BACK UP VOLUME

tahap 1 Ibu Runi Jl Mekar Kendari


Tinggi 0-3.5 mtr
No Pek. Pek. Pek. Pek. Pek.
Galian Tanah + Pondasi Sloef Praktis Ringbalk Kolom Blk Latei
(m) (m) Praktis (m) Praktis (m) (m)
Vertikal 14.5 14.5 14.5 31x 3.5
15.5 15.5 15.5 31
3.5 3.5 3.5 3.5
5 5 5 108.5 10
5 5 5
15.5 15.5 15.5
3.5 3.5 3.5
1.5 1.5 1.5
2.5 2.5 2.5
horisontal 17 17 17 17
17 17 17
17 17 17
1.25 1.25 1.25
17 17 17
14.5 14.5 0
TOTAL 150.25 150.25 135.75 108.5 27
Tinggi 3.5-5.5 Mtr 22
15 2
17
15.5
5
5
5
3.5
3.5
69.5 44
Total 205.25 152.5 27
Ongkos Kerja 6,010,000 5,258,750 8,210,000 5,337,500 1,080,000

Total Bayar 68,675,837

Pondasi + Galian 40,000


Sloef 35,000
Kolom Praktis 35,000
Ringbalk 40,000
blk latei 40,000
Plesteran 20,000
Acian + Cat 20,000
Psg Bata /M3 450,000
Pek. Pek. Pek.
Pasang Bata Plesteran Acian
M2 M2 M32
3.1

465.775

1 m3 Bata = 11.5 Mtr 465.78 465.78


11.5

40.50 465.78 465.78

2 2 2

139 139 139

12.09 12.09 12.09


52.59 477.86 477.86
23,665,109 9,557,239 9,557,239