It should be no surprise to energy observers that solar generation on commercial


properties is becoming mainstream.

CSR Building Knowledge

Making Solar Work for Commercial Buildings Share

Cookie policy

In July this year 20 per cent of the total rebates generated for solar in Australia came via commercial
installations, with most of that originating from systems between 30kW-100kW.

Residentially focused rebates and tariffs have wound down in recent years, concurrent with the rise of energy
supply and network costs and a significant reduction in the cost of solar equipment and installation labour.

In a radical departure from the traditionally domestic market, commercial solar is creating challenges for those
considering investment, particularly as the complexities of system design and installation such as system
sizing, technical, compliance, grid connection et cetera also change – and as the language around purchasing
changes to one of commercial investment –capital expenditure, ROI etc.
Unfortunately, having grown up in the domestic solar market few solar suppliers understand these changes to
commercial investment and language; and fewer still have the engineering and project management capability
to design and deliver a complex electrical infrastructure upgrade like a commercial solar installation.

The key to solar design for commercial properties is to work within a site’s consumption curve – seeking to
design a system that will only off-set consumption (controlling feed into the grid).

This is done by analysing the site’s demonstrated energy profile (reliable historical analysis, ideally at the smart
meter level) and understanding what the business does – its operational hours and business type. Tariffs,
rates, supply versus network ratios and kWh consumed all play a key role in designing the right system.

Very few businesses can offset their total energy usage through solar generation alone, but it is possible to
offset up to 80-90% of business hour usage through the right design methodology.

Controlling feed-in to the grid


Feeding energy to the grid (also known as exporting energy) is the new bastion of regulation by energy supply
authorities and providers.

This is for good reason: the huge influx in solar installations in commercial and industrial areas (usually
concentrated around sales and marketing campaigns) is creating worrying levels of energy feed into the grid.

Consider industrial estates with several hundred kW of solar installed, and no-one working during the
weekends – this is a lot of solar energy moving out of a site and into the grid, causing voltage rise and damage
to the ‘poles and wires’ (transformers and sub-stations).

Even the most perfectly design system (for a business’s operational hours) can create feed-in at different times
of the year. Consider the following example – same site, different days of the week:
(http://www.csrbuildingknowledge.com.au/wp-content/uploads/2015/10/solar-1.png)
This area of solar connection (connection of solar systems to the local grid network) is increasingly under
scrutiny, with Queensland already tightening its ruling around grid connection and feed in: specifically, if your
system has the appropriate hardware to control export to the grid, your connection pre-approval will likely be
successful.

This aspect of solar design is critical, and should form the first steps in any solar design.

Structural reinforcement?
The structural impact of solar on most commercial buildings 25-30 years old or less is negligible. Most
buildings simply don’t require their entire roof filled, and those that do are big enough to have the right
structural integrity in place already.

Solar generation on commercial buildings will only continue to expand, eventually being expected on all new
builds.

Energy load forecasting is usually carried out during a building’s early stages, thus allowing some level of solar
design assessment – given there is no historical data to work from for a new building.

If applied at the right time of the building’s life (during the concept, design or architectural stages) there are
functional and cost reduction benefits for making the building ‘solar ready.’

Conserve before create


Energy improvement strategies – programs within a business designed to reduce the operational costs
associated with energy – should always start with reducing consumption first: power quality and regulation
(voltage optimisation, load management and curtailment etc.); energy efficiency (HVAC, lighting and associated
control systems); as well as good old fashioned behaviour change should be considered before the application
of solar.

Storage
The storage situation is developing rapidly as battery storage sees the same commercialisation that solar PV
has in recent years – technology innovation, increased market uptake, reduced manufacturing costs and the
related economies of scale – that will drive price down arguably within the decade and suddenly shift the
investment scenario for battery storage in commercial buildings.

About Us ()

Sustainability (/about-us/sustainability)
Community (/about-us/community)
Terms & Conditions of Sale (http://www.csr.com.au/~/media/corporate/files/csr-bp-terms-conditions-web.pdf?la=en)
Workplace Health & Safety (/about-us/workplace-health-safety-environment)
Contact Us (/about-us/contact-us)
Building Knowledge ()

Building Science (/building-knowledge/building-science)


Design Trends (/building-knowledge/design-trends)
Industry News (/building-knowledge/industry-news)
Internal Environments (/building-knowledge/internal-environments)
Research (/building-knowledge/research)
Practical Tips (/building-knowledge/practical-tips)
Building Solutions ()

Detached Homes (/building-solutions/detached-homes)


Multi Residential (/building-solutions/apartments)
Commercial and Retail (/building-solutions/commercial-and-retail)
Industrial, Warehousing & Civil Infrastructure (/building-solutions/warehousing-and-civil)
Health, Education & Public Buildings (/building-solutions/health-and-education)
Offsite and Prefab (/building-solutions/offsite-and-prefab)
Brands ()

AFS (/brands/afs)
Bradford (/brands/bradford)
Cemintel (/brands/cemintel)
Edmonds (/brands/edmonds)
Gyprock (/brands/gyprock)
Hebel (/brands/hebel)
Himmel (/brands/himmel)
Martini (/brands/martini)
Monier (/brands/monier)
PGH (/brands/pgh)
Potter (/brands/potter)
Investor Relations & News ()

News Releases (/investor-relations-and-news/csr-news-releases)


Presentation & Results (/investor-relations-and-news/presentations-and-results)
Annual Meeting & Reports (/investor-relations-and-news/annual-meetings-and-reports)
Webcasts (/investor-relations-and-news/webcasts)
Share Information (/investor-relations-and-news/share-information)
Corporate Governance (/investor-relations-and-news/corporate-governance)
FAQs (/investor-relations-and-news/faqs)
Careers ()

Job search (http://careers.pageuppeople.com/332/cw/en/listing)


Our People (/careers/our-people)
Our Values (/careers/our-values)
Rewards & Benefits (/careers/rewards-and-benefits)
Fairness Respect & Diversity Policy (/careers/our-people/fairness-respect-and-diversity-policy)

Corporate Headquarters
Triniti 3, 39 Delhi Road, North Ryde, NSW 2113, Australia
Telephone : +61 2 9235 8000 - Fax : +61 2 8362 9013

CSR Limited 2019, All rights reserved Security and Policy Statement (/Security-and-Privacy-Statement) Website Terms
of Use (/Website-Terms-of-Use)
This website uses cookies. For further details, please review our Website Terms and Conditions (/Security-and-Privacy-
Statement)
Corporate Headquarters
Triniti 3, 39 Delhi Road, North Ryde, NSW 2113, Australia
Telephone : +61 2 9235 8000
Fax : +61 2 8362 9013
Telephone : +61 2 9235 8000 - Fax : +61 2 8362 9013

CSR Limited 2019, All rights reserved


Security and Policy Statement (/Security-and-Privacy-Statement)
Website Terms of Use (/Website-Terms-of-Use)
This website uses cookies. For further details, please review our Website Terms and Conditions (/Security-and-Privacy-Statement)
Back to Top

(/)

You might also like