Roughly, 3000 kg of strand pre coil, therefore total coil required = 22 Coils Prepared By,
4) Tendon Ducting
1 Project Data
Central Spine Road (CSR4C) - Bridge
Title of the project
11
Identification of project
Author Ahmad Nafek Bin August Fouzy
Description Longitudinal Bar & Stirrup
Date Sunday, May 8, 2022
National code EN
National annex EN
2 Concrete design
National code
EN 1992-1-1:2014-12
National code
EN 1992-2:2008-07
Design working life 1200 years
Material of reinforcement
Bill of material
Length Concrete Reinforcement Total weight Reinforcement / m³ concrete
[m] Name [m3] [kg] [kg] [kg] [kg/m3]
59.75 C70/85 71.69 179235 7166 186401 100
Φ Length Weight
Material Type of reinforcement
[mm] [m] [kg]
16 B 500B Reinforcement bars 468.62 740
16 B 500B Stirrups 405.92 641
12 B 500B Reinforcement bars 1968.31 1747
12 B 500B Stirrups 4548.69 4038
Reinforcement zones
Begin End Length
Zone Reinforcement
[m] [m] [m]
1 0.00 0.89 0.89 A-A
2 0.89 2.39 1.50 B-B
3 2.39 2.60 0.21 C-C
4 2.60 5.89 3.29 D-D
5 5.89 7.39 1.50 E-E
6 7.39 9.09 1.70 F-F
7 9.09 15.16 6.08 G-G
8 15.16 19.49 4.32 H-H
9 19.49 19.69 0.20 I-I
10 19.69 20.29 0.60 J-J
11 20.29 20.49 0.20 K-K
12 20.49 39.26 18.77 L-L
13 39.26 39.46 0.20 M-M
14 39.46 40.06 0.60 J-J
15 40.06 40.26 0.20 N-N
16 40.26 44.59 4.32 H-H
17 44.59 50.66 6.08 G-G
18 50.66 52.36 1.70 F-F
19 52.36 53.86 1.50 O-O
20 53.86 57.15 3.29 P-P
21 57.15 57.36 0.21 Q-Q
22 57.36 58.86 1.50 R-R
23 58.86 59.75 0.89 A-A
Project: Central Spine Road (CSR4C) - Bridge 11
Project no: 104
Author: Ahmad Nafek Bin August Fouzy
Reinforcement:
6ø12 (679mm²) (B 500B), z = 1373 mm
2ø12 (226mm²) (B 500B), z = 1311 mm
2ø12 (226mm²) (B 500B), z = 1110 mm
2ø12 (226mm²) (B 500B), z = 816 mm
2ø12 (226mm²) (B 500B), z = 523 mm
2ø12 (226mm²) (B 500B), z = 229 mm
2ø12 (226mm²) (B 500B), z = -64 mm
2ø12 (226mm²) (B 500B), z = -358 mm
Section 4 (4.24m) 2ø12 (226mm²) (B 500B), z = -651 mm
2ø12 (226mm²) (B 500B), z = -878 mm
2ø12 (226mm²) (B 500B), z = -973 mm
2ø12 (226mm²) (B 500B), z = -1068 mm
6ø16 (1206mm²) (B 500B), z = -1119 mm
Stirrups:
ø12 (B 500B) - 175 mm
ø12 (B 500B) - 175 mm
ø12 (B 500B) - 175 mm
ø12 (B 500B) - 175 mm
Project: Central Spine Road (CSR4C) - Bridge 11
Project no: 104
Author: Ahmad Nafek Bin August Fouzy
Reinforcement:
6ø12 (679mm²) (B 500B), z = 1355 mm
2ø12 (226mm²) (B 500B), z = 1293 mm
2ø12 (226mm²) (B 500B), z = 1079 mm
2ø12 (226mm²) (B 500B), z = 814 mm
2ø12 (226mm²) (B 500B), z = 548 mm
2ø12 (226mm²) (B 500B), z = 282 mm
2ø12 (226mm²) (B 500B), z = 17 mm
2ø12 (226mm²) (B 500B), z = -249 mm
2ø12 (226mm²) (B 500B), z = -515 mm
Section 5 (6.64m) 2ø12 (226mm²) (B 500B), z = -781 mm
2ø12 (226mm²) (B 500B), z = -1021 mm
2ø12 (226mm²) (B 500B), z = -1066 mm
2ø12 (226mm²) (B 500B), z = -1111 mm
6ø16 (1206mm²) (B 500B), z = -1137 mm
Stirrups:
ø12 (B 500B) - 200 mm
ø12 (B 500B) - 200 mm
ø12 (B 500B) - 200 mm
ø12 (B 500B) - 200 mm
ø12 (B 500B) - 200 mm
Reinforcement:
6ø12 (679mm²) (B 500B), z = 1339 mm
2ø12 (226mm²) (B 500B), z = 1277 mm
2ø12 (226mm²) (B 500B), z = 1119 mm
2ø12 (226mm²) (B 500B), z = 905 mm
2ø12 (226mm²) (B 500B), z = 691 mm
2ø12 (226mm²) (B 500B), z = 478 mm
2ø12 (226mm²) (B 500B), z = 264 mm
2ø12 (226mm²) (B 500B), z = 50 mm
2ø12 (226mm²) (B 500B), z = -164 mm
Section 6 (8.24m), 2ø12 (226mm²) (B 500B), z = -377 mm
Section 18 (51.51m) 2ø12 (226mm²) (B 500B), z = -591 mm
2ø12 (226mm²) (B 500B), z = -805 mm
2ø12 (226mm²) (B 500B), z = -967 mm
2ø12 (226mm²) (B 500B), z = -1043 mm
8ø16 (1608mm²) (B 500B), z = -1153 mm
Stirrups:
ø12 (B 500B) - 200 mm
ø12 (B 500B) - 200 mm
ø12 (B 500B) - 200 mm
ø12 (B 500B) - 200 mm
ø12 (B 500B) - 200 mm
Project: Central Spine Road (CSR4C) - Bridge 11
Project no: 104
Author: Ahmad Nafek Bin August Fouzy
Reinforcement:
6ø12 (679mm²) (B 500B), z = 1339 mm
2ø12 (226mm²) (B 500B), z = 1277 mm
2ø12 (226mm²) (B 500B), z = 1119 mm
2ø12 (226mm²) (B 500B), z = 905 mm
2ø12 (226mm²) (B 500B), z = 691 mm
