1. Product supplier (PPG) information
1a) Supplier Catalogue
1b) Supplier declare letter2. Product Data Sheet
2. Product Data Sheet
2a) Top Coat – Sigmadur -520
2b) Fire Protection – Nullifire SC801
2c) Primer - SigmaCover-522
2d) Zinc Rich Primer – Sigmazinc -109-hs-voc
3. Clarification of Painting system corrosion protection
4. Method Statement
4a) Application and repair method of painting system with corrosion protection
4b) Application and repair method of painting system with corrosion and fire
protection
5. Clarification letter of compliance to VOC content
5a) From Sigma Coating supplier – PPG
5b) From Nullifire SC801 supplier – TREMCO
6. Confirmation of Compatibility
6a) Compatibility letter from TREMCO
6b) Compatibility letter from PPG
7. NULLIFIRE SC 801 DFT Check
8. ISO 9001:2015 Certificate
8a) Tremco Illbruck Limited
8b) PPG Coatings (KunShan) Co., Ltd.
9. Job References
10. Reply of clarification painting system issued by Atkins
Hong Kong International Airport Authority
Paul Y. Construction Company, Limited
Contract C19W05 - Multipurpose Building
In Remaining Midfield Area
Submission Summary
System Detail Brand Name Application area with reference to
Link Bridge Curtain Wall
DDR Dwgs
Dwgs Dwgs
Painting System Top Coat Sigmadur 520 MB1, SB1, MB1, SB1, MB1, SB1,
With Corrosion and Fire Coat Nullfire SC801 SC1~SC3, BR1 SC1~SC3, BR1 SC1~SC3, BR1
Fire protection Primer Sigmacover 522
Painting System Top Coat Sigmadur 520 N2, SB2~SB5, SB2 N1, SB2,
With Corrosion Primer Sigmacover 522 SC4~SC5 SC4~SC5 SC4~SC7
protection P1~16 PL1~3 G1-G2
Repair to Top Coat Sigmadur 520
damaged area Primer Sigmacover 522 All members All members All members
Zinc Rich SigmaZinc 109
of paint
Primer HS VOC
Protecting beauty
in a harsh world
Marine
Proven, durable protection for extreme Robust and resilient solutions that withstand
offshore environments long-term impact and abrasion challenges
Petrochemical Power
5
Our protective coating
product offerings
PPG STEELGUARD™
Durable epoxy solutions Cellulosic PFP
A complete range of cellulosic passive fire protection
PPG SIGMACOVER™ coatings for the protection of structural steel in civil
A range of durable epoxy coatings for both new buildings.
construction and maintenance in both atmospheric and
immersed conditions. The products provide a range PPG PITT-CHAR® XP
of outstanding features such as corrosion protection, Hydrocarbon PFP
surface tolerance, ease of application, recoatability, and The ultimate flexible epoxy intumescent coating solution
suitability for a wide range of ambient conditions. for extreme hydrocarbon fire scenarios, (including jet fire)
with extensive third-party certification.
7
Our marine coating
product offerings
PPG PHENGUARD
Solvent-borne epoxy phenolic range offers maximum
resistance to the widest range of aggressive chemical
cargos, such as Methanol, EDC and Fatty Acids.
9
All our performance-enhancing coating solutions are built on an in-depth knowledge of the industry, our customers’ day-to-
day challenges, and the environmental, health and safety standards in the marketplace. By working in close partnership with
our customers, we understand the constantly changing demands that they face. So we make it our goal to provide innovative,
value-added coatings matching the requirements of the markets we serve, not just for today but also for tomorrow.
Our aim is to provide the most effective products and processes for each application, supported by knowledgeable
technical technical service and advice, with experts based locally in over 60 countries including around 600 Field
Technical Service representatives (FTS) globally.
All FTS representatives are certified by the following leading organizations with extensive experience gained in all
environments and conditions worldwide: FROSIO, NACE, KACE, Corrodere, ACQPA.
28 87
Primary Production Locations PPG Managed Stock Points
8 7
14
3
4, 5
15 11
16
13
9
12
10
15
Visit ppgpmc.com or contact:
Asia Pacific +86-21-6025-2688 ppgpmc.ap@ppg.com
Europe, Middle East and Africa +32-3-3606-311 customers@ppg.com
Latin America +57-1-8764242 ext. 201 ppgpmcandean-ca@ppg.com
North America (US & Canada) +1-888-9PPGPMC PMCMarketing@ppg.com
No rights can be derived from the content of this publication. Unless otherwise agreed upon in writing, all products and technical advice are subject to our terms of sale, available on our
website ppgpmc.com. All rights reserved. The PPG logo, We protect and beautify the world, and all other PPG marks are property of the PPG group of companies. All other third-party marks
are property of their respective owners. PM16126. July 2018. © 2018 PPG Industries, all rights reserved.
PPG Performance Coatings (HK) Ltd.
Suites 1010 – 1015, Cityplaza One
1111 King’s Road, Taikoo Shing
Hong Kong
T : +852 2860 4575
F : +852 2544 6109
M : +852 9430 7402
E : eric.chan@ppg.com
www: ppgpmc.com
Should you require further information, please do not hesitate to contact us.
Sincerely,
Eric Chan
Footer with legal information
Volesectem nim num vullumsan utpate tisl delestis aut venis dunt utpat velit prat. Duip ex exeriuscil el iuscipsum alis nim volobortio in
hent autpatue ming eugue magna feum dolobortis nullutat praestrud diatuerat. Digna faccum do od tat in et, si tem ing elit nim
Hong Kong International Airport Authority
Paul Y. Construction Company, Limited
Contract C19W05 - Multipurpose Building
In Remaining Midfield Area
Re: Method Statement for HK Airport Authority Project - Contract No. C19W05
Multipurpose Building in Remaining Midfield Area.
Stephen,
In response to your kind enquiry of PPG – Sigma paint products for the captioned project, we would like to submit
the proposed painting system for your kind consideration and evaluation.
Proposed Painting System for GMS:
• 1 layer of full coat SigmaCover 522 (Sealer /Primer – Epoxy Resin) @ 80 micron dft
• 2 layers of full coat SigmaDur 520 (PU Top coat - Polyurethane) @ 100 micron dft Total
180 microns dft
In accordance with ISO12944 or BS 5493, the captioned painting system is industrial areas and coastal areas with
moderate salinity atmospheres, corrosivity category of C4 high which is comply with Painting System No.5.11,
table A7.11 in ISO 12944:2007 and “ High “ durability of mininium 10 years is expected.
Should you require further information, please do not hesitate to contact us.
Sincerely,
Eric Chan
Footer with legal information
Volesectem nim num vullumsan utpate tisl delestis aut venis dunt utpat velit prat. Duip ex exeriuscil el iuscipsum alis nim volobortio in
hent autpatue ming eugue magna feum dolobortis nullutat praestrud diatuerat. Digna faccum do od tat in et, si tem ing elit nim
ISO 12944-5:2007{E)
Table A.7 - Paint systems for hot-dip-galvanized steel for corrosivity categories
C2 to C5-I and C5-M
A7,01 PVC
A7.02 PVC 40 PVC
i\7.03 PVC 80 PVC
A7.04 PVC 80 PVC
1;7.05 AY
A7.06 AY 40 AY
\
A7.07 AY 80 AY
A7.08 AY 80 AY
4. Method Statement
4a) Application and repair method of painting system with
corrosion protection
4b) Application and repair method of painting system with
corrosion and fire protection
PPG Performance Coatings (HK) Ltd.
Suites 1010 – 1015, Cityplaza One
1111 King’s Road, Taikoo Shing
Hong Kong
T : +852 2860 4575
F : +852 2544 6109
M : +852 9430 7402
E : eric.chan@ppg.com
www: ppgpmc.com
Re: Method Statement for HK Airport Authority Project - Contract No. C19W05
Multipurpose Building in Remaining Midfield Area.
Stephen,
In response to your kind enquiry of PPG – Sigma paint products for the captioned project, we would like to submit
the proposed painting system for your kind consideration and evaluation.
Proposed Painting System for GMS:
• 1 layer of full coat SigmaCover 522 (Sealer /Primer – Epoxy Resin) @ 80 micron dft
• 2 layers of full coat SigmaDur 520 (PU Top coat - Polyurethane) @ 100 micron dft Total
180 microns dft
In accordance with ISO12944 or BS 5493, the captioned painting system is industrial areas and coastal areas with
moderate salinity atmospheres, corrosivity category of C4 high which is comply with Painting System No.5.11,
table A7.11 in ISO 12944:2007 and “ High “ durability of mininium 10 years is expected.
