You are on page 1of 152
‘Sample question for Chil Engineering [Soll Mechanles / Geotechnical Al. The bearing capacity of eo {@) Soll shear stongth parameters {(b) Unit weight of soi {6} Foundation dimensions AIA of the above (22, structures are most seve to: {@) Uniform sottoment ferential setlement {(c) Rate of settlement {a} None of the above function of 23. The resultant ofthe acne earth presses on a'5 meter-high wall retaining sand with ont ‘weight and fiction angle of 19 kNims and 30 degrees is (a) 102 kN (0) S5kNIn! kN 8} None of the above ‘24, Consolidation isa term used to describe the volume reduction of: (2) Saturated clay () Dry cay {6) Saturated sand (4) Fissured rock 0% cohesotestockis way compactdin yr wh kes ten Ye}50 5+ P77 {0 Shear box test (a) Tawa test 13, Sol compaction is usually achieved through (a) crushing of sol particis {(b) eduction of water content reduction of ar content (al ofthe above 114. For the compaction cive shown blo tho ptf wate Eontent and the ‘ocinumay drly a zi (9.170% nd 18.8, mascvet 0 SS _| 40)'15.5 % and 1.78 ginfemrespectivaly qQ (e185 % and 1.73 especie a {G1 70% and 186 amionsrecpecivey “ [Ne 4 | j=" M6 15. The compaction equipment used inthe fel! depends onthe soll ype It's correct to saythat {@) dynamic rollers are euilable for both sands and clays {6) sheep foot rollers ave sulable for both sands an clays (6) sheep foot oles ae suiable for sands «Lsémamic role are sulate for eands (a Standard Pentraion Fst ‘16, Geosynthetics ae used for lifrent application in Geotechnical Engineetng Geotetles are types ofthese materials that can be used for ceases roca a ee ee eed {@) only to prevent movemert of water in sol C17, Considering an extend lye of sar wth saturated un weght of 20 RNa onda Attra he located ate ground sae, he fete vera oss ata dpi of Sites aprox (foo ure {(b) 20 kN (Gate sr sontia ‘218, Shear strength of sll can be estimated using the following equation ‘ortangt¢ “The typical values of wand efor sands ae: {(2}:20 to 50° for ¢ and 20 to 80 kNima for ¢ 050 = for ¢ and O kNimafor0 (c) 20 o 50 kNimafor «and 20 to 100+for {8} 200.90 kNimefor ¢ andO- fore fa, Very dense sand has @ SPT-N value (a) between 0t0 20, (@) Between 20 and 40 350 (a> 100 20, For exacting rok samples of good quay We use eprioabietibe cor bare! {ohseglibacove bare! {@) Standard pit spac sampler {@)hivsal ube (heby uso) (21. Te ued sar tengo ay om {shtwca bo tno’ coprosve stg {Shine cated caro eth Arie incteavel Con tse sooth {aol renod oe cone comes sera 022. The safe design loa ora fog concrete pile dled in rocks generally controled by: apfecteran tte he crushing stesso he concrete (6) tho buckling capacity ofthe ple ((d) the tensile strength of he concrate (228. The ulate compression capacity of a ple ln lay fe given by. Where c= cohesion; Ae= cos section area atthe pl tp kin ftion factor; D ple diameter and Lelength The ultimate tension capacty of the pile shown bolow is approximately (ake lanore the otfct of ple weight) Amand rtedion stiff eley Ne sed © = 60 ka fy x = OF (2) 595 kN (65 KN uN (a)451 1 (224, The earth pressure that i developed behind a retaining structure depends on the ofthe structure reatve to Le soll. Th active eatth pressure Is developed when: (2) Tho structure