You are on page 1of 2

SECTION A-A

ELEVATION
SECTION A-A

ELEVATION
FINAL STAGE

PLAN

PLAN

SECTION A-A

ELEVATION
1st STAGE

Y X

PLAN

SLIDING ARRANGEMENT OF GIRDER

SECTION A-A

MIN 115
ELEVATION
DETAIL OF ROLLER
2nd STAGE
Ø 115
40 40

325
ENLARGED VIEW AT Y ENLARGED VIEW AT X 145
VIEW PARALLEL TO TRACK VIEW PROP. TO TRACK 75
507
25
ELEVATION
50 255

507

395
300

PLAN 600 610


Ø 26.5 THROUG HOLE
PLAN
RAIL CLUSTER FOR DETAIL OF GUIDED ROLLER
ROLLING PLATFORM 600 (ALTENATE )

1800

ISA 75X75X8

150
ENLARGED VIEW OF ISA 75X75X8
CRIB STAGING LAYOUT
ROLLING PLATFORM IN
IN PLAN
ELEVATION SCALE 1:50
SCALE 1 : 50 DETAIL AT X
SECTION A-A ( Can be altered as per site requirement )
ISA 75X75X8

ELEVATION
3rd STAGE

PLAN
75MMX75MMX8 ISA 75X75X8

29-03-2022

ISSUED FOR CONSTRUCTION

Drawn Checked Name of Railway: EAST COST RAILWAY


S.P. V.B.
Name of Division: KHURDA DIVISION
Designed Verified
Name of Section: BHADHRAK-DHAMRA PORT (DTY)
C:\Users\sudhi\OneDrive\Desktop\SISCO_LAUNCHING _SCHEME\BR.NO 39\unnamed.jpg
Sign :
Benchmarking Infrastructure

KEC International Limited Howe Engineering Projects (India) Pvt. Ltd.


Steel Infra Solutions Private Limited Aravalli House, At Shantigram Township,
8th Floor, Building No. 9A, Name of Work:
Plot No. 31, Light Industrial Area Near Vaishnodevi Circle, SG Highway,
DLF Cyber City, Phase III, LOI Ref. No:
Bhilai (Chhattisgarh)- 490026 Ahmedabad - 382421
Gurgaon (Haryana) - 122002 Indian Port Rail Corporation Limited Gujarat, India Approved Name of Drawing Title: LAUNCHING SCHEME OF BR.NO 125
Date: Client Drawing No: H-W020-600-E-BS-DG-101
ISSUED FOR CONSTRUCTION

Drawn Checked Name of Railway: EAST COST RAILWAY


S.P. V.B.
Name of Division: KHURDA DIVISION
Designed Verified
Name of Section: BHADHRAK-DHAMRA PORT (DTY)

Name of Work:

LOI Ref. No: HOWE/DHAMRA/LoI/2021/125 DATED: 27-12-2021

Approved Name of Drawing Title: LAUNCHING SCHEME OF BR.NO 125

Date: Client Drawing No: H-W020-600-E-BS-DG-101 Sheet: 02 OF 02 Scale: AS SHOWN Rev. 0

You might also like