Should you require further information, please do not hesitate to contact us.
Sincerely,
Eric Chan
Footer with legal information
Volesectem nim num vullumsan utpate tisl delestis aut venis dunt utpat velit prat. Duip ex exeriuscil el iuscipsum alis nim volobortio in
hent autpatue ming eugue magna feum dolobortis nullutat praestrud diatuerat. Digna faccum do od tat in et, si tem ing elit nim
Proposed Painting System for GMS:
• 1 layer of full coat SigmaCover 522 (Sealer /Primer – Epoxy Resin) @ 80 micron dft
• 2 layers of full coat SigmaDur 520 (PU Top coat - Polyurethane) @ 50 micron dft per coat
Total 180 microns dft
Method Statement:
1. Degrease and clean to SSPC-SP 1 solvent cleaning and remove all the foreign matter before application;
**SSPC-SP 1 = Complete removal of oil, grease, wax and other contaminants by cleaning with solvents, vapors, emulsions, alkalies
or stream.
2. Checking on the prepared surface to ensure where is free from contamination pror to application;
3. On the areas where surface cleaning is accept, apply 1st coat of epoxy resin primer ( SigmaCover 522 ) @ 40 micron
dry film thickness ( DFT ) by airless spray, brushing or rolling and allow to dry.
4. After 8 hours (min.) drying at 20 °C, check and ensure the dry film thickness ( DFT ) of epoxy resin primer
( SigmaCover 522) achieved to the specified thickness;
5. On the accept areas, apply 1st coat of acrylic polyurethane finish coat ( SigmaDur 520 ) @ 50 micron dry film
thickness ( DFT ) by airless spray, brushing or rolling and allow to dry.
6. After 6 hours (min.) drying at 20 °C, check and ensure the dry film thickness ( DFT ) of acrylic polyurethane finish
( SigmaDur 520 ) achieved to the specified thickness;
7. On the accept areas, apply 2nd coat of acrylic polyurethane finish coat ( SigmaDur 520 ) @ 50 micron dry film
thickness ( DFT ) by airless spray, brushing or rolling and allow to dry.
8. After 6 hours (min.) drying at 20 °C, check and ensure the dry film thickness ( DFT ) of acrylic polyurethane finish
( SigmaDur 520 ) achieved to the specified thickness;
9. Touching up the coating if necessary.
Notes:
1. Slightly sanding the surface with sand paper and clean up the surface before application;
2. Touch up the areas with subsequent coating as per painting system approved;
3. All technical information, i.e. mixing ratio and overcoating interval should refer to our product data sheet.
Repair to damaged area of paint
1 layer of full coat SigmaZinc 109HSVOC (Zinc Rich Primer - Epoxy Resin) @ 85 micron dft
• 1 layer of full coat SigmaCover 522 (Sealer /Primer – Epoxy Resin) @ 80 micron dft
• 2 layers of full coat SigmaDur 520 (PU Top coat - Polyurethane) @ 50 micron dft per coat
(Option A) Touch-up Painting System for Repairing of damaged down to bare galvanized metal & weld joints
Surface Preparation:
Power tool clean to St 3 as per ISO 8501-1:1988
Degrease where necessary, remove weld spatter by grinding, round off any sharp edges.
Surface to be coated should be free of water, dust and other contamination.
Touch-up Painting System:
• 1 layer of full coat SigmaZinc 109HSVOC (Zinc Rich Primer - Epoxy Resin) @ 85 micron dft
• 1 layer of full coat SigmaCover 522 (Sealer /Primer – Epoxy Resin) @ 80 micron dft
• 2 layers of full coat SigmaDur 520 (PU Top coat - Polyurethane) @ 50 micron dft per coat
Notes:
1. Slightly sanding the surface with sand paper and clean up the surface before touching up;
2. Touch up the areas with subsequent coating as per painting system approved;
3. All technical information, i.e. mixing ratio and overcoating interval should refer to our product data sheet.
Project: Multipurpose Bldg at Midfield C19W05 –
Link Bridge
Client: Paul Y.
Work
Rev A
Date: 28-02-2021
Content of Method Statement
0.0 Preparation
6.0 Safety
8.0 Preparation
14.0 Safety
2
Part A
0.0 Preparation
Due to the structural steel material is hot-dip galvanized. Prior to precede the
subsequent procedures of paint system on Galvanized steel surface on site,
the contractor should ensure the steel surface should be thoroughly clean.
Any zinc residue or paint residue left on the steel surface should be removed.
1.1 Each coat in the paintwork system shall be sufficiently dry or cured
before the next coat is applied. The time between the application of
successive coats shall be accordance with paint manufacturer’s
recommendations.
Member
Material Member Size Sides HP/A DFT (mm)
Mark
(m-1)
MB1 UC 305 x 305 x 198 3 62 1.743
SB1 UC 152 x 152 x 30 3 195 2.613
SC1 SHS 250 x 250 x 16 4 65 2.600
SC2 SHS 250 x 250 x 6.3 4 161 7.055
3 161 2.364
SC3 UC 152 x 152 x 37
4 194 3.517
BR1 UC 152 x 152 x 23 3 252 3.428
3
Application method stripe coat Normal coating
Product name
Sigmacover 522 Primer brush roller/ airless spray
Nullifire SC801-120 brush roller/ airless spray
Sigmadur 520 brush roller/ airless spray
2.1 When ambient temperature falls below 4oC or the relative humidity
rises above 85%
2.2 When the surface temperature of the metal to be painted is less than
3oC above the dew point of the ambient air, and
2.3 When the amount of dust in the air or on the surface to be painted is
excessive.
2.4 The surrounding area and facilities should be protected (e.g. picture 1)
Picture 1
3.1 The dry film thickness of the paint coats to the steelwork shall be
measured using a magnetic dry film thickness gauge and/or by
4
electronic dry film thickness gauges like elcometer 345 or equivalent.
The total dry film thickness shall be measured at spacing of
approximately 3 meter. If the measured dry film thickness is less than
75% of the specified nominal dry film thickness or if more than 10% of
the measured dry film thickness are less than 95% of the specified
nominal dry film thickness, repair work shall be carried out in
accordance with approved procedure.
3.3 Each coat of paint shall be free from embedded foreign matter,
mechanical damage and surface defects, including bitterness,
blistering, brush marks, bubbling, cissing, cracking, cratering, dry spray,
floating, pinholing, rivelling, runs, sagging, spotting and spray mottle.
The finished paintwork system shall have an even and uniform
appearance.
5
5.2 Anticorrosive Primer
5.2.1 Sigmacover 522 Primer Micaceous Iron Oxide.
5.2.2 Dry film thickness approx 80 micron average.
5.2.3 The application shall be carried out by airless spray, brush and
/or roller.
5.3.5 Application
SC801-120 shall be applied in several coats up to the required
dry film thickness.
5.3.8 General
During application and curing of SC801-120 & Sigmadur 520
Top Coat, care must taken against weathering / rain etc.
6
6.0 Safety
The space / area where paint application takes place should be of good
ventilation, away from any naked fire and any machines that would create
high heat and sparks.
Workers who apply paint shall be equipped with safety helmets, goggles,
gloves, masks, safety belts and breathing apparatus if necessary.
7.1 Severe damages 一 the fire resistance coating is damaged up to the primer level,
i.e. the primer coating is visible
Actions:
manufacturer
7.2 Moderate damages - Part of the fire resistance coating is damaged and not up to
the primer level, i.e. the intumescent paint dry film thickness is partly affected
Actions:
i. Remove the paint film in the damaged portion with power
7
grinder or sand paper # 120 一 150 until the surface is flat
and smooth,no need to remove paint film up to primer level
ii. Make sure that all dust. residues and other contaminants
are removed from the surface of the cut area by clean
brush before further application
iv. Apply the topcoat (Sigmadur 520) to the required dry film
manufacturer
7.3 Minor damages – Parts of the top coat coating is damaged and not up to
intumescent paint level
i. Remove the paint film in the damaged portion with power grinder or
sand paper # 120-150 until the surface is flat and smooth
ii. Apply the Topcoat (Sigmadur 520) to the required dry film
thickness.
8
Part B
8.0 Preparation
13.2.4 The application shall be carried out by airless spray, brush and
/or roller.