moves toward the sll Bh Te str dos ro nave ) The structure moves away fom the soi (4) The structure and the so move away from each other G25. Consider the overturing (moment of forces about the toe) and the sliding of the of thecantiover retaining wal sien in the igure below. The factors of safety with respect toovertuning and slag along the base are approximately (Fako the unit weigh of ‘concrete = 24kNnnsand igre the passive resistance in front of the wall): 0am Z Sand | 226% ped G:St0 1S fm foo = tan (45-912) ee Ar FSoveduming = M21 as Fslitig , EXD) pbeq Sends Clepy C= 3 obot Qimaetmecy ae (ana respective 6-4, Ja 2a respectively Cas Oa 426. Consider the constnction ofa shallow foundation for light structure, The sol atthe file consist of expansive sc It wa decided fo excavate portion ofthe expansive sil ‘and replace It witha select fil. The selected fll mus be: | dense wel raed sand tha wil roi high tng sol unde the otng and Sito ive good drabag of ote {GA donc sand vith aun amount of es (Lo. more han 80% fries) that wit frowdergh sng sal une he ooung and alo I wl prevent he fo of water {c)The same expansive sl but compacted, because itis ape than having sos {rom ater areas {Ghnona th stove wsportation /Traffe: 1. A driver rounds a curve ata speed of 60 mifhand ses a wack overturned on roadway level head, How far will he divers vehicle travel before the diva’ Toa reaches the brake? 2, 150 feet, 1 fet C. 40 fet 520 feet, (2.12% and 3% grade ae joined by a 400-foat parabolic rest curve, The P.V.C. = 8400, the elevation of the P.V.C. = 132.0, Determine the elevation of station PVT. 30.00 6) 132.00, 13400 (Q3. Whats the length ofthe Ar forthe following curve? Reclus 250.00 Tangent nN 25-307 E Tangent out N30-25'E : a) 42.90 25°30 - gas 21430 (4. Given the following data for acirculer curve ona et ofhghway plans knowing that you ned the stationing ofthe PC before you cn clcuae the tation ofthe PT wht she stationing of PC Pe I3774460 Re5729.59 = 64s LT Tass p-100" Le 6750 ®) was+75 169 +025 fc) 1385-4935 38s +995 (5. Inhighway wos, gad is usually given in tems of escent 1) Blvation 6) Depress Slope (Q6.The arch dentin of depos of Curve () is define asthe 9) Cental ale subtended by 00 fet of a ') Central angle subtended by 0 fet of hor ©) Cental angle subtended by 0 fet chad Tota re length of the ere in stains divided by the otal ena angl of dees a. the ini ads is computed as 3) 38 fox 6 7 1483 ost 7 . 6) 25. feet 22236 tae f roadways bs design speed of 65 mh andthe maximuan values are e-8% and 0.1, (8. What the maximum valu of the PH 1 ) 035 Jo 4) 02s . ; (8. AASTHO recommended pacepion ad eton ne fo stopping sight distance 28) 1.0second 1) 33seond 25 second 2) None ofthe above (210. horizontal curves designed fora sped of 60 milesour Ite physical conditions rest the radi ofthe carve fr S00 Yet T=, 12 wa values requis osuper-levate the rod 52 1 ‘136 E ©) 0.1 208 (011, An alr diver (th a peseptin reaction tne ofS second svn dowd ona 9% grade at 35 mh ona dy paveren (07, When sidenly person step rom behind a parka cain the path of the diver at dance of 100 ete. (Can he diver stp in sine bef hiting the person? 