2ø12 (226mm²) (B 500B), z = 478 mm
2ø12 (226mm²) (B 500B), z = 264 mm
2ø12 (226mm²) (B 500B), z = 50 mm
2ø12 (226mm²) (B 500B), z = -164 mm
Section 7 (12.13m), 2ø12 (226mm²) (B 500B), z = -377 mm
Section 17 (47.62m) 2ø12 (226mm²) (B 500B), z = -591 mm
2ø12 (226mm²) (B 500B), z = -805 mm
2ø12 (226mm²) (B 500B), z = -967 mm
2ø12 (226mm²) (B 500B), z = -1043 mm
8ø16 (1608mm²) (B 500B), z = -1153 mm
Stirrups:
ø12 (B 500B) - 225 mm
ø12 (B 500B) - 225 mm
ø12 (B 500B) - 225 mm
ø12 (B 500B) - 225 mm
ø12 (B 500B) - 225 mm
Reinforcement:
6ø12 (679mm²) (B 500B), z = 1339 mm
2ø12 (226mm²) (B 500B), z = 1277 mm
2ø12 (226mm²) (B 500B), z = 1119 mm
2ø12 (226mm²) (B 500B), z = 905 mm
2ø12 (226mm²) (B 500B), z = 691 mm
2ø12 (226mm²) (B 500B), z = 478 mm
2ø12 (226mm²) (B 500B), z = 264 mm
2ø12 (226mm²) (B 500B), z = 50 mm
2ø12 (226mm²) (B 500B), z = -164 mm
Section 8 (17.33m), 2ø12 (226mm²) (B 500B), z = -377 mm
Section 16 (42.42m) 2ø12 (226mm²) (B 500B), z = -591 mm
2ø12 (226mm²) (B 500B), z = -805 mm
2ø12 (226mm²) (B 500B), z = -967 mm
2ø12 (226mm²) (B 500B), z = -1043 mm
8ø16 (1608mm²) (B 500B), z = -1153 mm
Stirrups:
ø12 (B 500B) - 300 mm
ø12 (B 500B) - 300 mm
ø12 (B 500B) - 300 mm
ø12 (B 500B) - 300 mm
ø12 (B 500B) - 300 mm
Project: Central Spine Road (CSR4C) - Bridge 11
Project no: 104
Author: Ahmad Nafek Bin August Fouzy
Reinforcement:
6ø12 (679mm²) (B 500B), z = 1284 mm
2ø12 (226mm²) (B 500B), z = 1222 mm
2ø12 (226mm²) (B 500B), z = 1143 mm
2ø12 (226mm²) (B 500B), z = 1065 mm
2ø12 (226mm²) (B 500B), z = 883 mm
2ø12 (226mm²) (B 500B), z = 790 mm
2ø12 (226mm²) (B 500B), z = 623 mm
2ø12 (226mm²) (B 500B), z = 515 mm
2ø12 (226mm²) (B 500B), z = 363 mm
2ø12 (226mm²) (B 500B), z = 240 mm
2ø12 (226mm²) (B 500B), z = 104 mm
2ø12 (226mm²) (B 500B), z = -35 mm
2ø12 (226mm²) (B 500B), z = -156 mm
Section 9 (19.59m) 2ø12 (226mm²) (B 500B), z = -310 mm
2ø12 (226mm²) (B 500B), z = -416 mm
2ø12 (226mm²) (B 500B), z = -585 mm
2ø12 (226mm²) (B 500B), z = -676 mm
2ø12 (226mm²) (B 500B), z = -860 mm
2ø12 (226mm²) (B 500B), z = -935 mm
2ø12 (226mm²) (B 500B), z = -1016 mm
2ø12 (226mm²) (B 500B), z = -1093 mm
8ø16 (1608mm²) (B 500B), z = -1208 mm
Stirrups:
ø12 (B 500B) - 300 mm
ø12 (B 500B) - 300 mm
ø12 (B 500B) - 300 mm
ø12 (B 500B) - 300 mm
ø12 (B 500B) - 300 mm
Reinforcement:
6ø12 (679mm²) (B 500B), z = 1268 mm
2ø12 (226mm²) (B 500B), z = 1061 mm
2ø12 (226mm²) (B 500B), z = 1049 mm
2ø12 (226mm²) (B 500B), z = 804 mm
2ø12 (226mm²) (B 500B), z = 774 mm
2ø12 (226mm²) (B 500B), z = 547 mm
2ø12 (226mm²) (B 500B), z = 499 mm
2ø12 (226mm²) (B 500B), z = 290 mm
2ø12 (226mm²) (B 500B), z = 224 mm
2ø12 (226mm²) (B 500B), z = 33 mm
2ø12 (226mm²) (B 500B), z = -51 mm
2ø12 (226mm²) (B 500B), z = -224 mm
2ø12 (226mm²) (B 500B), z = -326 mm
Section 10 (19.99m), 2ø12 (226mm²) (B 500B), z = -481 mm
Section 14 (39.76m) 2ø12 (226mm²) (B 500B), z = -601 mm
2ø12 (226mm²) (B 500B), z = -738 mm
2ø12 (226mm²) (B 500B), z = -876 mm
2ø12 (226mm²) (B 500B), z = -995 mm
1ø12 (113mm²) (B 500B), Position -313, -1046
mm
1ø12 (113mm²) (B 500B), Position -534, -1114
mm
8ø16 (1608mm²) (B 500B), z = -1224 mm
Stirrups:
ø12 (B 500B) - 300 mm
ø12 (B 500B) - 300 mm
ø12 (B 500B) - 300 mm
ø12 (B 500B) - 100 mm
ø12 (B 500B) - 100 mm
Project: Central Spine Road (CSR4C) - Bridge 11
Project no: 104
Author: Ahmad Nafek Bin August Fouzy
Reinforcement:
6ø12 (679mm²) (B 500B), z = 1284 mm
2ø12 (226mm²) (B 500B), z = 1222 mm
2ø12 (226mm²) (B 500B), z = 1065 mm
2ø12 (226mm²) (B 500B), z = 1043 mm
2ø12 (226mm²) (B 500B), z = 795 mm
2ø12 (226mm²) (B 500B), z = 790 mm
2ø12 (226mm²) (B 500B), z = 548 mm
2ø12 (226mm²) (B 500B), z = 515 mm
2ø12 (226mm²) (B 500B), z = 301 mm
2ø12 (226mm²) (B 500B), z = 240 mm
2ø12 (226mm²) (B 500B), z = 54 mm
2ø12 (226mm²) (B 500B), z = -35 mm
2ø12 (226mm²) (B 500B), z = -194 mm
Section 11 (20.39m) 2ø12 (226mm²) (B 500B), z = -310 mm
2ø12 (226mm²) (B 500B), z = -441 mm
2ø12 (226mm²) (B 500B), z = -585 mm
