public Works Directorate. It is also to be informed that some posts in the Cadre of Head Assistant under P.W. Directorate are lying vacant and in order to fill up these vacant posts by promotion of Head Clerks under P.W. Directorate- He/ She is requested to send A.P.R.s for last 3{three) financial years and up to 31.03.2022 including Service Details as attached in respect of the above mentioned employees under his/her jurisdiction. ‘The desired A.P.R.s may please be forwarded with due recommendation to this office within 15{fifteen) working days from the date of issue of this memo positively failing which the incumbent will not be considered for promotion and the concerned office will be responsible for any future legal complication arises thereof. The office of the Chief Engineer (H.Q.) will not be responsible for such non- receipt of promotion. In this connection, the following information’s may please be forwarded: 1. Whether the incumbent was previously offered promotion to the post of Head Assistant If so, the number and date of such promotion order may please be indicated. 2. Whether the incumbent is willing to accept his/her promotional posting in any office under PW. Directorate in West Bengal. An undertaking from each incumbent in this tune should be accompanied with respective A.P.R.s. Without the said undertaking, the A.P.R. of the respective incumbent will go, be 9” considered. De ob Chief Engineer ( coy Public Works Directorate AbAiSiek, FINAL GRADATION LIST OF HEAD CLERKS UNDER P.W.DTE. AS ON 01.04.2022 st. | Name ofEmployee(with | dateor | Dateof | Dateof | Dateof z pe ae Feet. | joining as | joining as | joining as Place of Posting Remarks Loc. | upc. | H.Clerk. 1 Priya Ranjan Mandi (S.T) 15.08.1972 | 12.10.1995 | 09.08.2006 | 07.12.2015 Western Electrical Circle |Pramotion forgone 2 {sri Atanu Santra (06.09.1965 | 12.09.1983 | 01.08.1999 | 16.12.2015 Planing & Monitoring Circle 3 _|SriAshim Kr.Das 17.02.1963 | 11101988 | 108.1999 | 04.12.2015 Design Division- {1 4 Sri Abani Kr.Pradhan 09.01.1963 | 24.04.1985 | 01.09.2003 | 04.07.2018 Kolkata South Division 5 [Sei Abhijit Bhattacharya 17.09.1966 | 13.01.1986 | 01.09.2004 | 09.08.2018 | Testa Bridge Construction Division 6 |Sri Prabir Sarkar 09.03.1969 | 21.04.1986 | 01.09.2004 14.09.2018, West Kolkata ElectricalDivision 7 {Sri Sankar Paul 03.04.1965 | 19.06.1987 | 01.09.2004 | 21.08.2018. Presidency Circle 3 |sti Pradyot Kr. Mukhopadhyay _| 29.12.1966 | 01.07.1987 | 01.09.2004 | 28.06.2018 Kolkata Central Division ISri Subrata Chattopadhyay 08.10.1965 | 14.07.1987 | 01.09.2004 | 02.07.2018 Barasat Division 10 {Sri Kalyan Kumar Mandal 02.11.1964 | 01.09.1987 } 01.09.2004 | 28.06.2018 Central Electrical Circle [11 sti samican Datta 06.01.1967 | 06.07.1987 | 01.05.2006 | 28.06.2018 South 24 Pgs. Diva 12. [Sri Debojyoti Dutta 01.01.1964 | 01.09.1987 | 01.05.2006 | 29.06.2018 RG Kar MCH El. Sub-Divn 13 {Sri Debasish Singha Roy 07.01.1964 }| 12.11.1987 | 01.05.2006 | 17.07.2018 Alipore Division 14. |Sri Rana Chatterjee 23.01.1970 | 09.05.1988 | 01.05.2006 | 29.06.2018 Eastern Circle 15. |Sri Molay Manna 27.01.1964 | 23.05.1988 } 01.05.2006 | 25.07.2018 Writers® Bldgs. El. Sub-Divn 16 |Sri Kousik Das 08.01.1968 | 24.06.1988 | 01.05.2006 | 09.07.2018 | Bidhannagar Electrical Division. 