2) No ures ©) May be {Not salient nfoemaon (12, An alr diver (ita pererption reaction time of 0.5 sean is ving downhill na $Y grade at 35 mpl ona dy pavement (Fy, When sudenlyx person sep rom behind parked crn the path of the driver ata dstane of 10D ce, ‘Cam the diver top in tine on in day? vr No Yes ©) Maybe 1) Notsuliient information (13. parabolic vertical curve connects 24.5 % rade witha 1% gale on aru highway at sation 1751254 al tangent elevation ef 512.6 8 The length of eure it SSD The location of PVC is at 4) #70504 ty, stars sr2isod 8751284 (Q14. The elevation of PVC. 4), 510225 500225 ©) 512.600 505.205 ©) 500.000 (G3) Te tcation ofthe high pom is at 2) ssas4 b), s1st304 seis a) ma 38 (16. The ee eatin oft ih pit iat ») sizeo0n b)sox.600R sisazek va ase (17. The curve elevation ofthe nde points at 2) stz600n 1) 5067768 F506 155 51388 (18. sag vertical eure of 80 ng will corns two tangent, 39% gre an 59% grade. The leyation othe curve ais deeest pit must be a elevation 168.00 or higher to clear a major culvert instalation IF the VPC i at station 0040090 wih sn eevatin of 176.208, the hgh of il equi above the calves 3) 30n » aon 9) 37m ‘43m 019. A new road (Read 100 eaters Do fom the NW, it must curve tthe south been wo isric tuildingsAtthis pon, oad 10 consists of two 12 foo lanes The bingo the ight of ai is nly 8 fom the edge ofthe 6 fet-wide- shoulder. Local pliey is fa the super elevation rates ri exceed 8%, Wllthe minim S8d be walable for veces moving at SOmiph though his carve? Assim May bo [Not ficient infomation Don't know. (020. The sped o aod sete in Doi 0 mph a the trac dest estimate at hat soot 16 ‘mpl The spproxinate ow re on ht section 2) 1100 vphpt 1) 400 vi F960 it “2900 ph (QUI Te level ofserviw ona rds 2), Aquiitive meas flow UF Aauaitaivemesse tae ow Ammer manta #5 9) Aloftiesbire 5 Nanwot th sbove 9 steeareconet (022 Trafic counts were taken an amino atl forfour consecutive 1-mintes pio rng the steep hour The 15-minute counts wore 230,210, 3D and 350. The peak hour factor (PHF) forthe minor rer is a) 065 ) oss ©) 990 on =) 120 (023. The spats rltonsi or lane on AL-Khow Stet is believed be y= 37m M0x (na) ‘Where: sped (3) bs units ok and ow ate) has wits of woh The fee Now sped (3) (a) 603 kph (45.8 e405 ph @) 1824p (924. The maximum ow spec) i @ sigh (Oye0Skph 18242 (aavahoh (25. The maximum owe i (seve 272 ph 6) 1350 ph e498 9 (uo I Water resources! Environmental Engineering OL Density of waters 9989 Kel i gem ©) 10 pa? Otm (2, Hardness in wei ed as .,Te cncenaton of akin an Poti in water. bility of water to cause so sem. The anctaton fete spenda sais CTS) n water. £3) Te ality of water tors pt changes. 3. say he tage ina Wate Treatent lant (WTP) wal bes 1) Sold ema, ') Bitoicalwesimen, «Sand itaon eyDisinfeton (04 A rectangular rina clarifier for a domes wastevater plant sto be designed with an (Sesto rate of 153 2-day Tos ak fo be 2.3m dog, 0 We, and 16.0 fang, What ine ow rte capac ofthe a? vivian sty Soma mnce Ss (05. Based onan aperinent tse mined tha the average lina flow veocy of an ‘Spiers tiny hen teal gradient 0.0004-A sample ofthe agus tested and Faun tohave a oony of 158 Esa the dali condetviy of his nue 2) 400 ila 2)0.0027 mly a 6, The molar concentra of water is: - 2) almole Sono. ©) 1000 18 molefe {2 betenine he Ft Voale Solids 5) nase onthe folowing data. Two ded