You are on page 1of 1

MDD 2.

10
MEAN WT OF SAND IN CONE OF POURING CYLINDER(W2) GR 356
VOLUME OF CALIBRATING CYLINDER (V)CC 1178
WT OF SAND+ CYLINDER BEFORE POURING(W1) GR 6000
WT OF SAND+ CYLINDER AFTER POURING(W3) GR 4090
WT OF SAND TO FILL CALIBRATING CYLINDER Wa =(W1-W2-W3) gm 1554
BULK DENSITY OF SAND Ys =(Wa/V) Gm/CC 1.32

1
DETERMINATION NUMBER
WT OF EXCAVATED GSB FROM HOLE (ww)gm 2472
WT OF SAND+ CYLINDER BEFORE POURING(W1) GR 6000
WT OF SAND+ CYLINDER AFTER POURING(W4) GR 4190
WT OF SAND IN HOLE 1454
BULK DENSITY Yb=(Ww/Wb)Xys gm/cc 2.243
MOISTURE CONTENT 6
CORRECTED MOISTURE CONTENT 6.38
DRY DENSITY 2.108
% COMPACTION 100.38

You might also like