Professional Documents
Culture Documents
NOTES:
2. EXISTING PIPELINE LOCATION, DEPTH AND ROAD WIDTH MAY VARY BASED ON ACTUAL SITE VERIFICATION DURING CONSTRUCTION.
3. DEPTH IS NOT IDENTIFIED DURING SURVEY AND TO BE VERIFIED THE EXACT CROSSING LOCATION OF THE EXISTING BURIED CABLE & PIPELINE
DURING CONSTRUCTION.