After power failure DG load validation
Day Time
IF Both HT furnace running (40-50 amp each)/ 1 HT is Running or startup
Start 2 compressor ( R160 & R75)
Start 1 EFD ( Line 3)
Start EDF any one of rest
After 15-20 min shelling load trasfer on DG 3 and start compressor 3
Switch off the 75kvar capacitor & 125kvar capcitor bank
DG 01=550amp
DG 02=1070amp
DG 01=500amp
DG 02=1050amp