You are on page 1of 1
4. The status of compliance of the condiians spulsted fn the ‘environmental clearance as highlighted in the repent) wil be subsequently dicussed by the respective Expert Appratial Committees uring the appralial of the expension proposal end duly recorded (n the mintes of the meeting. Applications for expansion project received without the complanee status as mentioned in pare 0.2 above shall not be accepted and placed for consideration before the Expert Appraisal Commitee.” Based on the above observations, the SEAC decded to dict the proponent to fle 2 fresh application under exparsion withthe following deta 1. The proponent shell submit the deal f all the consent obtained from TNPCB fr this project. 2. The project proponent shall submit 2 certifed compliance report for the Conditions sipulated in the environmental clearances dated 15,04:2014 and 24.02.2015 trom the competent authority 0s per the office memorandum of MoBFECC dated 30" May 2012. 3. This project is an expension projec, hence the project proponent shall fumish the existing building details with built wp area and the projeet proponent shall furish the date of completion for al erie bung. 4, The projec propcnent sell ubmit a plan on type of industries to be planned {nthe industrial shee. Further the SEAC also requerathe SEIAA cific to varity the above facts and furnish the detelled note before placing ary application related this project namely MVs WsMinplex india Prvete United at Maduravasal Vilage, Uthukotai Talule Tinvallur Distic, Fioally, the meeting endect with thanks to the Chairman and members at 08:30 PIM. b= — MEMBER SECRETARY CHAIRMAN, SEAC-IN SEAC. TN De. 8. SatVAN B beg MOMAN

You might also like