2ø12 (226mm²) (B 500B), z = -688 mm
2ø12 (226mm²) (B 500B), z = -860 mm
2ø12 (226mm²) (B 500B), z = -935 mm
2ø12 (226mm²) (B 500B), z = -1001 mm
2ø12 (226mm²) (B 500B), z = -1098 mm
8ø16 (1608mm²) (B 500B), z = -1208 mm
Stirrups:
ø12 (B 500B) - 300 mm
ø12 (B 500B) - 300 mm
ø12 (B 500B) - 300 mm
ø12 (B 500B) - 300 mm
ø12 (B 500B) - 300 mm
Reinforcement:
6ø12 (679mm²) (B 500B), z = 1339 mm
2ø12 (226mm²) (B 500B), z = 1277 mm
2ø12 (226mm²) (B 500B), z = 1119 mm
2ø12 (226mm²) (B 500B), z = 905 mm
2ø12 (226mm²) (B 500B), z = 691 mm
2ø12 (226mm²) (B 500B), z = 477 mm
2ø12 (226mm²) (B 500B), z = 264 mm
2ø12 (226mm²) (B 500B), z = 50 mm
2ø12 (226mm²) (B 500B), z = -164 mm
2ø12 (226mm²) (B 500B), z = -378 mm
Section 12 (29.88m)
2ø12 (226mm²) (B 500B), z = -591 mm
2ø12 (226mm²) (B 500B), z = -805 mm
2ø12 (226mm²) (B 500B), z = -967 mm
2ø12 (226mm²) (B 500B), z = -1043 mm
8ø16 (1608mm²) (B 500B), z = -1153 mm
Stirrups:
ø12 (B 500B) - 300 mm
ø12 (B 500B) - 300 mm
ø12 (B 500B) - 300 mm
ø12 (B 500B) - 300 mm
ø12 (B 500B) - 300 mm
Project: Central Spine Road (CSR4C) - Bridge 11
Project no: 104
Author: Ahmad Nafek Bin August Fouzy
Reinforcement:
6ø12 (679mm²) (B 500B), z = 1284 mm
2ø12 (226mm²) (B 500B), z = 1222 mm
2ø12 (226mm²) (B 500B), z = 1143 mm
2ø12 (226mm²) (B 500B), z = 1065 mm
2ø12 (226mm²) (B 500B), z = 883 mm
2ø12 (226mm²) (B 500B), z = 790 mm
2ø12 (226mm²) (B 500B), z = 623 mm
2ø12 (226mm²) (B 500B), z = 515 mm
2ø12 (226mm²) (B 500B), z = 363 mm
2ø12 (226mm²) (B 500B), z = 240 mm
2ø12 (226mm²) (B 500B), z = 104 mm
2ø12 (226mm²) (B 500B), z = -35 mm
2ø12 (226mm²) (B 500B), z = -156 mm
Section 13 (39.36m) 2ø12 (226mm²) (B 500B), z = -310 mm
2ø12 (226mm²) (B 500B), z = -416 mm
2ø12 (226mm²) (B 500B), z = -585 mm
2ø12 (226mm²) (B 500B), z = -676 mm
2ø12 (226mm²) (B 500B), z = -860 mm
2ø12 (226mm²) (B 500B), z = -935 mm
2ø12 (226mm²) (B 500B), z = -1001 mm
2ø12 (226mm²) (B 500B), z = -1098 mm
8ø16 (1608mm²) (B 500B), z = -1208 mm
Stirrups:
ø12 (B 500B) - 300 mm
ø12 (B 500B) - 300 mm
ø12 (B 500B) - 300 mm
ø12 (B 500B) - 300 mm
ø12 (B 500B) - 300 mm
Reinforcement:
6ø12 (679mm²) (B 500B), z = 1284 mm
2ø12 (226mm²) (B 500B), z = 1222 mm
2ø12 (226mm²) (B 500B), z = 1065 mm
2ø12 (226mm²) (B 500B), z = 1052 mm
2ø12 (226mm²) (B 500B), z = 803 mm
2ø12 (226mm²) (B 500B), z = 790 mm
2ø12 (226mm²) (B 500B), z = 555 mm
2ø12 (226mm²) (B 500B), z = 515 mm
2ø12 (226mm²) (B 500B), z = 307 mm
2ø12 (226mm²) (B 500B), z = 240 mm
2ø12 (226mm²) (B 500B), z = 58 mm
2ø12 (226mm²) (B 500B), z = -35 mm
2ø12 (226mm²) (B 500B), z = -190 mm
Section 15 (40.16m) 2ø12 (226mm²) (B 500B), z = -310 mm
2ø12 (226mm²) (B 500B), z = -439 mm
2ø12 (226mm²) (B 500B), z = -585 mm
2ø12 (226mm²) (B 500B), z = -687 mm
2ø12 (226mm²) (B 500B), z = -860 mm
2ø12 (226mm²) (B 500B), z = -935 mm
2ø12 (226mm²) (B 500B), z = -1001 mm
2ø12 (226mm²) (B 500B), z = -1098 mm
9ø16 (1810mm²) (B 500B), z = -1208 mm
Stirrups:
ø12 (B 500B) - 300 mm
ø12 (B 500B) - 300 mm
ø12 (B 500B) - 300 mm
ø12 (B 500B) - 300 mm
ø12 (B 500B) - 300 mm
Project: Central Spine Road (CSR4C) - Bridge 11
Project no: 104
Author: Ahmad Nafek Bin August Fouzy
Reinforcement:
6ø12 (679mm²) (B 500B), z = 1355 mm
2ø12 (226mm²) (B 500B), z = 1293 mm
2ø12 (226mm²) (B 500B), z = 1079 mm
2ø12 (226mm²) (B 500B), z = 814 mm
2ø12 (226mm²) (B 500B), z = 548 mm
2ø12 (226mm²) (B 500B), z = 282 mm
2ø12 (226mm²) (B 500B), z = 17 mm
2ø12 (226mm²) (B 500B), z = -249 mm
2ø12 (226mm²) (B 500B), z = -515 mm
Section 19 (53.11m)
2ø12 (226mm²) (B 500B), z = -781 mm
2ø12 (226mm²) (B 500B), z = -1002 mm
2ø12 (226mm²) (B 500B), z = -1065 mm
2ø12 (226mm²) (B 500B), z = -1129 mm
8ø16 (1608mm²) (B 500B), z = -1137 mm
Stirrups:
ø12 (B 500B) - 200 mm
ø12 (B 500B) - 200 mm
ø12 (B 500B) - 200 mm
ø12 (B 500B) - 200 mm
Reinforcement:
6ø12 (679mm²) (B 500B), z = 1373 mm
2ø12 (226mm²) (B 500B), z = 1311 mm
2ø12 (226mm²) (B 500B), z = 1120 mm
2ø12 (226mm²) (B 500B), z = 867 mm
2ø12 (226mm²) (B 500B), z = 614 mm
