You are on page 1of 4
PEMALANG S00KV CONVENTIONAL SUBSTATION DAFTAR ISIAN 1 : PENAWARAN HARGA 4. GITET 500 kV PEMALANG. Ino DESCRIPTION unr] sper | unit pRIGE TOTAL PRICE Drawing (RUPIAH) (RUPIAH ) 3 é 1 Epoxy Floor Coating m2) zeae 243,506.00 59:348.256.34 lz |Colorbond Optima 0,45 TCT complete with Accessories m2 | 66725 1883.500.00 £580:680.375,00 Is |Granit Tile 600 x 600 mm m2) 343,17 851.098.00 292.071 300,68 14 _| Septic tank works (3m) complete nit 1,00] 20.208.639,00 20208.698,00 [5 | Septic tank works (1.2m) complete unit 100] 11.668.839,00 11.698.839,00 ls | Fice Alarm unit 1.00] — 191.717.068,00 191.717.083.00 |r |Head Pedestal Reised Floor pes | 1,000.00 176,000.00, +75.000.000,00 ‘SUBTOTAL, 1.390.719.273,00 Approved, Proposed, PT. GRID SOLUTIONS INDONESIA PT. SANTOSA ASIH JAYA Project Manager ‘Site Manager ANALISA HARGA SATUAN PEKERJAAN FUrugan Pasir = 10cm rupan Kebal ea plan conga Pa TERGREAT | TOMA] NO 'URAIAN PEKERJAAN oer | sar] ROR rs z z =a é Esa TRE EFORY FLOOR COATING A feat iy 1000 micion "a000 | ~n2| 0.00096 |. 080 0 Tania Bia mai ERODE a -s Tucan (93800 | “on ‘a 00 00 ato 0 IMancoe - —ar80 | on | ¥2s 00000 | "srs 00 Tan Bia Uae ESE ais — s Mean Trowel - +0000 | wa s.oodea | ss 06058 Ast Banas = ut : Taniah Baya Perit ELIOT Cho ee ESE ‘OVERHEAD & PROFIT (ovemesd = 6% rot = 20% EE 65.1915 HARGA SATUAN PEKERJAAN 0 | 7 _| Septic tank works (5 m3) completa LL Alea ——— ‘Galan neh sep tank 7 ‘Sep Tank Biotec volume 3 ml — 105 884,04 299.325 0 mish Blaya Maia altar —= "peers 25000 | “08 00 IMancor (0.2600 | on. 525.00000 Tamia Biaya Uae | Persian | “{o000 | “tet roads oe yoo.aae 8 Tania Baya Persian 700.48 08 TES SSETE He 3.297.980, Tao | aa 4877300 03893] 8.500 ,000,00. 800.000 00 473 642,00 108884.96 Beton Tunbuk 380.104, 00| 700325 01 | Seton Tumut, Tsp ats = 12.0n_ x= 175 4200.1 ——360.100001 ‘Utugan Kembali ekas gala dengan Pa 48327300 496,040.96 “Juma Baya Material. 5.08. 560,7 ‘2000 | on} — 5 | ‘9.2800 | “on 00 250,00 - — — 0000 | tat | ano gon | ao aaa. Tania Baya Peat 400.448,08 —t wa FETeT [aa eeTE] ‘OVERREAD & PROFIT {overoad = 8%, prof = 20%) Ea 3082 66057 HARGA SATUAN PEKERIAAN ci eee * 135258 760,00 | 30.288780.00| -|“118.780.0 | ~~ 50.828 00000 - 1.105.50000 | "3.388 00.0 : 1us72.500.0 | 0382.80 00 - 1.920.000, | 2.040 .00,00 oo 1335 380.00| 2581 00,00 Lapel AWG 18 ee - - 367 50000 — '50.400,00 Taian Blaya Upah ECO! a Test Comaniatoning - 7 " “est omrsioning {{o060 | tat | -s000.000.00 | ~~. 000 60,00 aah Biya Tas ¥5 00,000.00 [JURILAW BIAVA UPAR, MATERIAL dan PERALATAN TAS B+ C] z ‘OVERHEAD & PROFIT (overhead © 88, prof = 20% EIS 38.345 412.50 HARGA SATUAN PEKERIAAN FBLTI7.085,00 | Biveyard ena ging woo W omnia wi [aa Ait Bani i Tamia Baya Para | JOMLAH BIAVA UPAR, WATERDAL dan PERALATAN [AS B+ 6) “OVERHEAD & PROFIT [overhead = 88, prof = 20% Baa HARGA SATUAN PEKERIAAN [epee r= Bahan Head Pedesial 190 mm aaa Us oS _C| Peralstan, — — Alt Benty { amie Bina S | oC ER UPR ATER aa ERATATANTASEST GVERHEAD PROF (oetnesd= oH DOES). 2a "5 09 RANGA SATURN PERRIER rsano00 [a CATA ORE [Bahan — ass —os13 “07828 99 13425,00 UURAIAN PEKERJAAN MCAT NO. Rp. z z z z Ese) [Resaa Torana aro 10S IMandor ‘00113 | on. 1887.50 amit 35.055,3 aan — ~ Ala Ba peer aia a eee = “Tush Biaya Perla :

You might also like