You are on page 1of 11
wate OFz-320 boiler Mersin [BJ EFOR Dry-Out and Heating-up instructions For the refractory linings of CFB boiler with accessories Rev.01 0F 2-320 boiler Mersin QCAIMIEPYS roo Based on Rosie frau jd [ i Hass. Medio } Rade dadntr (eRGoHCRY (EFOR wate “Gresmbecemenn ita Meating-up opin) ae27 02018 ms Page: 2/9 Vz + t— Ss waka or nd ge in, EFOR 1 dey-out Th document sed on reactor spf instrctions~ Cle “hey tof the CFB lr tobe consldered as separate proces ir itl Mating ap. The ryt proces wl be executed a ambient o peraton presse, A temporary proecin ofthe ant unt pains cement weather requ anasto be decd fore stating the proces ‘he Startup burners to be wa forthe your proces has to erable wel cnt ie of temperatures, holding cevtain trigeatres fora certain tne perk! and protein of the relatos ing for too rp temper nee an lacal nebesting fore string the dry-ou must be sie that the Eating and hadeing of al cekactory omponents have been completed property For hs ease the refactor nig ove og a at uring oa east 24 hows at ambien eperatares oe condor of at eae 15° The latory ning has lays to be protected against water pensation sch i, eri water ee Dryout wil be pecormed by 6 trp burners stale on side walls ofthe combustion chamber, The inet mater delivered tam other CED bor wil be uted! for biter he! dtrbution ‘ought the bier combustion chamber = cyan siphons ret tubes tc) 12 Holter readiness 'sepeced that dy out wil onthuousty paso How-ou roces therefore al esis for opraton mst by eek, ete and ey forse ble operation Fuel utr gs, emi water ect, ash, strument a ee wil Be povided Ke cantina ‘operation without ny nteruption Boe wl be ip by Der water and phe tet of ber pressure pat shoul be done eave ash wil lade to the omtton chamber Al anges Tac abe rerove fe tighies es. rhe ry otros the CF bole le ready Fe operation test in ow eiement: Drage and ens ane sea fo operation oter protection were checked an test Startup burners re ready for operation Fons bowers ar rea for operation Needed measurements sould ben operation (um level water star and ie gs temperatures, a flow measurement, led walt tinction ow measurements, pesare rmeasrements et) ‘eas one yer of ulation stall 2d ot pts are protected agaist ry External and internal ash str shoul be ey fr ash ong, charg ar the ber before nd during ery. rount fash shoul by according oer manus operation lnstructions. fmergency sh dscharg shoul be ead case lesage on pes pat wil cc ding dy out pres ‘Seafoldngs ad constracton marlin operation shoul be rraved y Page be Ha wt Dry. and Heating ineratons MEFOR he heap and cont down aes 2 wll sll temperatures shoul be follwe sly posse has wo be made sure tha on the average the pect As refrence diy. out temperate & taken tempratne mesinrents ot the 15s between Combustion charber ad eytoner Dui bl ip the fg: rmperatre meee and 8 Dey-out during initial Heating-up (option) tn case the erator tring to ei ring tht Fl) eating pf the entheftng eure shold be sition Cade strcons ey 1004 {soo} 800 700 {600} 500 400 (300; “200: 100 oral al al al os by m 0 10 20 30 40 50 60 70 80 90 100 Page wakieo ry-u and Heatng-up instructions @ EFOR (OF 320 aller Mersin ‘he hong tne at 150 Cor min. 12 hows shou enable water vapvzton rom te etatory "he ang time at 30° for appro. 20 hous should enable compete vacation othe cca "eon tine 3 609° or aprox. 7 hous hau nate upper ayer fda praes Produced team ite vente tough temporary pipe othe nce Insaco should ako be ape cse of mar epi the efor igs & treaks Should break happned ding the process befor dey Mt and eatng-ap ae camplete, the folowing heating up neds be app Dry heating up ate 25% The above mentoned rates cn be aplied withau any hklng prods up to temperate ange ontred elore the break. Rees dung hong periods equ repetiien of Wa Holng pvod tere the beat happened tn ase re-conensaton de to interruption of drut proces ar long te al ae place the roves hs tobe restated gan, NOTES FROM MEETING ON 5.102036 ‘aes sper wil be observing the whole you poss rom Begining ean Up to operation