2ø12 (226mm²) (B 500B), z = 361 mm
2ø12 (226mm²) (B 500B), z = 108 mm
2ø12 (226mm²) (B 500B), z = -145 mm
2ø12 (226mm²) (B 500B), z = -398 mm
Section 20 (55.51m)
2ø12 (226mm²) (B 500B), z = -651 mm
2ø12 (226mm²) (B 500B), z = -878 mm
2ø12 (226mm²) (B 500B), z = -986 mm
2ø12 (226mm²) (B 500B), z = -1093 mm
8ø16 (1608mm²) (B 500B), z = -1119 mm
Stirrups:
ø12 (B 500B) - 175 mm
ø12 (B 500B) - 175 mm
ø12 (B 500B) - 175 mm
ø12 (B 500B) - 175 mm
Project: Central Spine Road (CSR4C) - Bridge 11
Project no: 104
Author: Ahmad Nafek Bin August Fouzy
Reinforcement:
6ø12 (679mm²) (B 500B), z = 1364 mm
2ø12 (226mm²) (B 500B), z = 1306 mm
2ø12 (226mm²) (B 500B), z = 1122 mm
2ø12 (226mm²) (B 500B), z = 1121 mm
2ø12 (226mm²) (B 500B), z = 839 mm
2ø12 (226mm²) (B 500B), z = 838 mm
2ø12 (226mm²) (B 500B), z = 557 mm
2ø12 (226mm²) (B 500B), z = 555 mm
2ø12 (226mm²) (B 500B), z = 274 mm
2ø12 (226mm²) (B 500B), z = 272 mm
2ø12 (226mm²) (B 500B), z = -9 mm
2ø12 (226mm²) (B 500B), z = -11 mm
Section 21 (57.26m) 2ø12 (226mm²) (B 500B), z = -292 mm
2ø12 (226mm²) (B 500B), z = -294 mm
2ø12 (226mm²) (B 500B), z = -574 mm
2ø12 (226mm²) (B 500B), z = -577 mm
2ø12 (226mm²) (B 500B), z = -789 mm
2ø12 (226mm²) (B 500B), z = -860 mm
2ø12 (226mm²) (B 500B), z = -906 mm
2ø12 (226mm²) (B 500B), z = -1023 mm
8ø16 (1608mm²) (B 500B), z = -1120 mm
Stirrups:
ø12 (B 500B) - 100 mm
ø12 (B 500B) - 100 mm
ø16 (B 500B) - 100 mm
ø16 (B 500B) - 100 mm
Reinforcement:
6ø12 (679mm²) (B 500B), z = 1358 mm
2ø12 (226mm²) (B 500B), z = 1300 mm
2ø12 (226mm²) (B 500B), z = 1085 mm
2ø12 (226mm²) (B 500B), z = 1077 mm
2ø12 (226mm²) (B 500B), z = 814 mm
2ø12 (226mm²) (B 500B), z = 802 mm
2ø12 (226mm²) (B 500B), z = 543 mm
2ø12 (226mm²) (B 500B), z = 527 mm
2ø12 (226mm²) (B 500B), z = 273 mm
2ø12 (226mm²) (B 500B), z = 252 mm
2ø12 (226mm²) (B 500B), z = 2 mm
2ø12 (226mm²) (B 500B), z = -23 mm
2ø12 (226mm²) (B 500B), z = -269 mm
2ø12 (226mm²) (B 500B), z = -298 mm
2ø12 (226mm²) (B 500B), z = -540 mm
Section 22 (58.11m) 2ø12 (226mm²) (B 500B), z = -573 mm
2ø12 (226mm²) (B 500B), z = -733 mm
2ø12 (226mm²) (B 500B), z = -848 mm
2ø12 (226mm²) (B 500B), z = -872 mm
2ø12 (226mm²) (B 500B), z = -1010 mm
8ø16 (1608mm²) (B 500B), z = -1126 mm
Stirrups:
ø12 (B 500B) - 100 mm
ø12 (B 500B) - 100 mm
ø12 (B 500B) - 100 mm
ø12 (B 500B) - 100 mm
ø12 (B 500B) - 200 mm
ø12 (B 500B) - 200 mm
ø12 (B 500B) - 200 mm
ø12 (B 500B) - 200 mm
ø12 (B 500B) - 200 mm
ø12 (B 500B) - 200 mm
Job No : 104 Drg No: 1
Prepared by: Nafek Sheet No: 1
Site ref: CSR4C-BR11 Date prepared : 10/5/2022 Revn : 0
LS Girder - Anchorage End Date revised : Status: C
Bursting
Reinforcement
Anti-Crack
Reinforcement
52 B 12 2 3 6 2350 00 2350
…………………………………… ……………………………………
(Ahmad Nafek Bin August Fouzy) (Ir. Low Hin Foo)
Table of Content
Certified by,
…………………………..
(Ir. Low Hin Foo)
Job number 104
Calc. Sheet no
Structure 60m Simply Supported Span - Bridge 11 Calculation by Nafek Date 5/1/2022
Grillage Analysis
Span Length of 60 m
Prepared By,
…..................
(Ahmad Nafek)
Certified by,
…....................
1
(Ir. Low Hin Foo)
Job number 104
Calc. Sheet no
Structure 60m Simply Supported Span - Bridge 11 Calculation by Nafek Date 5/1/2022
1. Introduction
This document contains calculations for the design of bridge consisting of 60m
span crossing over Sg. Lipis, Raub, Pahang as shown in the general arrangement below
.This deck are simply supported at between Pier 2 & Pier 3.
Construction
Drawing Figure 1.1: General arrangement of bridge structure analysed -Elevation view
Prepared By,
…..................
(Ahmad Nafek)
Certified by,
Figure 1.2: Typical Cut Section of Dual Carriageway of 60m Simply Supported Span
`
This report only cover for longitudinal beam design and it is carried out in accordance to
BS5400:Part 4, BD37/01 and Design Brief whichever relevant. Each carriageway is
supported by separate substructure, therefore design for one carriageway is sufficient.