17 |Sri Rakhal Ch.Das (S.C.) 16.12.1963 | 25.02.1992 | 01.05.2006 | 25.07.2018 South Western El. Circle 18 |Sri Sadananda Mandi (S.T.) 10.07.1964 | 20.01.1995 | 01.05.2006 | 29.06.2018 Bankura Division 19 [Sri Ajoy Kr. Das (S.C) 07.01.1966 | 01.01.1995 | 01.05.2006 | 29.06.2018 Kolkata West Divn. as Asst. Chief Engineer(P); Public Works Directorate Wott Chief Engineer(H.Q); Public Works Directorate a Ren Saaaeegae Gan Dateof | Dateof | Date of SLNo cag D.0.B. | joinas | joinas | joiningas Place of Posting Remarks L.DA UD.C. H. Clerk. 20 |Smt. Moupia Ghosh (Biswas) 25.12.1968 | 28.02.1989 | 01.05.2006 | 28.06.2018 Kolkata East Division 21° ‘|Sri Probir Kr. Saha (S.C_) 05.08,1962 | 05.01.1995 | 01.05.2006 | 14.09.2018 Western Circle - II 22_|sri Arup Pal 01.07.1970 | 10.03.1989 | 01.05.2006 | 28.06.2018 Burdwan Division 23 ‘|Sri Pranab Kr. Halder (S.C) 05.06.1971 | 31.05.1995 | 01.05.2006 | 29.06.2018 Barrackpore 24 [Sri Khokan Sardar (S.T_) 31.12.1962 | 14.09.1994 | 01.05.2006 | 29.06.2018 | _ Kolkata South Health Division 25 _|sri Apurbalal Maitra (S.C.) 16.12.1967 | 20.09.1995 | 01.05.2006 | 06.07.2018 Hooghly Construction Division 26 [sri Uttam Sarkar 25.10.1962 | 07.11.1984 | ot.09.2003 | 31.12.2018 Jalpaiguri Electrical Division 27. sri Bipul Bikas Das 29.01.1963 | 03.05.1986 | 01.09.2004 | 30.08.2018 Jalpaiguri Division 28 |Sri Nabendu Podder 28.06.1969 | 16.06.1988 | 01.05.2006 | 10.09.2018 Kolkata Central Health Division 29 [Sri Kshetra Mohan Majhi (5.7) 12.05.1963 | 17.01.1995 | 01.05.2006 | 31.08.2018 Dakshin Dinajpur Division 30 |Sri Ankur Kumar Banerjee 05.11.1969 | 09.01.1989 | 01.05.2006 | 31.08.2018 Kolkata Health Circle 31_(Sri Mukul Kumar 15.08.1962 | 09.03.1989 | 01.05.2006 | 05.09.2018 Purulia Electrical Division 32. [sri Sanjeet Kumar Mandal 03.02.1965 | 10.05.1989 | 01.05.2006 | 01.03.2019 Northern Electrical Circle. 33_ [sri Mahadeb Mundari (5-7) 20.03.1971 | 13.02.1995 | 01.05.2006 | 12.09.2018 Nadia Electrical Division 34 |Sri Durgadas Bhattacharyya 23.07.1969 | 09.04.1990 | 01.05.2006 | 31.08.2018 Office of the S.G.E, Raj Bhavan 35 [Sri Raj Kumar Samanta 01.12.1967 | 24.04.1990 | 01.05.2006 | 12.09.2018 Design Division-II 36. [Sri Gurai Saren (S.T) 25.08.1977 | 26.05.1998 | 04.01.2007 | 10.09.2018 Jhargram Division, P.W.Dte 37 [srijayanta Talukdar 05.09.1968 | 17.07.1990 | 02.07.2008 | 14.09.2018 Berhampur Division-1 38. [sri Abir Kumar Bhattacharya 09.12.1969 | 23.07.1990 | 02.07.2008 | 31.08.2018 Writers’ Building Sub-Division 39 [SmePiyali Ganguli Sengupta) | 03.01.1972 } 14.09.1990 | 02072008 | 01.10.2018 Survey Division 40_ [Smt Mamata Das 25.02.1971 | 01.11.1990 | 02.07.2008 | 10.09.2018 Purulia Division lll.s Asst. Chief Engineer(P); Public Works Directorate ewe? Chief Engineer(H.Q); Public Works Directorate Name of Employee (with Date of Date Ort ose on. : SLNo cay p.0.B. | joinas | joinas | joiningas Place of Posting Remarks uoc | upc | H.Clerk. 