13.2.7 General
During application and curing of Sigmadur 520 & Top Coat,
10
care must take against weathering / rain etc.
14.0 Safety
15.1 Severe damages 一 The coating is damaged d o w n to the bare galvanized metal
15.1.1
manufacturer
12
Hong Kong International Airport Authority
Paul Y. Construction Company, Limited
Contract C19W05 - Multipurpose Building
In Remaining Midfield Area
Re: Response for the VOC Content of our Proposed Painting System HK Airport Authority
Project - Contract No. C19W05 Multipurpose Building in Remaining Midfield Area.
Dear Sirs,
We would like to confirm the Volatile Organic Compounds (VOC) of our proposed painting system as
below for the captioned project which has not exceeded the allowable value under “Chapter 311, Air
Pollution Control (Volatile Organic Compounds) Regulation imposed by EPD – HKSAR Government
after 1 January 2010.
Coat Product Name Color Solids VOC (refer to Maximum Limits Regulated Paints
# Content % product data sheet of VOC by EDP by EPD HKAR
before thinner HKSAR
mixing)
1 SigmaZinc 109 HS Grey 76 240g/l 250g/l Paint No. 50 – Zinc rich industrial
VOC maintenance primers (r.c.P10-18)
2 SigmaCover 522 Green 60 374g/l 400g/l Paint No. 46 – Rust preventative
coatings (r.c.P10-14)
3 SigmaDur 520 To be 58 405g/l 420g/l Paint No. 35 – Extreme high-gloss
confirmed coatings for metal (r.c.P10-03)
We trust the above clarification will be satisfied to address the comment and please feel free to contact
to us for any further assistant.
Sincerely,
Eric Chan
Hong Kong International Airport Authority
Paul Y. Construction Company, Limited
Contract C19W05 - Multipurpose Building
In Remaining Midfield Area
6. Confirmation of Compatibility
6a) Compatibility letter from TREMCO
6b) Compatibility letter from PPG
CPG Europe
www.cpg-europe.com
As CPG Europe do not manufacture or market primers and topcoats, it is often necessary for us to
evaluate the compatibility of coatings from other manufacturers with our systems. This is done through
technical review of supplied product datasheets only, and CPG Europe recommend to always conduct
small scale test applications prior to embarking on the full project.
Following review, we can confirm that the coating listed below supplied by: PPG
are compatible for application as part of a system with all Nullifire Intumescent’s:
Primers
Trade Name Generic Approved Permitted Comments
Type DFT* Range
PPG Always consult ETA’s and use equivalent Generic Type for :
Approved DFT
Sigmacover 522 Permitted Range
Topcoats
Trade Name Generic Approved Permitted Comments
Type DFT* Range
PPG Always consult ETA’s and use equivalent Generic Type for :
Approved DFT
Sigmadur 520 Permitted Range
For further advice or clarification, please consult your local Nullifire represnetative.
Brian Mroz
Group Technical Support Manager
PPG Performance Coatings (HK) Ltd.
Suites 1010 – 1015, Cityplaza One
1111 King’s Road, Taikoo Shing
Hong Kong
T : +852 2860 4575
F : +852 2544 6109
M : +852 9430 7402
E : eric.chan@ppg.com
www: ppgpmc.com
Re: Reply to our Epoxy Primer with FRP for HK Airport Authority Project - Contract No.
C19W05 Multipurpose Building in Remaining Midfield Area
Stephen,
Regarding to the proposed painting system as below for GMS Steel purpose, we are confirmed that the following
paint product with Nullifire SC801 are satisfied in compatibility.
Should you require further information, please do not hesitate to contact us.
Sincerely,
Eric Chan
From
Member Mark Material Member Size Sides HP/A Report
(m-1) CF5365
MB1 UC 305 x 305 x 198 3 62 1.743
SB1 UC 152 x 152 x 30 3 195 2.613
SC1 SHS 250 x 250 x 16 4 65 2.600
SC2 SHS 250 x 250 x 6.3 4 161 7.055
3 161 2.364
SC3 UC 152 x 152 x 37
4 194 3.517
BR1 UC 152 x 152 x 23 3 252 3.428
Remark : SB2, SC4 & SC5 member not required FRP
BS 5950-1: 2000
BS 4-1: 1993
UNIVERSAL COLUMNS
DIMENSIONS
Section Mass Depth Width Thickness Root Depth Surface Area Cross 4-Sided 3-Sided
Designation per of of Radius between Sectional
Metre Section Section Web Flange Fillets 4-Sided 3-Sided Per Area
Per Metre Per Metre Tonne Section Section
D B t T r d A Factor Factor
2
kg/m mm mm mm mm mm mm m m2 m2 cm2 Hp/A Hp/A
356x406x634 633.9 474.6 424 47.6 77 15.2 290.2 2.52 2.096 3.98 808 31 26
356x406x551 551 455.6 418.5 42.1 67.5 15.2 290.2 2.47 2.0515 4.49 702 35 29
356x406x467 467 436.6 412.2 35.8 58 15.2 290.2 2.42 2.0078 5.19 595 41 34
356x406x393 393 419 407 30.6 49.2 15.2 290.2 2.38 1.973 6.05 501 48 39
356x406x340 339.9 406.4 403 26.6 42.9 15.2 290.2 2.35 1.947 6.9 433 54 45
356x406x287 287.1 393.6 399 22.6 36.5 15.2 290.2 2.31 1.911 8.05 366 63 52
356x406x235 235.1 381 394.8 18.4 30.2 15.2 290.2 2.28 1.8852 9.69 299 76 63
356x368x202 201.9 374.6 374.7 16.5 27 15.2 290.2 2.19 1.8153 10.8 257 85 71
356x368x177 177 368.2 372.6 14.4 23.8 15.2 290.2 2.17 1.7974 12.3 226 96 80
356x368x153 152.9 362 370.5 12.3 20.7 15.2 290.2 2.16 1.7895 14.1 195 111 92
356x368x129 129 355.6 368.6 10.4 17.5 15.2 290.2 2.14 1.7714 16.6 164 130 108
305x305x283 282.9 365.3 322.2 26.8 44.1 15.2 246.7 1.94 1.6178 6.86 360 54 45
305x305x240 240 352.5 318.4 23 37.7 15.2 246.7 1.91 1.5916 7.94 306 62 52
305x305x198 198.1 339.9 314.5 19.1 31.4 15.2 246.7 1.87 1.5555 9.46 252 74 62
305x305x158 158.1 327.1 311.2 15.8 25 15.2 246.7 1.84 1.5288 11.6 201 92 76
305x305x137 136.9 320.5 309.2 13.8 21.7 15.2 246.7 1.82 1.5108 13.3 174 105 87
305x305x118 117.9 314.5 307.4 12 18.7 15.2 246.7 1.81 1.5026 15.3 150 121 100
305x305x97 96.9 307.9 305.3 9.9 15.4 15.2 246.7 1.79 1.4847 18.5 123 146 121
254x254x167 167.1 289.1 265.2 19.2 31.7 12.7 200.3 1.58 1.3148 9.45 213 74 62
254x254x132 132 276.3 261.3 15.3 25.3 12.7 200.3 1.55 1.2887 11.7 168 92 77
254x254x107 107.1 266.7 258.8 12.8 20.5 12.7 200.3 1.52 1.2612 14.2 136 112 93
254x254x89 88.9 260.3 256.3 10.3 17.3 12.7 200.3 1.5 1.2437 16.9 113 133 110
254x254x73 73.1 254.1 254.6 8.6 14.2 12.7 200.3 1.49 1.2354 20.4 93.1 160 133
203x203x86 86.1 222.2 209.1 12.7 20.5 10.2 160.8 1.24 1.0309 14.4 110 113 94
203x203x71 71 215.8 206.4 10 17.3 10.2 160.8 1.22 1.0136 17.2 90.4 135 112
203x203x60 60 209.6 205.8 9.4 14.2 10.2 160.8 1.21 1.0042 20.1 76.4 158 131
203x203x52 52 206.2 204.3 7.9 12.5 10.2 160.8 1.2 0.9957 23 66.3 181 150
203x203x46 46.1 203.2 203.6 7.2 11 10.2 160.8 1.19 0.9864 25.8 58.7 203 168
152x152x37 37 161.8 154.4 8 11.5 7.6 123.6 0.912 0.7576 24.7 47.1 194 161
152x152x30 30 157.6 152.9 6.5 9.4 7.6 123.6 0.901 0.7481 30 38.3 235 195
152x152x23 23 152.4 152.2 5.8 6.8 7.6 123.6 0.889 0.7368 38.7 29.2 304 252
BS 5950-1: 2000
BS EN 10210-2: 1997
HOT-FINISHED CELSIUS
SQUARE HOLLOW SECTIONS
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
CERTIFICATE OF APPROVAL
No CF 5365
This is to certify that, in accordance with
TS00 General Requirements for Certification of Fire Protection Products
The undermentioned products of
Signed and sealed for and on behalf of Warringtonfire Testing and Certification Limited
Paul Duggan
Certification Manager
Page 1 of 34
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
CERTIFICATE No CF 5365
TREMCO ILLBRUCK LIMITED
Nullifire SC801-120
1. This approval relates to the use of Nullifire SC801-120 for the fire protection of steel I-
shaped beams and columns, circular and rectangular hollow column sections. The
precise scope is given in Tables 1 to 24 which show the total dry film thickness of Nullifire
SC801-120 (excluding primer and topcoat) required to provide fire resistance periods in
accordance with BS476: Part 21: 1987 of 15 minutes up to 120 minutes for differing
sections, section factors and design temperatures.