…....................
2
(Ir. Low Hin Foo)
Job number 104
Calc. Sheet no
Structure 60m Simply Supported Span - Bridge 11 Calculation by Nafek Date 5/1/2022
2. Analysis
In general, MIDAS CIVIL software will be use for the analysis and grillage method will be
use in global analysis of carriageway. Below is the general information of the bridge that
will be considered in modelling.
General info:
*Expansion Joint are introduced at Pier 2 & Pier 3, therefore no continuity between the
deck to the next and previous span.
Prepared By,
…..................
(Ahmad Nafek)
Certified by,
…....................
3
(Ir. Low Hin Foo)
Job number 104
Calc. Sheet no
Structure 60m Simply Supported Span - Bridge 11 Calculation by Nafek Date 5/1/2022
To analyse the structure, finite element software MIDAS CIVIL shall be used. A grillage
model is used for the global analysis.
Figure 2.1: Grillage model with simply supported boundary condition in MIDAS
Prepared By,
2.2. Construction Sequence
Modelling in MIDAS is also taking consideration on the construction sequence to show the
relation between concrete age/strength, creep, shrinkage, tendon losses and etc. that
related to time. Below is the construction sequence considered in the model. …..................
(Ahmad Nafek)
(Assumed)
Duration
Sequence Remark
(Days)
Beam stressing 10 Tendon is stressed after beam's age reach 28 days
Beam launching 10 Beam launch on top of Substructure (28 days min.)
Cast deck slab 10 apply wet concrete on top of deck slab Certified by,
Deck slab curing 10 Precast become composite section by activate deck slab
Opening 30 Early stage when bridge is open for service
Long term 10000 Long term under service
The activation of deck slab is performed with aid of composite section for construction
stage. The concrete grade of deck slab is C40 and Long Span Girder (T-Shape) is
C85.
…....................
4
(Ir. Low Hin Foo)
Job number 104
Calc. Sheet no
Structure 60m Simply Supported Span - Bridge 11 Calculation by Nafek Date 5/1/2022
This simply supported bridge is modelled with elastic link with bearing stiffness assigned
at bottomo of beam. The end support are fixed and the reaction will then be used in the
substructure design.
master
node
Rigid Link
with master and
slave node
slave
node
Elastic Link
(bearing stiffness)
Reinforcement:
Prepared By,
High yield steel Type 2 Deformed to BS 4449, 4461 or MS 146:2006:
fy = 500 N/mm2
Mild steel to BS 4449, 4461 or MS 146:2006:
fy = 250 N/mm2
…..................
Young's modulus = 200 kN/mm2 (Ahmad Nafek)
…....................
5
(Ir. Low Hin Foo)
Job number 104
Calc. Sheet no
Structure 60m Simply Supported Span - Bridge 11 Calculation by Nafek Date 5/1/2022
Prestressing
Design shall be based on seven wire stress relieved, low relaxation superstrand to
BS 5896 or ASTM A416-90 with the following properties:
…..................
(Ahmad Nafek)
…....................
6
(Ir. Low Hin Foo)
Job number 104
Calc. Sheet no
Structure 60m Simply Supported Span - Bridge 11 Calculation by Nafek Date 5/1/2022
Compressive Strength:
C70/85:-
Prepared By,
…..................
(Ahmad Nafek)
C32/40:
Certified by,
…....................
7
(Ir. Low Hin Foo)
Job number 104
Calc. Sheet no
Structure 60m Simply Supported Span - Bridge 11 Calculation by Nafek Date 5/1/2022
All the sections were either produced using CAD and then imported into MIDAS software
through the sectional property tool (SPT) or using the composite-PSC section tools in
MIDAS. Their properties were derived by means of this tool and for any further needs in
the analysis stage will be calculated by hand.
Area = 1457655 mm
2
Certified by,
Figure 2.6: Composite section assigned to beam element in MIDAS CIVIL …....................
8
(Ir. Low Hin Foo)
Job number 104
Calc. Sheet no
Structure 60m Simply Supported Span - Bridge 11 Calculation by Nafek Date 5/1/2022
The prestress tendon profiles are input into the analysis based on the duct profile shown
in below figure, MIDAS defines the profiles with respect to the local element orientation.
Losses in the tendons are automatically calculated based on the tendon geometry.
Figure 2.4: Typical cut section of girder showing duct position Prepared By,
…..................
(Ahmad Nafek)
Certified by,
…....................
9
(Ir. Low Hin Foo)
Job number 104
Calc. Sheet no
Structure 60m Simply Supported Span - Bridge 11 Calculation by Nafek Date 5/1/2022
3. Loading
The dead load of precast beam is being derived by means of the MIDAS software and
modelling package, by accounting for the cross-sectional properties input.
Standard road parapets are provided at both edges of the viaduct and also the road
median. the loading applied is as follow: Prepared By,
…..................
3.2.2. Surfacing (Ahmad Nafek)
Similarly, the material densities for superimposed loading were extrapolated from the
design brief.
…....................
10
(Ir. Low Hin Foo)
Job number 104
Calc. Sheet no
Structure 60m Simply Supported Span - Bridge 11 Calculation by Nafek Date 5/1/2022
As the bridge is simply supported system, differential settlement will not have any load
effect to the bridge.
BD37/01
5.3.2.3 Gust Factor, Sg = SbTgSh' Prepared By,
where, Sb = Sb'KF
Sb' is the bridge and terrain factor = 1.52
KF is the fetch correction factor = 0.85
Tg is the town reduction factor = 1.00 …..................
Sh' is the topography factor = 1.0 (Ahmad Nafek)
Therefore, Sg = 1.29
BD37/01
5.3.2.1 Maximum Wind gust Speed Vd on bridges without live load
…....................
11
(Ir. Low Hin Foo)
Job number 104
Calc. Sheet no
Structure 60m Simply Supported Span - Bridge 11 Calculation by Nafek Date 5/1/2022
Carriageway depth,
beam depth = 2.6 m
deck slab = 0.2 m
Parapet = 0.9 m
BD37/01
Figure 4 (d) d = d2 = 3.7 m
b/d = 6.59
BD37/01
Figure 5 hence, CD = 1.25
CD = 1.344
…....................
