Professional Documents
Culture Documents
EE-2 Assignment 2
EE-2 Assignment 2
Assignment 2
B. Tech. (Civil Engineering)
Instructions:
1.Write name and roll no. on Assignment answer copy.
2. Submit assignment in proper format on A4 sizes sheets within allotted time.
PART -I
Q1 (a) Why separate grit chamber is provided before primary sedimentation tank in sewage
treatment plant? (03 marks)
(b) Design a rectangular grit chamber and square grit chamber for treatment of sewage with
average flow of 8.5 MLD and peak flow factor of 2.25. (07 marks)
PART –II
Q2 Describe equalization. Under what circumstances this is provided? How the volume of the
equalization basin is estimated? (10 marks)