2. This certification is provided to the client for their own purposes and we cannot opine on
whether it will be accepted by Building Control authorities or any other third parties for
any purpose.
3. The products are approved on the basis of:
i) Initial type testing.
ii) A design appraisal against TS15.
iii) Certification of quality management system to ISO 9001: 2008.
iv) Inspection and surveillance of factory production control.
v) Audit testing.
4. The data referring to three-sided fire exposure of beams relate to beams supporting
concrete floor slabs. Separate consideration is required where this is not the case.
5. The data shown is applicable to steel sections blast cleaned to ISO 8501-1 SA 21/2 or
equivalent and primed with a suitable and compatible primer. Specifications of surface
preparations, primers and topcoats are available from the manufacturer whose
responsibility is to ensure that Nullifire SC801-120 is compatible for use in respect of both
ambient and fire conditions. The total dry film thickness of primer and topcoat together
should not exceed that tested.
6. Specific data given in the tables applies to horizontal, vertical, flexural and compression
members supporting loads up to the maximum design loads specified in BS449: Part 2.
7. The approval relates to on going production. Product and/or its immediate packaging is
name or name and mark, together with the CERTIFIRE certificate number and
application where appropriate.
8. The data shown in the tables is based on assessments which comply with the criteria
for acceptability now incorporated within the CERTIFIRE scheme.
th
Issued: 7 September 2015
Page 2 of 34 Signed th
Reissued : 6 April 2020
E/057 th
Valid to: 5 April 2025
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
CERTIFICATE No CF 5365
TREMCO ILLBRUCK LIMITED
Nullifire SC801-120
Table 8 SC801 - 120 I/H Beams 120 minutes
Required Thickness (mm) for a Design Temperature (°C)
Section
350°C 400°C 450°C 500°C 550°C 575°C 576°C 583°C 590°C 600°C 603°C 605°C 620°C 650°C 700°C 750°C
Factor (m-1)
90 - - 3.278 2.851 2.400 2.180 2.171 1.919 1.877 1.835 1.823 1.816 1.743 1.599 1.391 1.190
95 - - 3.377 2.929 2.453 2.221 2.212 1.967 1.921 1.877 1.866 1.858 1.784 1.625 1.405 1.208
100 - - 3.477 3.006 2.507 2.262 2.253 2.014 1.964 1.920 1.908 1.900 1.826 1.650 1.419 1.226
105 - - 3.577 3.083 2.561 2.303 2.293 2.062 2.008 1.963 1.950 1.942 1.867 1.675 1.433 1.244
110 - - 3.677 3.161 2.615 2.344 2.334 2.110 2.051 2.005 1.993 1.984 1.909 1.713 1.447 1.261
115 - - 3.777 3.238 2.669 2.385 2.374 2.157 2.095 2.048 2.035 2.026 1.950 1.755 1.461 1.279
120 - - 3.876 3.316 2.722 2.426 2.415 2.205 2.138 2.091 2.078 2.069 1.992 1.797 1.474 1.297
125 - - 3.976 3.393 2.776 2.467 2.455 2.252 2.182 2.133 2.120 2.111 2.033 1.840 1.488 1.315
130 - - - 3.470 2.829 2.509 2.496 2.300 2.225 2.176 2.162 2.153 2.074 1.882 1.502 1.333
135 - - - 3.548 2.882 2.550 2.537 2.348 2.269 2.219 2.205 2.195 2.116 1.924 1.516 1.351
140 - - - 3.625 2.935 2.591 2.577 2.395 2.313 2.261 2.247 2.237 2.157 1.966 1.530 1.369
145 - - - 3.702 2.988 2.632 2.618 2.443 2.356 2.304 2.290 2.280 2.199 2.009 1.544 1.387
150 - - - 3.780 3.041 2.673 2.658 2.490 2.400 2.347 2.332 2.322 2.240 2.051 1.557 1.405
155 - - - 3.857 3.094 2.714 2.699 2.538 2.443 2.389 2.374 2.364 2.281 2.093 1.571 1.422
160 - - - 3.934 3.146 2.755 2.739 2.586 2.487 2.432 2.417 2.406 2.323 2.135 1.585 1.440
165 - - - - 3.199 2.802 2.780 2.633 2.530 2.475 2.459 2.448 2.364 2.178 1.599 1.458
170 - - - - 3.252 2.860 2.838 2.681 2.574 2.517 2.502 2.490 2.406 2.220 1.613 1.476
175 - - - - 3.305 2.919 2.897 2.728 2.618 2.560 2.544 2.533 2.447 2.262 1.627 1.494
180 - - - - 3.358 2.977 2.956 2.776 2.661 2.603 2.586 2.575 2.489 2.304 1.641 1.512
185 - - - - 3.411 3.035 3.016 2.840 2.705 2.645 2.629 2.617 2.530 2.347 1.654 1.530
190 - - - - 3.464 3.094 3.075 2.908 2.748 2.688 2.671 2.659 2.571 2.389 1.668 1.548
195 - - - - 3.517 3.152 3.135 2.976 2.798 2.731 2.714 2.701 2.613 2.431 1.682 1.566
200 - - - - 3.569 3.211 3.194 3.044 2.874 2.774 2.756 2.743 2.654 2.473 1.751 1.583
205 - - - - 3.622 3.269 3.253 3.111 2.951 2.843 2.811 2.787 2.696 2.516 1.820 1.601
210 - - - - 3.675 3.328 3.313 3.179 3.027 2.921 2.889 2.866 2.737 2.558 1.890 1.619
215 - - - - 3.728 3.386 3.372 3.247 3.103 2.999 2.968 2.945 2.778 2.600 1.959 1.637
220 - - - - 3.781 3.445 3.432 3.315 3.180 3.078 3.047 3.024 2.855 2.642 2.028 1.655
225 - - - - 3.834 3.503 3.491 3.382 3.256 3.156 3.126 3.103 2.937 2.685 2.097 1.673
230 - - - - 3.887 3.561 3.550 3.450 3.333 3.234 3.204 3.183 3.019 2.727 2.166 1.707
235 - - - - 3.940 3.620 3.610 3.518 3.409 3.312 3.283 3.262 3.101 2.769 2.236 1.758
240 - - - - - 3.678 3.669 3.586 3.485 3.390 3.362 3.341 3.182 2.841 2.305 1.809
245 - - - - - 3.737 3.728 3.653 3.562 3.469 3.440 3.420 3.264 2.929 2.374 1.860
250 - - - - - 3.795 3.788 3.721 3.638 3.547 3.519 3.499 3.346 3.017 2.443 1.912
255 - - - - - 3.854 3.847 3.789 3.715 3.625 3.598 3.578 3.428 3.105 2.512 1.963
260 - - - - - 3.912 3.907 3.857 3.791 3.703 3.677 3.657 3.510 3.193 2.581 2.014
265 - - - - - 3.971 3.966 3.924 3.867 3.781 3.755 3.736 3.592 3.281 2.651 2.065
270 - - - - - - - - 3.944 3.859 3.834 3.816 3.674 3.369 2.720 2.116
275 - - - - - - - - - 3.938 3.913 3.895 3.755 3.457 2.792 2.167
280 - - - - - - - - - - 3.991 3.974 3.837 3.545 2.899 2.218
285 - - - - - - - - - - - - 3.919 3.633 3.005 2.270
290 - - - - - - - - - - - - - 3.721 3.112 2.321
295 - - - - - - - - - - - - - 3.809 3.219 2.372
300 - - - - - - - - - - - - - 3.897 3.326 2.423
305 - - - - - - - - - - - - - 3.985 3.433 2.474
310 - - - - - - - - - - - - - - 3.540 2.525
315 - - - - - - - - - - - - - - 3.647 2.576
320 - - - - - - - - - - - - - - 3.754 2.628
325 - - - - - - - - - - - - - - 3.861 2.679
330 - - - - - - - - - - - - - - 3.968 2.730
335 - - - - - - - - - - - - - - - 2.781
340 - - - - - - - - - - - - - - - 3.085
345 - - - - - - - - - - - - - - - 3.406
350 - - - - - - - - - - - - - - - 3.727
355 - - - - - - - - - - - - - - - -
360 - - - - - - - - - - - - - - - -
Table applies to I-section beams with 3 sides fire exposure and a concrete slab on top. Thickness is intumescent only.
