You are on page 1of 1

108°35'44"E 108°35'46"E 108°35'47"E 108°35'49"E 108°35'51"E 108°35'53"E 108°35'55"E

PEMRAKARSA:
1.9765599437507 1.6681925414599
108.596 0.54930408062096
108.59652.7166396035172E-05 108.5971.1009854120065 2.1482393834809
108.5975 2.7476064944087
108.598 3.0132012432975
108.5985

Ke C
bo n
Industri
6°45'56"S

6°45'56"S
MIKHAEL SUTANTO

Cire

ir
ebon
Ke
Rumah
Rumah

Jl. Ra
Warga
Warga
KONSULTAN:
2.0062200769691 1.7494952619894 0.32710503622878 -0.43278924053526 0.98281341836365 2.0732296704432 2.3345088910026 2.3284674430755
1.95 0.45 -0.05 -0.55 0.7 2.2

ya Ba
1.95
1.71.451.2 0.7 0.2 Area Kebun/

nden
Area Kebun/ 0.95 Lahan Kosong

g
Lahan Kosong

an
-0.3 0.95 Rumah CV. PERWIRA KREASINDO
6°45'58"S

6°45'58"S
2.0602533762797 1.8346333610903 0.41957788925166 -0.37396453396904 0.98517978152438 2.0145642358147 2.0876587065212 1.9975260868155Warga
-6.766 LOKASI:

Jl. Raya Luwung, Blok Randu Lawang, Desa


Luwung, Kec. Mundu, Kab. Cirebon - Jawa Barat
2.2 Area Sawah
1.2 Industri

ung
2.2718503599536 2.2606013209721 1.2222758960857 0.59246203067164 1.4117670457755 2.0687243705318 2.3099763572101 2.3803306600541 DOKUMEN UKL - UPL

uw

Ke L
(Upaya Pengelolaan Lingkungan Hidup dan

aL
1.45

Re
2.45 Pemantauan Lingkungan)

l
Ray

osar
er
et
Jl.

aA
PEMBANGUNAN INDUSTRI SOUN

i
6°45'59"S

6°45'59"S
Industri Soun 2.7

pi
-6.7665 2.7
Area Kebun/
2.45 1.7
2.4849985683741
Lahan Kosong 2.7111286864758 2.0194964140152 1.5504910106372 1.8155693994152 2.119756917754 2.5434015982562 2.8035292795463 JUDUL:
2.2 Industri Soun

Lay Out Kontur dan Pola Aliran Air


Pen Area di Sekitar Lokasi Industri Soun
jem 1.95

Tr
ac
Pen Area ura

k
Rumah 1.95

Tr
n

ol
i
jem

Pe
ng
Warga ura

a
ng
ku
n
Area Sawah

tS
ou
n
Ja KETERANGAN:
2.5805339726261
Industri Soun 2.8973140733082 2.2957135918831 1.8105184914596
lan
Ka
wa 1.8087279420448 1.9505279727759 2.4742882144447 2.8089684392943
LOKASI
sa
n

2.2
KEGIATAN
6°46'1"S

6°46'1"S
-6.767 PT. Andalan Prima Arah Kendaraan Menerus
Indonesia 1.7
Lokasi Kegiatan
1.45 ir M
ark it
a P 0 Un
Are 3
oto
r

Kontur
2.5782135559721
Area Kebun/ 2.8594720530873 2.452.0616999387152 1.4482001282794 1.446964353611 ir M
ark it
a P 3 Un
obil
1.5926607901724 2.1065997129722 2.4500955827983
Are

Lahan Kosong k
Pola Aliran Air
ru
ir T
ark
a P Unit
Are 5

1.2
1.7 IPA
L

Pen Area
jem
ura LEGENDA:
∅4"

10,000
6°46'3"S

6°46'3"S
2.5747103875306 2.8128597768434 1.827439705509 1.0757165865427 1.0727660356636 n
1.2222258358615 1.7407620386553 2.0879797498809
Industri Soun
KD
KD
KD

-6.7675
KD

Tr
ack
Jalan Nasional

Tr
oli
Pe
ng
Pen Area
an
g ku
tS
jem Jalan Kabupaten
ou
ura
n
n

Industri Soun Rel Kereta Api

2.7303287679391 3.0596967789866 1.8935358191846 1.0313676758506 1.1610040933938 1.3336887978294 1.5695523181586 1.7245310055044 Sungai/ Saluran
2.7

Ka
li C
Rumah

ikl
Warga 2.95 3.2 1.2

oto
Rumah
Area Sawah Area Sawah
1.45
6°46'5"S

6°46'5"S
k
Warga
-6.768
Rumah 2.9577670684863 3.3985005960038 2.0431289082614 1.0977492321294 1.4040690866244 1.5989166824057 1.4566580407476 1.3617096316494
SUB JUDUL: NOMOR
u

Warga
und

Rumah 004
M

Warga RENCANA
Ke

Rumah KEGIATAN/USAHA SKALA:


108.5955Warga 108.596 108.5965 108.597 108.5975 108.598 108.5985
1:10000@A3
108°35'44"E 108°35'46"E 108°35'47"E 108°35'49"E 108°35'51"E 108°35'53"E 108°35'55"E

You might also like