Activities for Estimation

Ground Floor
1) Site Cleaning

2) Site Layout

3) Excavation for Foundation

4) Soaling

5) PCC for Foundation

6) Concrete for Foundation

7) Concrete for coloumn up to plinth

8) Back Filling in foundation pit

9) Concrete for Ground beam

10) Brickwork Above ground beam

11) Murum filling in plinth

12) PCC over plinth

13) Concrete for coloum up to first Floor

14) Concrete for Beam

15) Concrete for slab

16) Brick Work for superstructure

17) Wood Work Qty for door frame

18) Shutter qty for door

19) Wood Work/ Steel Qty for window frame

20) Shutter qty / galss qty for window


21) Internal Plaster

22) External Plaster

23) Ceiling Plaster

24) Flooring

25) Skirting

26) Dado work in bathroom and above kitchen otta

27) Kitchen otta

29) Concrete qty for staircase

30) White Washing

31) No of Basin

32) Steel Reinforcement

33) Number of basin

34) No of toilet pan

35) painting
First Floor

1) Concrete for coloum up to second /terrace Floor

2) Concrete for Beam

3) Concrete for slab

4) Brick Work for superstructure

5) Wood Work Qty for door frame

6) Shutter qty for door

7) Wood Work/ Steel Qty for window frame

8) Shutter qty / galss qty for window

9) Internal Plaster

10) External Plaster

12) Ceiling Plaster

13) Flooring

14) Skirting

15) Dado work in bathroom and above kitchen otta

16) Kitchen otta ( if applicable)

17) Concrete qty for staircase

18) White Washing

19) No of Basin

20) Steel Reinforcement

23) Number of basin

24) No of toilet pan

25) Painting
Terrace Floor

1) Brick work for parapet wall

2) Plaster for parapet wall

3) Brick work for head room

4) Plaster for head room

5) Water proofing for terrace.

6) White Washing

7) Painting