th
Issued: 7 September 2015
Page 10 of 34 Signed th
Reissued : 6 April 2020
E/057 th
Valid to: 5 April 2025
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
CERTIFICATE No CF 5365
TREMCO ILLBRUCK LIMITED 550 = 4s
620 = 3s
Table 24 SC801 - 120 Hollow Columns 120 minutes
Required Thickness (mm) for a Design Temperature (°C)
Section
350°C 400°C 450°C 500°C 512°C 520°C 521°C 547°C 550°C 600°C 620°C 650°C 700°C 750°C
Factor (m-1)
40 5.700 4.406 3.050 2.287 2.204 2.147 2.141 1.891 1.781 1.781 1.781 1.781 1.781 1.781
45 5.700 4.406 3.122 2.432 2.348 2.291 2.284 2.039 2.002 1.781 1.781 1.781 1.781 1.781
50 5.700 4.406 3.194 2.577 2.492 2.434 2.427 2.187 2.152 1.781 1.781 1.781 1.781 1.781
55 5.700 4.406 3.265 2.722 2.635 2.578 2.571 2.335 2.301 1.781 1.781 1.781 1.781 1.781
60 6.204 4.828 3.337 2.867 2.779 2.721 2.714 2.483 2.450 1.781 1.781 1.781 1.781 1.781
65 6.381 4.987 3.409 3.012 2.923 2.865 2.858 2.631 2.600 1.880 1.781 1.781 1.781 1.781
70 6.558 5.146 3.698 3.157 3.067 3.008 3.001 2.778 2.749 2.060 1.946 1.812 1.781 1.781
75 6.735 5.305 4.303 3.302 3.211 3.152 3.145 2.926 2.899 2.240 2.111 1.957 1.781 1.781
80 6.912 5.464 4.900 3.447 3.355 3.295 3.288 3.074 3.048 2.421 2.277 2.102 1.854 1.781
85 7.089 5.623 5.133 3.763 3.546 3.439 3.431 3.222 3.198 2.601 2.442 2.247 1.969 1.781
90 7.266 5.782 5.365 4.084 3.971 3.971 3.946 3.370 3.347 2.781 2.608 2.391 2.084 1.832
95 7.443 5.941 5.598 4.539 4.539 4.539 4.520 3.720 3.629 2.961 2.773 2.536 2.200 1.920
100 7.620 6.100 5.831 5.106 5.106 5.106 5.094 4.314 4.214 3.142 2.938 2.681 2.315 2.008
105 7.797 6.259 6.063 5.674 5.674 5.674 5.667 4.907 4.799 3.322 3.104 2.826 2.430 2.096
110 7.974 6.441 6.296 6.242 6.242 6.242 6.241 5.501 5.384 3.597 3.269 2.971 2.545 2.184
115 8.151 6.642 6.421 6.405 6.400 6.400 6.400 6.094 5.970 4.112 3.434 3.116 2.660 2.272
120 8.328 6.843 6.526 6.491 6.480 6.480 6.479 6.379 6.362 4.627 3.877 3.261 2.775 2.359
125 - 7.045 6.631 6.576 6.559 6.559 6.559 6.456 6.439 5.143 4.351 3.406 2.890 2.447
130 - 7.246 6.736 6.662 6.639 6.639 6.638 6.533 6.516 5.658 4.824 3.726 3.005 2.535
135 - 7.447 6.841 6.748 6.719 6.719 6.717 6.610 6.593 6.173 5.298 4.125 3.120 2.623
140 - 7.649 6.945 6.833 6.799 6.799 6.797 6.687 6.670 6.385 5.772 4.524 3.235 2.711
145 - 7.850 7.050 6.919 6.878 6.878 6.876 6.764 6.747 6.461 6.245 4.922 3.350 2.799
150 - 8.051 7.155 7.005 6.958 6.958 6.956 6.841 6.824 6.537 6.395 5.321 3.469 2.886
155 - 8.253 7.260 7.090 7.038 7.038 7.035 6.918 6.901 6.613 6.471 5.719 3.613 2.974
160 - 8.454 7.365 7.176 7.118 7.118 7.115 6.995 6.978 6.689 6.547 6.118 3.756 3.062
165 - - 7.470 7.262 7.197 7.197 7.194 7.072 7.055 6.765 6.623 6.369 3.900 3.150
170 - - 7.575 7.347 7.277 7.277 7.273 7.149 7.132 6.841 6.699 6.446 4.044 3.238
175 - - 7.679 7.433 7.357 7.357 7.353 7.226 7.209 6.916 6.775 6.523 4.188 3.326
180 - - 7.784 7.518 7.437 7.437 7.432 7.303 7.286 6.992 6.851 6.600 4.332 3.413
185 - - 7.889 7.604 7.516 7.516 7.512 7.381 7.363 7.068 6.927 6.677 4.476 3.593
190 - - 7.994 7.690 7.596 7.596 7.591 7.458 7.440 7.144 7.004 6.755 4.620 3.840
195 - - 8.099 7.775 7.676 7.676 7.671 7.535 7.517 7.220 7.080 6.832 4.764 4.088
200 - - 8.204 7.861 7.756 7.756 7.750 7.612 7.594 7.296 7.156 6.909 5.042 4.336
205 - - 8.309 7.947 7.835 7.835 7.829 7.689 7.671 7.372 7.232 6.986 6.354 4.584
210 - - - 8.032 7.915 7.915 7.909 7.766 7.748 7.448 7.308 7.064 6.440 4.831
215 - - - 8.118 7.995 7.995 7.988 7.843 7.825 7.523 7.384 7.141 6.526 4.985
220 - - - 8.204 8.074 8.074 8.068 7.920 7.902 7.599 7.460 7.218 6.612 5.105
225 - - - 8.289 8.154 8.154 8.147 7.997 7.979 7.675 7.536 7.295 6.698 5.226
230 - - - - 8.234 8.234 8.227 8.074 8.056 7.751 7.612 7.373 6.783 5.346
235 - - - - - - 8.306 8.151 8.133 7.827 7.688 7.450 6.869 5.467
240 - - - - - - - 8.228 8.210 7.903 7.764 7.527 6.955 5.588
245 - - - - - - - - 8.287 7.979 7.840 7.604 7.041 5.708
250 - - - - - - - - - 8.055 7.916 7.681 7.127 5.829
255 - - - - - - - - - 8.131 7.992 7.759 7.212 5.950
260 - - - - - - - - - 8.206 8.068 7.836 7.298 6.070
265 - - - - - - - - - 8.282 8.145 7.913 7.384 6.191
270 - - - - - - - - - - 8.221 7.990 7.470 6.312
275 - - - - - - - - - - 8.297 8.068 7.556 6.442
280 - - - - - - - - - - - 8.145 7.641 6.574
285 - - - - - - - - - - - 8.222 7.727 6.706
290 - - - - - - - - - - - 8.299 7.813 6.838
295 - - - - - - - - - - - - 7.899 6.971
300 - - - - - - - - - - - - 7.985 7.103
Tabulated values continued overleaf
th
Issued: 7 September 2015
Page 33 of 34 Signed th
Reissued : 6 April 2020
E/057 th
Valid to: 5 April 2025
兹证明
庞贝捷涂料(昆山)有限公司
中国江苏省昆山市陆家镇金阳路 53 号,邮编:215331
统一社会信用代码:91320583628480126D
质量管理体系符合:
此证书对下列产品或服务范围有效:
涂料的开发、制造和销售
证书签发地点及日期: 证书认可签发机构:
上海, 2018年 08月23日 DNV GL – Business Assurance
中国上海市长宁区虹桥路1591号9号楼A座
邮编: 200336 电话: +86 21 32799000
未履行认证协议中规定条款会导致此证书失效,获证组织必须定期接受监督审核并经审核合格此证书方继续有效。
获得认可的单位: DNV GL BUSINESS ASSURANCE B.V., ZWOLSEWEG 1, 2994 LB, BARENDRECHT, THE NETHERLANDS. TEL:+31102922689. www.dnvgl.com
本证书信息可在国家认证认可监督管理委员会官方网站(WWW.CNCA.GOV.CN)上查询
C ertificate N o: I nitial c ertification date: V alid:
0 2 7 0-2001-AQ -RGC-RvA 1 9 O ctober, 2 0 01 2 2 A ugust, 2 018 - 2 2 August, 2 021
Lack of fulfilment of conditions as set out in the Certification Agreement may render this Certificate invalid.