41 [Sri Surojit Ghosh 01.03.1972 | 09.01.1991 | 02.07.2008 | 31.08.2018 Bongaon Sub-Division 42__ [Smet Bhabani Das 23.07.1963 | 30.05.1991 | 02.07.2008 | 31.08.2018 City Division 43 [Sme Mathura Pradhan 11.02.1967 | 11.06.1992 | 02.07.2008 | 29.10.2018 | North Bengal Construction Division 44 {Sri Asim Kr. Mondal 29.05.1963 | 25.07.1991 | 02.07.2008 | 31.08.2018 Diamond Harbour Division 45. [Sri Shyama Prasad Mukherjee 21.01.1963 | 01,08,1991 | 02.07.2008 | 28.09.2018 Birbhum Division 46 |Sri Debi Prosad Maji 07.05.1962 | 26.07.1991 | 02.07.2008 }| 31.08.2018 Howrah Construction Division 47 |Sri Bhola Nath Bhattacherjee 25.08.1963 | 29.07.1991 | 02.07.2008 | 13.09.2018 Kolkata South Health El. Di 48 |Sri Subal Kr. Saha 18.06.1963 | 04.10.1991 | 02.07.2008 | 14.09.2018 Central Circle 49 [Sri Sentu Kr. Saha (S.C) 01.01.1964 | 05.01.1995 | 02.07.2008 | 10.10.2018 ‘Asansol Flectrical Division 50 |Sri Mrityunjoy Malik (S.C) 05.06.1962 | 02.01.1995 | 02.07.2008 | 06.09.2018 Burdwan Sub-Division 51 |sri Ranjit Mondal (S.C) 24.02.1963 | 14.09.1994 | 02.07.2008 | 13.09.2018 | Sentral ee Sa '52_|sri Sudipta Das 15.01.1966 | 01.08.1991 | 01.10.2009 | 06.09.2018, Kolkata West Sub-Division4l 53 |Sri Sukhendu Kr. Paria 17.04.1965 | 29.10.1991 | 01.10.2009 } 13.09.2018 Midnapore Division s4_|sriPrabir Kr. Paul 08.02.1968 | 21.02.1992 | 01.10.2009 | 12.11.2018 Presidency Electrical Circle 55__|Sri Samir Roy (S.C) 04.05.1968, 09.1995 | 01.10.2009 | 01.11.2018 Nadia Construction Division 6 {Sri Paresh Kr. Chanda 04.03.1968 | 10.03.1992 | 01.12.2011 | 26.10.2018 Kolkata North Division 57 _|SriAdeep Sharma 16.07.1970 | 29.02.1992 | 01.12.2011 | 06.09.2018 N.BC.C.-I1 56 _|SriDilip Ghosh 21.01.1968 | 12.06.1991 | 01.12.2011 | 31.08.2018 Howrah Division 59 |Sri Amit Kr Modak 02.03.1970 | 14.06.1991 | 01.12.2011 | 31.08.2018. Kolkata Electrical Circle 60 {Smt Arpita Ghosh (Biswas) 27.02.1972 | 01.02.1993 | 01.12.2011 10.09.2018 Nabanna Circle 61 |Sri Biswanath Mandal(S.C) 16.01.1969 | 17.11.1999 | 01.12.2011 | 30.08.2018 Kolkata Health Electrical Circle 62 |Sri Bikash Singh (S.C) 16.06.1973 | 04.02.2008 | 01.12.2011 | 24.09.2018 Darjeeling Electrical Division 63_|Sri Jagdish Ram (S.T) Ah\ 01.03.1978 | 16.07.2010 | 26.07.2016 | 29.11.2018 0/0 The Chief Govt. Architect. ‘Asst. Chief Engineer(P); Public Works Directorate Chief Engineer(H.Q); Public Works Directorate :SERVICE DETAILS: Name(In Block letter) Designation H.R.M.S ID Contact No gp one Home Address 6. Present Address 7. Date Of Birth 8. Date of Entry into Govt. Service 9. Appointment Order No & Date 10. Present Place Of Posting 11. Whether Confirmed or Not If Yes, Confirmation Order No. If No, Give Reason 12. Whether submitted Declaration of Assets Statement Regularly and Up-to-date since joining. 13. Whether any action has been taken from Authority against him/her as per + Sub Rule-1 of Rule-7 of West Bengal Services (Classification, Control & Appeal) Rules-1971 Signature with Date & Seal By The Head of Office

You might also like