12
(Ir. Low Hin Foo)
Job number 104
Calc. Sheet no
Structure 60m Simply Supported Span - Bridge 11 Calculation by Nafek Date 5/1/2022
Carriageway depth,
beam depth = 2.6 m
deck slab = 0.2 m
Parapet = 0.9 m
Height of live load, DL = 2.5 m above deck slab
BD37/01
Figure 4 (d) d = d2 = 5.3 m
b/d = 4.60
BD37/01
Figure 5 hence, CD = 1.38 x 1.075 (assumed 2.5% superelevatino)
= 1.48
The combinations of the longitudinal, vertical and transverse wind loads (calculated
before) shall be considered in the following combinations in accordance with
BD37/01 Clause 5.3.6 of BD 37/01.
5.3.6
(a) - PT alone
(b) - PT in combination with +/- Pv
(c) - PL alone
(d) - 0.5PT in combination with PL +/-0.5Pv Prepared By,
The global temperature effects are considered in accordance with the design criteria
given below:
…....................
13
(Ir. Low Hin Foo)
Job number 104
Calc. Sheet no
Structure 60m Simply Supported Span - Bridge 11 Calculation by Nafek Date 5/1/2022
Differential Temperatures
Since, the structure comprises of composite beam and concrete slab deck, it is specified
by the design criteria that the thermal gradient shall be in accordance with BD37/01,
clause 5.4.3, Figure 9 and Group Type 4 for rise and fall of temperature.
Surfacing thickness = 50 mm
T1 = 17.8 °C T1 = -10.6 °C
T2 = 4 °C T2 = -0.7 °C
T3 = 2.1 °C T3 = -0.8 °C
T4 = -6.6 °C
Prepared By,
…..................
(Ahmad Nafek)
Certified by,
…....................
14
(Ir. Low Hin Foo)
Job number 104
Calc. Sheet no
Structure 60m Simply Supported Span - Bridge 11 Calculation by Nafek Date 5/1/2022
The structure is to be subjected to Highway live loading (HA and HB) on both
carriageways in accordance with BD37/01. Live moving load analysis of the roadway will
be carried out using MIDAS on the moving load analysis.
Deck width = 12 m
BD37/01 Parapet width = 0.5 m
3.2.9 Clear spacing for lane = 11 m
Number of notional lane = 4 Lanes
Notional lane width = 2.75 m
Prepared By,
…..................
(Ahmad Nafek)
6.2 HA Loading
HA loading is a formula loading representing normal traffic in Great Britain. The live
loading for each loaded length and notional lane shall consist of a HA UDL and a knife
edge load (KEL). Or of a single wheel load. Appropriate lane factors are applied through
MIDAS moving load patch.
Certified by,
6.2.2 KEL Loading
…....................
15
(Ir. Low Hin Foo)
Job number 104
Calc. Sheet no
Structure 60m Simply Supported Span - Bridge 11 Calculation by Nafek Date 5/1/2022
Loaded Length
BD37/01 Loaded lengths are to be automatically determined using the moving load analysis
Table 14 function available in MIDAS Civil 2020. UDL values are automatically generated according
to the length of lane input into the model.
HB Loading
Prepared By,
HB loading is an abnormal vehicle unit loading. One unit is taken as equal to 10kN per
axle.
…..................
(Ahmad Nafek)
Certified by,
…....................
16
(Ir. Low Hin Foo)
Job number 104
Calc. Sheet no
Structure 60m Simply Supported Span - Bridge 11 Calculation by Nafek Date 5/1/2022
Prestressed members should be designed under Load Combination 1 with HA and HA+30
units HB for Class 1 and for Class 2 with HA and HA+45 units HB.
For SLS checks the most severe of the following will be used:
i) HA loads in all lanes
ii) 30 units of HB in any one lane in combination with HA in other lanes.
For ULS checks the most severe of the following will be used:
i) HA loads in all lanes.
ii) 45 units of HB in any one lane in combination with HA in other lanes.
1.Nominal load for HA 8kN/m of loaded length plus 250kN, subject to a maximum of 750
kN.
Prepared By,
2.Nomimal load for HB is 25% of the total nomimal HB load adopted.
HB = 450.00 kN
Longitudinal load is applied at the road surface and parallel to it in one notional lane only. …..................
(Ahmad Nafek)
BD37/01 3.8. Skidding
6.11
On straight and curved bridges a single point load is considered in one notional lane only,
acting in any direction on and parallel to, the surface of the highway.
…....................
17
(Ir. Low Hin Foo)
Job number 104
Calc. Sheet no
Structure 60m Simply Supported Span - Bridge 11 Calculation by Nafek Date 5/1/2022
The structure will be analysed at Ultimate Limit State (ULS conditions) under
combinations 1 to 4 inclusive. The values of γFL adopted in each combination are being
extracted and tabulated below.
…....................
18
(Ir. Low Hin Foo)
Job number 104
Calc. Sheet no
Structure 60m Simply Supported Span - Bridge 11 Calculation by Nafek Date 5/1/2022
4. Result
Bending moment and shear force for each load are shown below.
Figure 4.1: Max. Bending for Dead Load (Girder + Deck Slab)
Prepared By,
…..................
(Ahmad Nafek)
Certified by,
Figure 4.2: Max. Shear for Dead Load (Girder + Deck Slab)
…....................
19
(Ir. Low Hin Foo)
Job number 104
Calc. Sheet no
Structure 60m Simply Supported Span - Bridge 11 Calculation by Nafek Date 5/1/2022
Prepared By,
…..................
(Ahmad Nafek)
Certified by,
…....................
20
(Ir. Low Hin Foo)
Job number 104
Calc. Sheet no
Structure 60m Simply Supported Span - Bridge 11 Calculation by Nafek Date 5/1/2022
Prepared By,
…..................
(Ahmad Nafek)
Certified by,
…....................
21
(Ir. Low Hin Foo)
Job number 104
Calc. Sheet no
Structure 60m Simply Supported Span - Bridge 11 Calculation by Nafek Date 5/1/2022
Figure 4.7: Max. Bending for Wind Load (Without Live Load)
Prepared By,
…..................
(Ahmad Nafek)
Certified by,
Figure 4.8: Max. Shear for Wind Load (Without Live Load)
…....................
22
(Ir. Low Hin Foo)
Job number 104
Calc. Sheet no
Structure 60m Simply Supported Span - Bridge 11 Calculation by Nafek Date 5/1/2022
Figure 4.9: Max. Bending for Wind Load (With Live Load)
Prepared By,
…..................
(Ahmad Nafek)
Certified by,
Figure 4.10: Max. Shear for Wind Load (With Live Load)
…....................