ACCREDITED UNIT: DNV GL Business As surance B.V., ZW OLSEWEG 1, 2994 LB, BARENDRECHT, NETHERLANDS. TEL:+31102922689. assurance.dnvgl.com
Hong Kong International Airport Authority
Paul Y. Construction Company, Limited
Contract C19W05 - Multipurpose Building
In Remaining Midfield Area
9. Job References
PPG Performance Coatings (HK) Ltd.
2021 Ocean Park Project - The Fullerton Ocean Park Hotel HK 800m² S'Cover 522 S'Cover 410 S'Dur 520 Ocean Park Corp. Gammon Const / Wah Tung Façade Others
2021 Proposed Industrial Development at LOT 313 and TWIL 49 Tsuen Wan, est. S'Cover 522 S'Cover 410 S'Dur 520 Private Real Estate CR Const / FDB Facade Ltd Others
N.T
2021 Contract No. HABKTSP01, Design, Construction & Operation 450m² S'Cover 522 S'Cover 410 S'Dur 520 HKSAR - ASD Hip Hing Const. /Luen Hop Metal & Alum Infra-
(Programme No. 3272RS) - Main Stadium (Glass Balustrade & Metal Engg structure
Railing).
2021 Design and Construction of Precious Blood Spiritual Garden at Lung est. S'Cover 522 S'Cover 410 S'Dur 520 Private Real Estate JMK Hang Yick Gate Engg Infra-
Yeuk Tau, Fanling, N.T structure
2020 Contract No. DEMP/2019/28, Steel Shelter in Tai Po Sewage Treatment 950m² S'Cover 522 S'Cover 410 S'Dur 520 HKSAR - DSD ATAL Engg Others
Works
2020 Contract No SSH 513 Construction of Hoi Sham Park Extension To Kwa est. S'Cover 522 S'Cover 410 S'Dur 520 HKSAR - ASD Goldfield N & W Const. Others
Wan
2020 Design and Construction of Kln East Regional Headquarters and 1600m² S'Cover 522 S'Cover 410 S'Dur 520 HKSAR - ASD Choi Kee Engg (HK) / China Shine Steelwork Others
Operational Base cum Nagu Tau Kok Divisional Police Station.
2020 Steelworks of CUHK Project - Student Hostels at New Asia College est. S'Cover 522 S'Cover 410 S'Dur 520 Institution - CUHK Choi Kee Engg (HK) / China Shine Steelwork Others
2020 HKHA Project - Construction of Public Housing Development at Tuen est. S'Cover 522 S'Cover 410 S'Dur 520 HKSAR - HKHA Able Engg / Hang Yick Gate Engg Others
Mun Area 54 Site 1 & 1A.
2020 HKHA Project - Noise Barrier for Choi Yuen Road Sites 3 & 4, Sheung est. S'Cover 522 S'Cover 410 S'Dur 520 HKSAR - HKHA Goldenwall Engg Infra-
Shui structure
2020 Contract No. SSG505 Joint-user Government Office Building in Cheung est. S'Cover 522 S'Cover 410 S'Dur 520 HKSAR - ASD Penta-Ocean Const. / Sea Park Engg Others
Sha Wan - Data Centre Complex at King Lam Street.
2020 West Kowloon Cultural District Authority Project - Hong Kong Palace 1,200m² S'Cover 522 S'Cover 410 S'Dur 520 HKSAR - WKCDA Arup China State Const. / Minmetals Condo (HK) / Others
Museum Wah Tung Facade Co Ltd / Kentsway Metal
Work / VisionPro
2020 Home Affairs Dept. Project - Provision of Covered Walkway at Sham 400m² S'Cover 522 S'Cover 410 S'Dur 520 HKSAR - Home Affairs Meinhardt K-Peak Co Ltd Infra-
Shing Road, Sham Shui Po, Kln., HK Dept. structure
2020 Home Affairs Dept. Project - Construction of Hung Hom Road Covered 250m² S'Cover 522 S'Cover 410 S'Dur 520 HKSAR - Home Affairs TTE Federal / Silver town Infra-
Walkway, Hunghom, Kln., HK. Dept. structure
2020 Residential Development at TMTL 483, Sui Hong in Area 54, Tuen Mun, est. S'Cover 522 S'Cover 410 S'Dur 520 Private Real Estate - Jointex Engg Others
N.T Sun Hung Kai
Propoerties
2020 Residential Development of “Victoria Harbour” Phase 2, at 133 Java 160m² S'Cover 522 S'Cover 410 S'Dur 520 Private Real Estate - Jointex Engg Others
Road, IL 9027, North Point, HK. (Alum. Trellis) Sun Hung Kai
Propoerties
2020 Proposed Residential Development at Lot No. 1066 in DD103 Au Tau, 250m² S'Cover 522 S'Cover 410 S'Dur 520 Private Real Estate Build King / Hang Yick Gate Engg Others
Yuen Long , N.T.
2020 MTR Shatin to Central Link ~ Contract No. 11241 Archaeological Survey 150m² S'Cover 522 S'Cover 410 S'Dur 520 MTRC Gold Hero Engg Others
for Connection to Pak Tai Street / Engineer’s Instruction No.
1141/EI/008 Provision of an At-grade Pedestrian Crossing across Sung
Wong Toi Road.
2020 MTR Project - Contract No. K2583-19C Refurbishment Works for Light 2,500m² S'Cover 522 S'Cover 410 S'Dur 520 MTRC Wah On (China-HK) Engg / Programe Others
Rail Stations Refurbishment of LR Platforms Contractors
2020 Contract No. HY/2017/10, Tuen Mun-Chek Lap Kok-Northern 500m² S'Cover 522 S'Cover 410 S'Dur 520 HKSAR - HYD AECOM Gammon Const / Goldenwall Engg / Well Others
Connection Tunnel Buildings, Electrical & Mechanical Works Park Const
S:/202102 HKPC Project Reference up-to-date.xlsx/9:52 PM Page 1 of 8
PPG Performance Coatings (HK) Ltd.
2020 Contract No. 2019T144 , Upgrading of Emergency Power Supply 200m² S'Cover 522 S'Cover 410 S'Dur 520 HKSAR - DSD ATAL / Chong Hing Engg (HK) Others
System for Tung Chung Sewage Pumping Station.
2020 WSD Project - Contract No. 7/WSD/16, Uprating of Chai Wan Salt 350m² S'Cover 522 S'Cover 410 S'Dur 520 HKSAR - WSD Chun Wo - CMGC JV Others
Water Supply System – Mainlaying and Upgrading of Siu Sai Wan Salt
Water Pumping Station.