temperate of he bole. ery superar my change the dry out cue There are 4 regions inthe boler which have the temperature measurements Unless the temperature diterencas between these eins re toa high be assed and decid by Caer superseor the terpertire ie aagram which sated stove wil be Folowed based on the messremeet on eon 2 alters superior deces that difernce betwee elon te ih, then another og pit (constant temperature ide the Fuace chamber ora defined tine period wil be aed 1 the temperate tie dap ‘he temperature may increase the fanace chamber pi) vp to 0 Cas depron the berlning tor ths temperate, the curve must be fotowed wth tet stop ofthe une: heap ext te27.08.206 e583 athe WEFOR he dy ow start wth he tower capt bares on the Ko wal aes Lat, acing to ned ‘slower eradent than 20 Cel er how maybe wed ing the est heating pred up to 0 ek Ts Better to limite any kh to sudden ea ‘A inspection ofthe relator satace a6 alte compan of combined Drow an Blow out proceses together with repre snttves of Clery, Ear, Raho oda ae2.002016 age water WEFOR — a [ | E shee | ld } L. | | 4a ra ae | a | L — | E : Netter water Dey out and Heating yp instrtons oreazo terrae (WIEFOR Oihaial Sle oP dry-out gracens iS orcund 2100, 10.2016 Thee were Several beitar Gries (90, $:20, F550 ,ale.201e). Ovwal Kenpentire gradient tt wt/h, The temperatures at M00, $.(0.2016: = Gitar Raeqnce chenber lower: Boiler Furnace chenber mishle — bailar Rennes Chanker per ~t00%. asec ~0te = Passage From Furnace chenber te cyclone: 105% = Oown gipe From cyclone te Veep seals 90%. = Loop seal bettem: ~ 60% Plan for dy-out process, — Keep tha temperature teva (W165 "C) Ale 02:65 we will unk 68:00, 1010.20 16 ef middie of combustion chamber in the wnt Mertmie de kemperaton with S*C/, gradtent (erence Cenpeattare on cyclone inlet) — When the tenpeatuce on cyclone inlet reaches bo Menperaloa on wB00%C por He Fowapipen trem cyclone “150°C pwhiclaver domes Aral, tha tengerntos will Ge bept content. (20meurs er haut, it will be decided dagerding on which paremtter fs met) Siyratores: foe, emnenss —-RAYAKD SA, EWERGOTRERM ble Fedde ant, 6277. 09206 voge: 89 wt ry-ou and Heating up itt w EFOR ‘Ore 20 ler erin {spa tet bank nentoraly A+ 2:20, 010.2016 tenpwatwe started to rise, Tonperafre values were 0 follows: —Fimuce champer loves 0 108 —Fimace chemler midiles © foe = Fomect chenlar agpers ~ 10%. A Outlet fam Arce clember: 160% ~ Bosnpive from cyclone to bp seal: ~ 100%. whoop: eal lnfban ne 60% Terpeature metas cate wos 410%. AL (6; 40, B10. 2016 tenperabr wee os Blows, — Parquee chen ber lowers a 1f9% ~ Focnace canker midlle: ~ 380% Furnace chanber wiper: ~A90¢ ~Firmsce chamber outlet ~310%C (reRe-erce point) ~ Downpipe From cyclone te leer seali 260% ~ Loep seal Letom’, ~ love. The values ore according to Gilderys specification So fir The terpvetee wil ghited to be snceaesed again a& 10°80, WW10.2016, with 3orc/h redone Wher Ue reference tempeatwe point reaches te 600°C, another Content temperature duration will abe place ith IS hoses oR Coldecys ——-RAFAKD 5d Cmewgatewne Redick, dns feo one 0920% Pee 38 wate ry-out and Heating-up instructions fi EFOR (0F2320 boiler Mersin, [NOTES FROM 11.10.2016 18:00 ‘The temperature gradient is filed up to 530 (550) °C atthe reference messing point, The temperature wil be kept constant for 15 hour (ie nti 9:00 12.202046). In the meantime, furnace ‘chamber 0,2m level tenperatue wil be around 300 +30) Colderys EWE ROOTHERAA RAFAKO 5.4 — Hi Witlucre Revo ate:27.082016 ‘tachment Page 1 wate Doren and ting one {a EFOR oiler Mersin NOTES FROM 12.10.2016 16.00 From 12:00, the temperature inside the combustion chamber i around 675°C and wll be kept in this constant temperature with 30°C tolerance upto 3:00AM 13.10.2016. After this petod, the dry-out Process wil be officially ended. And the boiler wll continue to increase its la up to blow out Parameters are reache, which wile decided by Rafako/Energothrm, RArAKO $A EWERCOTHERA be divans a NA \ EFoR Coldery Revol Date:27.09.2016 ‘tachment Page 2

You might also like