23
(Ir. Low Hin Foo)
Job number 104
Calc. Sheet no
Structure 60m Simply Supported Span - Bridge 11 Calculation by Nafek Date 5/1/2022
Figure 4.11: Top Stress for Global Temperature (Envelope +ve and -ve)
Prepared By,
…..................
(Ahmad Nafek)
Certified by,
Figure 4.12: Bottom Stress for Global Temperature (Envelope +ve and -ve)
…....................
24
(Ir. Low Hin Foo)
Job number 104
Calc. Sheet no
Structure 60m Simply Supported Span - Bridge 11 Calculation by Nafek Date 5/1/2022
Figure 4.13: Top Stress for Differential Temperature (Envelope +ve and -ve)
Prepared By,
…..................
(Ahmad Nafek)
Certified by,
Figure 4.14: Bottom Stress for Differential Temperature (Envelope +ve and -ve)
…....................
25
(Ir. Low Hin Foo)
Job number 104
Calc. Sheet no
Structure 60m Simply Supported Span - Bridge 11 Calculation by Nafek Date 5/1/2022
Prepared By,
…..................
(Ahmad Nafek)
Certified by,
…....................
26
(Ir. Low Hin Foo)
Job number 104
Calc. Sheet no
Structure 60m Simply Supported Span - Bridge 11 Calculation by Nafek Date 5/1/2022
Figure 4.17: Max. Bending for Live Load (HA and/or 30HB)
Prepared By,
…..................
(Ahmad Nafek)
Certified by,
Figure 4.18: Max. Shear for Live Load (HA and/or 30HB)
…....................
27
(Ir. Low Hin Foo)
Job number 104
Calc. Sheet no
Structure 60m Simply Supported Span - Bridge 11 Calculation by Nafek Date 5/1/2022
Figure 4.19: Max. Bending for Live Load (HA and/or 45HB)
Prepared By,
…..................
(Ahmad Nafek)
Certified by,
Figure 4.20: Max. Shear for Live Load (HA and/or 45HB)
…....................
28
(Ir. Low Hin Foo)
Job number 104
Calc. Sheet no
Structure 60m Simply Supported Span - Bridge 11 Calculation by Nafek Date 5/1/2022
Figure 4.21: Max. Bending for Serviceability Limit State (SLS Env)
Prepared By,
…..................
(Ahmad Nafek)
Certified by,
Figure 4.22: Max. Shear for Serviceability Limit State (SLS Env)
…....................
29
(Ir. Low Hin Foo)
Job number 104
Calc. Sheet no
Structure 60m Simply Supported Span - Bridge 11 Calculation by Nafek Date 5/1/2022
Figure 4.23: Max. Bending for Ultimate Limit State (ULS Env)
S
Prepared By,
…..................
(Ahmad Nafek)
Certified by,
Figure 4.24: Max. Shear for Ultimate Limit State (ULS Env)
…....................
30
(Ir. Low Hin Foo)
Job number 104
Calc. Sheet no
Structure 60m Simply Supported Span - Bridge 11 Calculation by Nafek Date 5/1/2022
5. Beam Design
The stress check were carried out for the edge beam and intermidiate beam as following
to ensure that the beam is within the allowable stress limit. The position of the stress
check are shown in figure below:-
Position 1&2 for top stress and position 3&4 for bottom stress are checked to be in
allowable tension and compression as below:.
2
Concrete grade for LS Girder, fcy/fcu = 70 / 85 N/mm …..................
Concrete grade during transfer, fci = 85 N/mm2 (Ahmad Nafek)
2
Load Combination 2/3: Compressive = -34 N/mm (class 2 member)
Tensile = 3.3 N/mm2
…....................
31
(Ir. Low Hin Foo)
Job number 104
Calc. Sheet no
Structure 60m Simply Supported Span - Bridge 11 Calculation by Nafek Date 5/1/2022
Prepared By,
…..................
(Ahmad Nafek)
Certified by,
Stress at midspan
Stress in top fibre = -9.60 N/mm2
Stress in bottom fibre = -33.29 N/mm2
Calc. Sheet no
Structure 60m Simply Supported Span - Bridge 11 Calculation by Nafek Date 5/1/2022
Service - Class 1
Prepared By,
…..................
(Ahmad Nafek)
Certified by,
Stress at midspan
Stress in top fibre = -19.28 N/mm2
Stress in bottom fibre = -2.78 N/mm2
Stress are within allowable stress for Class 1. …....................
33
(Ir. Low Hin Foo)
Job number 104
Calc. Sheet no
Structure 60m Simply Supported Span - Bridge 11 Calculation by Nafek Date 5/1/2022
Service - Class 2
Prepared By,
…..................
(Ahmad Nafek)
Certified by,
Stress at midspan
Stress in top fibre = -17.69 N/mm2
Stress in bottom fibre = -2.78 N/mm2
Stress are within allowable stress for Class 2. …....................
34
(Ir. Low Hin Foo)
Job number 104
Calc. Sheet no
Structure 60m Simply Supported Span - Bridge 11 Calculation by Nafek Date 5/1/2022
Figure 5.8: ULS - Bending moment diagram for Edge beam (Envelope ULS LC1 - LC4)
Since we already assigned the material and section with the time-dependent properties, Prepared By,
tendon forces after all losses in each tendon are computed MIDAS. Result are as in the
table below:
Elastic Tendon
Force (After Creep/Shri …..................
Tendon Deform. Relaxation Force after % of Total
ID Immediate nkage
Name Loss : B Loss (kN) all losses Losses (Ahmad Nafek)
Loss) : A (kN) Loss (kN)
(kN) (kN)
Autodesk Structural Bridge Design software are used to get the bending capacity for the
girder section, result are as below:
Since ratio capacity is less than 1.15, Additional strain check required based on BS5400:4
(6.3.3.1) …....................
35
(Ir. Low Hin Foo)
Job number 104
Calc. Sheet no
Structure 60m Simply Supported Span - Bridge 11 Calculation by Nafek Date 5/1/2022
By means of ratio from the stress-strain diagram, strain in the outermost tendon can be
defined as below:
(d − x)
ε = 0.0035
x
where,
d = effective depth to the outermost tendon = 2675 mm
x = compression depth = 1458.7 mm
f
Ɛ = -0.002919 > −0.005 −
E γ
(in tension)
= -0.005 - 1860
195000 x 1.15
= -0.01329 (in tension)
Prepared By,
…..................
(Ahmad Nafek)
…....................