2020 HKHA Project - Contract No. 20189619J840 - Improvement Works to 350m² S'Cover 522 S'Cover 410 S'Dur 520 HKSAR - HKHA Ecosky Engg Others
Noise Barrier at Kwai Luen Estate, Kwai Chung, Kln. - New Platform
2020 HKHA Project - Construction of Subsidised Sales Flats Development at est. S'Cover 522 S'Cover 410 S'Dur 520 HKSAR - HKHA Paul Y Const / Hon Fai Engg / Goldenwall Others
Tseung Kwan O Area 65C Phase 1. Engg
2020 HKHA Project - Construction of Public Rental Housing Development est. S'Cover 522 S'Cover 410 S'Dur 520 HKSAR - HKHA Aggressive Const / Forerunner Specialist Ltd / Others
Near Lai King Hill Road, Kwai Chung Hon Fai Engg
2020 HKHA Project - Construction of Subsidised Sale Flats Development at 13,600m² S'Cover 522 S'Cover 410 S'Dur 520 HKSAR - HKHA Aggressive Const / Forerunner Specialist Ltd / Others
Tung Chung Area 54, Lantau Island. Xinyi Technology (Huizhou)
2020 HKHA Project - Construction of Subsidised Sale Flats Development at 1,000m² S'Cover 522 S'Cover 410 S'Dur 520 HKSAR - HKHA Paul Y Const / Hon Fai Engg / Goldenwall Others
Tung Chung Area 27, Lantau Island - Noise Barrier. Engg
2020 HKHA Project - PRH Redevelopment at Pak Tin Estate Phase 11 , Alum. est. S'Cover 522 S'Cover 410 S'Dur 520 HKSAR - HKHA Chun Wo Const & Engg / Tai Wah Alum Engg Infra-
Canopy at Block 6 & 7. / Foshan Heking Alum Technology strucutre
2020 HK Airport Authority Project – Contract No. C17W07, Construction of 350m² S'Cover 522 S'Cover 410 S'Dur 520 HKSAR - HKAA Wing Hing Const / Lai Man Kee Engg / China Others
Cheong Tat Road Roundabout & Construction of Taxi Driver Food Kiosk Shine Steelwork (HuiZhou) Co Ltd
(Taxi Shelter).
2020 HK Airport Authority Project – Contract No. 3503, T2 Expansion 200m² S'Cover 522 S'Cover 410 S'Dur 520 HKSAR - HKAA Wing Hing Const / HF Co Ltd / China Shine Others
Architectural – Skyplaza A & A Works. Steelwork (HuiZhou) Co Ltd
2020 HK Airport Authority Project - Contract No. 3503, T2 Foundation & 192m² S'Cover 522 S'Cover 410 S'Dur 520 HKSAR - HKAA Wing Hing Const / FAS Engg / South Star Others
Substructure Works. Const
2020 Contract No. DC/2018/05, Relocation of Shatin Sewage Treatment 6,000m² S'Cover 522 S'Cover 410 S'Dur 520 HKSAR - DSD AECOM China States Const Engg / Long Faith Engg / Infra-
Works to Caverns - Site Preparation and Access Tunnel Construction / Wai Shing Metal Const strucutre
Temperary Traffic Deck.
2020 Contract No. NE/2015/02, Tseung Kwan O - Lam Tin Tunnel - Road P2 est. S'Cover 522 S'Cover 410 S'Dur 520 HKSAR - CEDD AECOM CRBC-Build King JV / Goldford Engg (HK) Infra-
and Associated Works - Traffic Sign Post. strucutre
2020 HK Science & Technology Parks Corporation Development of IE 2.0 1,000m² S'Cover 522 S'Cover 410 S'Dur 520 HK Science & Gammon Const / Entasis Ltd / Foshan Others
Project "C" at TKO Industrial Estate, N.T. - Mainworks Contract for Technology Parks Sanshui Xiongjin Machinery Co Ltd
PDWC209 "AMC" (Advanced Manufacturing Centre)
2019 HK Science & Technology Parks Corporation Development of IE 2.0 6,000m² S'Cover 522 S'Cover 410 S'Dur 520 HK Science & Paul Y Const / Lixil Co / Kam Hung Alum Engg Others
Project "A" - Design, Supply & Installation of Curtain Wall & External Technology Parks / Goldenwall Engg
Wall in TKO Industrial Est
2019 HKUST Project - Steelworks 1,200m² S'Cover 522 S'Cover 410 S'Dur 520 Institution - HKUST Ligo / Kam Hung Alum Engg Others
2018 Contract No HY/2013/17, Proposed Road Improvement Works in West 180m² S'Cover 522 S'Cover 410 S'Dur 520 HKSAR - HYD Parsons Choi Kee Engg (HK) / China Shine Steelwork Others
Kowloon Recamation Development Brinckerhoff
2018 Contract No. TSW-C006, Ocean Park Tai Shue Wan Water World 500m² S'Cover 522 S'Cover 410 S'Dur 520 Ocean Park Corp. Aedas Gammon Const / Minmetals Condo (HK) Engg Others
Project - Water Park Main Building Works (Façade Curtain Wall & / Mightfort Engg (HK)
Skylight).Contract No. TSW-C010, Ocean Park Project, Tai Shue Wan
Development - Facade Curtain Wall & Skylight.
2018 Leisure & Cultural Services Dept. Project - Yau Tsim Mong - Man 200m² S'Cover 522 S'Cover 410 S'Dur 520 HKSAR - LCSD / ASD LF Sam (HK) / Chi Fung Const Engg Others
Cheong Street Community Garden - Steelworks
2018 Residential Development (West Rail Line) Long Ping Station, Yuen 200m² S'Cover 522 S'Cover 410 S'Dur 520 Private Real Estate China States Const / Win Stars Engg / Kam Others
Long, N.T Hung Alum Engg
2018 No. 1 Hennessy Road Redevelopment - Roof Alum Grille / LED Screen 1,300m² S'Cover 522 S'Cover 410 S'Dur 520 Private Real Estate Gammon Const / Entasis / Kam Hung Alum Infra-
Panel Structure. Engg / SAS Lighting Co Ltd / Lim Infra Systems structure
2018 Residential Development at Tseung Kwan O, Area 86, Site N, TKO, N.T. 1,000m² S'Cover 522 S'Cover 410 S'Dur 520 Private Real Estate (DLN) Dennis Hip Hing Const / Minmetal Condo (HK) Engg / Infra-
(LOHAS PARK Phase 6) – Exposed steel frame of covered walkway. Lau & Ng Chun Million Hope Industries structure
Man Architects
& Engineer (HK)
2018 Proposed Comprehesive Residential Development at IL 9027, Java 700m² S'Cover 522 S'Cover 410 S'Dur 520 Private Real Estate - Chun Fai Const / Active Way / Advisor Engg Others
Road, North Point, HK Sun Hung Kai (HK)
Propoerties
2018 MTR Shatin to Central Link ~ Contract No. SCL 1106 Diamond Hill 150m² S'Cover 522 S'Cover 410 S'Dur 520 MTRC Gammon-Kaden JV / Golden Way Engg Others
Station Extension
2018 MTR Shatin to Central Link ~ Contract No. SCL 1112 Hung Hom Station 500m² S'Cover 522 S'Cover 410 S'Dur 520 MTRC Empire (HK) Engg / Gold Hero Engg / PMG Others
and Stabling Sidings Engg / Evergrand Engg / Goldford Engg (HK)
2018 MTR Shatin to Central Link ~ Contract No SCL 1123 Exhibition Centre 500m² S'Cover 522 S'Cover 410 S'Dur 520 MTRC Leighton - China State JV / HF Co Others
Station and Western Approach Tunnel
2018 MTR Shatin to Central Link ~ Contract No SCL 1128 South Ventilation est. S'Cover 522 S'Cover 410 S'Dur 520 MTRC Dragages-Bouygues JV / Choi Kee Engg Others
Building to Admiralty Tunnels
2018 MTR Shatin to Central Link ~ Contract No SCL 1128 South Ventilation 600m² S'Cover 522 S'Cover 410 S'Dur 520 MTRC Dragages-Bouygues JV / Jointex Engg / Others
Building to Admiralty Tunnels - Police Officer’s Club (Shade Sails at Goldenwall Engg / Kam Hung Alum Engg
Children’s Swimming Pool on 1/F.