36
(Ir. Low Hin Foo)
5.3 Autodesk Structural
Bridge Design Output
37
Job: Central Spine Road - CSR4C (Bridge 11) Job No.: 104
Section: 2.6m LS Girder (Edge Beam) Calc. By: Nafek
Sagging Capacity Checked:
Data File: D:\User\Documents\Personal\Professional Engineer - Naf...\2.6m LS Girder Sagging (Edge Beam).sam 2/1/2022 9:02:07 PM
Data Report
—————————————————————————————————————————————————————————————————————————————————————
——————————
MATERIALS
Data Report
—————————————————————————————————————————————————————————————————————————————————————
——————————
DESIGN SECTION
--------------------------------------------------------------------------------
ELEMENTS
———————————————————————————————————————————————————————————————————————————
Name Library Material Property
———————————————————————————————————————————————————————————————————————————
SE1: LS Girder User Library MP1: C85 Es 36.0 fcc 0.5
SE2: Deck Slab User Library MP2: C40 Es 31.0 fcc 0.5
Data Report
———————————————————————————————————————————————————————————————————————
Node X-Y coords mm Node X-Y coords mm Node X-Y coords mm
———————————————————————————————————————————————————————————————————————
1 -1300.0 2800.0 3 1500.0 2600.0 4 1500.0 2800.0
2 -1300.0 2600.0
--------------------------------------------------------------------------------
TENDONS
———————————————————————————————————————————————————————————————————————————
Ref X-Y coords Area Initial Material Property
mm mm² Force kN
———————————————————————————————————————————————————————————————————————————
1 -180 125 3300 3711.26 MP3: Grade 1860 E 195.0
2 180 125 3300 3710.83 MP3: Grade 1860 E 195.0
3 0 125 3300 3691.23 MP3: Grade 1860 E 195.0
4 0 325 2850 3351.39 MP3: Grade 1860 E 195.0
5 0 525 2850 3337.85 MP3: Grade 1860 E 195.0
6 0 725 2850 3325.08 MP3: Grade 1860 E 195.0
--------------------------------------------------------------------------------
LOAD DATA
—————————————————————————————————————————————————————————————————————————————————————
——————————
End
Tendons are not fully yielded, therefore check that the section is adequate for
1.15 times the ultimate loads.
(This check is not required for columns or for assessments to CS 455)
MAXIMUM Strains:
——————————————————————————————————————————————————————————————————————
Material Property Strain Stress location
N/mm² x y
——————————————————————————————————————————————————————————————————————
C85 Es 36.0 fcc 0.5 0.0030201 37.966667 700.0 2600.0
C40 Es 31.0 fcc 0.5 0.0035 17.866667 -1300.0 2800.0
Grade 1860 E 195.0 -0.007462 -1334.064 0.0 725.0
Grade 500 E 195.0 fst 0.75 (not used)
MINIMUM Strains:
——————————————————————————————————————————————————————————————————————
Material Property Strain Stress location
N/mm² x y
——————————————————————————————————————————————————————————————————————
C85 Es 36.0 fcc 0.5 -0.003219 0.0 -600.0 0.0
C40 Es 31.0 fcc 0.5 0.0030201 17.866667 -1300.0 2600.0
Grade 1860 E 195.0 -0.008686 -1393.521 -180.0 125.0
Grade 500 E 195.0 fst 0.75 (not used)
Note: Moments arising from eccentricity of axial loads are relative to the
centroidal axis of
the section.
The transformed section centroid is used.
End
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
Job number 104
Calc. Sheet no
Section Properties
1400
400 600 400
0 0
①
120
37
Yt
② ⑦ ③ 0
Neutral Axis Y
H = 2600 ④ 1,789
300 300
⑤ ⑤ Yb
114
540
⑥ Z
1200
- Sectional second moment (I) about the central axis: I ZZ = ΣI co + ΣAㆍZ 2 = 1.49E+11 mm 4
Calc. Sheet no
1400
535 230 535
50 50
①
120
50
Yt
② ⑦ ③ 50
Neutral Axis Y
H = 2600 ④ 2,030
485 485
⑤ ⑤ Yb
150
200
⑥ Z
1200
- Sectional second moment (I) about the central axis: I ZZ = ΣI co + ΣAㆍZ 2 = 6.88E+10 mm 4
…....................
69
(Ir. Low Hin Foo)
Job number 104
Calc. Sheet no
H = 200 200
⑧ 1400
535 230 535
50 50
①
120
50
Yt
② ⑦ ③ 50
Neutral Axis Y
H = 2600 ④ 2,030
485 485
⑤ ⑤ Yb
150
200
⑥ Z
1200
▶ IYY [unit of length: mm ]
Cross-Sectional Area( Y
section A ·Y A ·Y 2 Moment of Inertia (I co )
⑧ 482,222 100.00 48,222,222 4,822,222,222 1,607,407,407
① 168,000 260.00 43,680,000 11,356,800,000 201,600,000
② 26,750 336.67 9,005,833 3,031,963,889 3,715,278
③ 2,500 386.67 966,667 373,777,778 347,222
④ 524,400 1,460.00 765,624,000 1,117,811,040,000 227,170,080,000
⑤ 72,750 2,550.00 185,512,500 473,056,875,000 90,937,500
⑥ 240,000 2,700.00 648,000,000 1,749,600,000,000 800,000,000 Prepared By,
⑦ 5,000 345.00 1,725,000 595,125,000 1,041,667
Sum 1.52E+06 1,702,736,222 3,360,647,803,889 229,875,129,074
- Sectional second moment (I) about the central axis: I ZZ = ΣI co + ΣAㆍZ 2 = 4.35E+11 mm 4
71
72
73
74
75
7.0 Bill of Quantities
76
CENTRAL SPINE ROAD
PAKEJ 4 : KG. RELONG KE RAUB, PAHANG
~SEKSYEN 4C : SEGA LAMA KE KUALA DONG
BILL NO. 8.4 : BRIDGE NO. 11 CSR OVER SG. LIPIS AT CH 30660 (ALL PROVISIONAL)
8.1D1 SUPERSTRUCTURE
8.1D1.1.1 Provide temporary access, staging, storage and sum By Main Contractor
working platform for LS girder jointing and launching.
Rate to inlcudes generator set, water and
electricity.
Carried to Collection
77
Job number 104
Calc. Sheet no
1) Concrete Quantites
3
Average rebar poundage per m girder = 110 kg/m
3
3) Wire Strand
Roughly, 3000 kg of strand pre coil, therefore total coil required = 22 Coils Prepared By,
4) Tendon Ducting