2018 MTR Shatin to Central Link ~ Contract No SCL 1121 Cross Harbour 250m² S'Cover 522 S'Cover 410 S'Dur 520 MTRC Penta-Ocean-China States JV / Ho Wah Steel Others
Tunnels Engg / Jointex Engg / FAS Engg / Offshore
Engg HK
2018 MTR Project - Contract K0755E-17C, Advanced Works for Noise 450m² S'Cover 522 S'Cover 410 S'Dur 520 MTRC Goldfield Specialist Contractors & Engineers / Others
Mitigation Measures at YUL Relocated CEDD Cycle HUB H3 - Package 1 Gold Hero Engg
2018 Contract No. NE/2014/03, Liantang / Heung Yuen Wai Boundary 600m² S'Cover 522 S'Cover 410 S'Dur 520 HKSAR - CEDD AECOM Kwan On-Richwell-SCG JV / Sam Hing Shing Others
Control Point & Site Formation & Infrastructure - Contract 7 Engg / Grand Team Engg
2017 Contract No. CV/2013/08, Liantang / Heung Yuen Wai Boundary 7,000m² S'Cover 522 S'Cover 410 S'Dur 520 HKSAR - CEDD CRBC-CEC-Kaden JV / Tug Link Trading & Engg Others
Control Point and Site Formation and Infrastructure Works - Contract 6 Services
(L3 Combined Double Rail Parapet)
2017 Contract No. HY/2012/07, Tuen Mun – Chek Lap Kok Link – Southern 2,000m² S'Cover 522 S'Cover 410 S'Dur 520 HKSAR - HYD AECOM Gammon Const / Hang Cheong Machinery Infra-
Connection Viaduct Section Engg (HK) / Silver Town structure
2017 DSD Project - E & M Projects Division, E & M Sewerage Facility 80m² S'Cover 522 S'Cover 410 S'Dur 520 HKSAR - DSD Gold Hero Engg Others
Installations.
2017 MTR South Island Line (East) - Contract No. 914 the South Island Line 500m² S'Cover 522 S'Cover 410 S'Dur 520 MTRC Buildking Civil Engg / Jointex Engg Others
(East) External Works in Harcourt Garden, Admiralty - Rain Shelter
2017 MTR Project - C5526-17C, Provision of New Internal Lift Shaft at Tsuen 250m² S'Cover 522 S'Cover 410 S'Dur 520 MTRC Gold Hero Engg Infra-
Wan Station structure
2017 MTR Project - K1085F-16C, New Canopy Provision for Entrance D1 at 300m² S'Cover 522 S'Cover 410 S'Dur 520 MTRC Gold Hero Engg Infra-
Nam Cheong Station - Part Plan of Canopy structure
2017 Contract No. SSC510, Sports Centre in Area 24D, Sha Tin 2,500m² S'Cover 522 S'Cover 410 S'Dur 520 HKSAR - ASD CRBC / Kam Hung Alum Engg Others
2017 HKHA Project - Construction of Public Rental Housing Development at est. S'Cover 522 S'Cover 410 S'Dur 520 HKSAR - HKHA Goldenwall Engg Others
Ex-Kwai Chung Police Married Quarters
2017 HKHA Project - Construction of Public Rental Housing Development at 900m² S'Cover 522 S'Cover 410 S'Dur 520 HKSAR - HKHA Yau Lee Const / Hang Yick Gate Engg / Gold
North West Kowloon Reclamation (NWKR) - Footbridge 2 / GIC Block. Hero Engg / Co-win Façade
2017 HKHA Project - Construction of Public Rental Housing Development at 500m² S'Cover 522 S'Cover 410 S'Dur 520 HKSAR - HKHA Aggressive Const / King Hang Engg / Gold Others
North West Kowloon Reclamation (NWKR) Site 6 Phase 1, 2, & 3 - Hero Engg
Canopy at 5-A-Side-Soccer Pitch
2016 Contract No. HK/2012/08, Wan Chai Development Phase II - Central - 800m² S'Cover 522 S'Cover 410 S'Dur 520 HKSAR - HYD AECOM China States Const-Leader JV / Sam Hing Others
Wan Chai Bypass at Wan Chai West (Direction Sign) Shing Engg
2016 Contract No. HY/2011/09, Hong Kong-Zhuhai-Macao Bridge HK Link 800m² S'Cover 522 S'Cover 410 S'Dur 520 HKSAR - HYD Arup Dragages HK-China Harbour Engg-VSL JV / Others
Road – Section between HKSAR Boundary and Scenic Hill - Radar Hang Cheong Machinery Engg (HK)
Platform (railing, grating & ladder )
2015 MTR Project - Contract No.K0935-12C, Noise Mitigation Measures at 500m² S'Cover 522 S'Cover 410 S'Dur 520 MTRC Lam Const / Wah On (HK-China) Engg Others
Ho Tung Lau Depot in Fo Tan
2015 MTR Project - Re-provision Footbridge Works for YLTL513 West Rail 1,000m² S'Cover 522 S'Cover 410 S'Dur 520 MTRC Kam Shing Const / Gold Hero Engg Others
Long Ping Station (North) & Lai King Station - Painting to Steel Works
2015 HKHA Project - Nosie Barrier for Shui Chuen O, Sha Tin Area 52 Phase 3 1,200m² S'Cover 522 S'Cover 410 S'Dur 520 HKSAR - HKHA China States Const / Goldenwall Engg / Lik Infra-
&4 Sun Engg (HK) structure
2014 Contract No. RFB504 Relocation of the Court of Final Appeal to No. 8 2,000m² S'Cover 522 S'Cover 410 S'Dur 520 HKSAR - ASD UniStress Building Const / Gold Hero Engg Others
Jackson Road in Central ( old Legislative Council site)
2014 Proposed Residential Development at No. 1 Sai Wan Terrace, S.I.L.761, 150m² S'Cover 522 S'Cover 410 S'Dur 520 Private Real Estate - Hsin Chong Const / Fat Yau Kee Engg Others
Hong Kong (Contract No. A206) Swire Property
2014 MTR South Island Line (East) - Contract No. 903, the South Island Line 5,000m² S'Cover 522 S'Cover 410 S'Dur 520 MTRC Leighton Contractors (Asia) / AEL / Craft Infra-
(East) Ocean Park Station, Wong Chuk Hang Station, Viaduct and Projects / Shenzhen Rush Door Steel structure
Aberdeen Channel Bridge for Curtain Wall Steel Frame of Ocean Park Fabrication / Empire (HK) Engg / Koon Fung
and Wong Chuk Hang Station Engg (Holding)
2014 MTR Shatin to Central Link ~ Contract No. SCL1126 (HK Section) 5,000m² S'Cover 522 S'Cover 410 S'Dur 520 MTRC Gammon-Kaden JV / Gold Hero Engg / Infra-
Reprovisioning of HRSC and WCSP Manhattan Curtain Wall / Rankine Engg / structure
Kobunshi Global
2014 MTR Shatin to Central Link ~ Contract No. SCL1125 Police Sports and 800m² S'Cover 522 S'Cover 410 S'Dur 520 MTRC Sun Fook Kong Engg / Tsui's Contracting Infra-
Recreation Club Enhancement Work structure
2014 MTR XRL Project ~ 810B West Kowloon Terminus Station South 3,500m² S'Cover 522 S'Cover 410 S'Dur 520 MTRC Hsin Chong Const / Unison Projects / Hon Fai Infra-
Engg / FAS Engg / C & Hang Engg / Golden structure
Resources Engg
2014 MTR XRL Porject ~ 811A West Kowloon Terminus Approach Tunnel S'Cover 522 S'Cover 410 S'Dur 520 MTRC Bachy Soletanche-Laing O Roueke JV Infra-
(North) structure
2014 MTR XRL Project ~ 811B West Kowloon Terminus Approach Tunnel 4,500m² S'Cover 522 S'Cover 410 S'Dur 520 MTRC Gammon-Leighton JV / Josef Gartner & (HK) Infra-
(South) / Hon Fai Engg / FAS Engg / Wai Hing Iron structure
Works / Active Way / C & Hang Engg
2014 New Structural Steel Frame and Platform on 3F in TVB City 350m² S'Cover 522 S'Cover 410 S'Dur 520 Tele Media - TVB Hon Fai Engg Infra-
structure
2014 GMS Steelworks for Sai Yee Street, Mongkok 200m² S'Cover 522 S'Cover 410 S'Dur 520 Private Real Estate ICGL Technical Works / Kam Hung Alum Engg Others
2013 HKHA Project - Steelwork for Kwai Shing Circuit - Noise Barrier, Space 4,000m² S'Cover 522 S'Cover 410 S'Dur 520 HKSAR - HKHA Shui On Const / Goldenwall Engg / Geotech Others
Frame and Hand Railing Engg / Hon Fai Engg
2012 Contract No. SST334, Construction of Town Park, Indoor Velodrome- 3,000m² S'Cover 522 S'Cover 410 S'Dur 520 HKSAR - ASD P&T Shui On Const / Union Projects / China Grand Infra-
Cum-Sports Centre in Area 45, TKO Engg / Goldenwall Engg structure