ilies at wasevater sample was added oan evaporning dish The weit o he empty sh was. S15087 2 Te shal the samp were laced in yng ovens 1DS%C and enoved aie al the ‘ete evajortl, Once hed redo oom leprae, tes eee and ou tobe 25.7998 {Then te dish was pt aflame 9 550°C and eed ae Seer ours One He dish ere to Foam mpi srg and ol tobe 24 808g 2) 015 gmt 8), 0.0091 gn vy 076 on 002s yal. (The dg lo shows gdp ck el aig water Teese sarin (15 limes, Oe mine no Ge, Ow rotor) ad ne jor ut fw (eu) baron of which we kaon, nadie, he coer of ie ona sn) Known oft infowatov latins shown a fee bel, Cale he mising de Sumi acoso Clam et ar sth “sy oilt vemi/s — > ea pom Wie BY 9 om SGA 9 baat cate ee Gane Y= Nan S158) Tee al pul csry 2) 12070 gn Es St tao safe bef] ern 3 monn A ‘| onthe 10 Te angle! ston im wie The ely tins gen Wha he dice Bie cama yerticnt dep its Ie aeyh nt 2) 45 mi tyson 12ams 240 ms (1, Asn th telling syst ic hxizon what i lest fhe Row of water ine 8? ous ; Bes A oc qatine 97 ved. _ eo aie (212. Forthe steady ow of gms inte cnt shown wht is the mean vlc section 27 2) 200m bya Sg By Fev ty/m vi (Q13 What thespian the let ofthe note tube Assume Yate S10 Nin3 3090 Doss jon oa (014.4 pipe dns snk shown x 108, ‘loci tthe exit (Assume Youte= 624 TR and g™= 32.2 se) S00 oyastis 40s * ass y 15. Cason having specie ravi of. i owing in the pipe shown below. IPVi = 7. fi, Vi= 30 fs te pest secon (1 (per sume ch gge peste) andthe fed loss 4 wen ‘hess hat the pene tseton 2 (Assume Venter 624 I an = 32.2 Mee oo verbent, yi a 3 uae Aor lie van 1 6 Pyrorfe™ {016 the fon wos fe (0.012) haa slope oF 0001S. What she dscns of wae int fi depthof I Users formu: = oe a ARE 36m 0 320% 8 jam splemi (017 Water ows a dep of tin the trgemid, concrete ne tunel (n-.015) shown blo. Fivescoe a chamelis Rin 200 fa the discharge inthe hel? Use marin famula = 9 BGA aysizes base ‘Q18. Two seams iscmgs nto ppea shown inte Fig elo. The flows inane The ‘eit te ate of sear nt th pipe nen by 24 0.024 0 wl that of trea by (De 0080 ms whee naeonde Th ext aren ofthe pipe is O01 Find the elo of tie ew eth eitat= 1s ‘rans go Seam oA WW wader vesvareas , ‘ b 2 b > 4d 4 a bs é 6 4 ¥ ai & a 3 5 woe We ro we a is. d Ih @ \s, @ ed Wo ig. 4 Ty Cons reversion pnringk Men? D1. Sour cehectile propected thal gpor eseuled veaek 0%) completion boctep on a Youa! ai eiediny peek Mba perry anh pew higher yp, Frege ty bos ve. Soke ole fo cope 000, meeting with Ke propecl meagre ey dee sdt poem bers Kab you he Ce ee beeen need cea ada mete emptied Saihes abt A GR19, 000000. shad & Ke p Lamm Vatee of he prepecd ( Aud edea cnteen © schecbile BCL or Lihal ’s eaters Pv) A) GR 12, R0000 CS R18,0 08, 000 I GR 20, 090, 000 dh) ge 40, 000, 000 GL Uf « prefect has «CPL of 0-95 anol SH of tot, Kes endeesbe tay Ke prefect és peop resting slater and cosh, Or pot an, plaid, 7 e Ly the prrject 3 progressing slower andi cai lg. tes ther “planted, Uh he projet Spegrestig fue an ey move than planned, HM He pujecl” 3 pragrescing. fate avd ent hag ee 7 PR. She few table chous Ke achujdjes, Aerabons anof Keer propece: aeons GPX 2 contducthon Ack Derahion Depenctency, 6 hav ° Mone, f= = rt B shar —— Dp E- P S H I. Fenish — 0 ——— 6,4, F She evibical pK &: vw slob AEH fe (b) Shexb- C- E-H- Anish! () shol-B-D-T-finith' (A) clel-B-D-G> finish. Composite Laker wage fale & provided fac cack Labor dype Covilfer Kese yatses bo cob eutste fhe. compastde! fdvect overs kow vty wage. ifvenn @, a /00/ke dip 2 onrfle operator OQ R Jofhvecek 1 Meeker a4 96 bof be He, een eet wigecarerge hey fe a GR 30 @ eer hho MEIGR FED eR MAP ® ‘ oi 4 Sf fe exon By proviows qucstiey ean eposente: foe ayotkeley C6 hows) pihal 5 the mon frat dng ene wrequted per mt s 15 mem how per, fous perm by, 90 mn & cane 3 Ae oey mm tel) 225 men Keer er 6. She bodel material veyperred! Jo an eraberkment és 100,008 ecy She borrow material will be obbee'neof from a pil tal hes a swell factor of 20 fy and/ a chrinkege fret P fp Hoes much material mutl be excaveteo (@) 5,o00cy VE, O49 o (e) 120,000 ¢y (of) 125,000 ey 7 For beck yuesbion, if Ke beck’ have a hesped af copactdy of B ty enck, how meng truck. heal ill 68 reyjuiver) to move, Ke material? (a) 9,280 drips by 1,450 dps ws 17 647 tripe ts 16,000 Sips B. whol hype of bond guerantees uf a contract goss broke one dfs Ge surely ouill ray Kenecettey anoint do ca plete Ke zap fob- (ay Bidl bong) bs Cex, pence. bond) nef th payment bo nef e | BP: ehel asoaldl an tnibiad envestment of puitiien G2 be after S feare if Ke AOR~ 9%, areca htead moony WS 156568! OR hy 1538624 OR Ce) Lf, 867 OR, A; 1, 450, 000 9h 3 She inilisl envestment far ot prefect 32-0 mrilicon PR, A ned annied profit of 150,000 9h. és anticipated. Ching a 10 J, atesived vale of vedern on the Lnyerlmenl! hel is He Pry beck period for Re praject. @) COBY years by Ass years le) $36 years Vt) E89 years PI A bik of achivider Mak ave veqjuireol fo complede a prgpecl & shown below, Assume Hal the. ee Sl(ES) of aelivities A Band e0 days and hal he take finish (ot) of acdivity Fis He same af activity 6, i Aeki'ly davadon Prececled by A 2 B 6 ==> ¢ 4 Sa 2 ys A & = e - 4 4 $ BPE \the exéheol activites fo Hit prefect we WB, E66 é 2 BD4F es =" 12. Sn He previous pucstin, Ke bodal /toal for activity Ba a) sb 4) retest WI 3 Heys ty 4 obeys /%. Design] Build meant Kol VI One caerpary vetpousrtle for bo chesign aane/ com biaetion. oo Canfindin bepins befire olenign 3 eorplefe, ce) She prrjeet 3 lecknieally tompler SLI) Bok (ay anol 6s da. he Cerro foe brcek mecus Design /batld ve Lee depen slerls befire chesyn complete Me) Cord plat prvaal fee UP) Alone he tive. 18. She advantage of a derign/trd/bailel eon brochs ad arrangement “lave ) Ww Reclasceel pafect hime o (hy Non adhercop velabonships among pores cuds VO Kron privecl cost before, construcksn (1) all of Re above . - Mes Valse augineering can be obserilead a a Reckeceng cost by veclaetng gfe MS Getligy He Galuteagh tetera, (od Rectheing coupe. achieve bealgel: (dy Rete he ogenin Me pafecl ecm fo aehkve Ke grendat efficiency 4% She proces of ‘en Alpiig and evaloating contrudves we Abd lal ks ealtedf 1 Preguslifie nti yrualifieation 6) Fore cas hg (es Fasd bvebar. Ct) Hone of Ke above 9G hick f He erhirn, ‘ . ogee ao on Oiled esoulel geeur Lar€ ©) Roweh ovoter oP map nituale 8) Sfawe fool ep himate we Oat WY, Arserbiies e SO me de. G'S Generel condi *0"t anh hos Y enamp let of vibed bype y cnet (4) Di'vect NOT In cleceet- le) BoXt 4) mf cb) ee, previlaaifisve, WA) Conbyency, 20. which oP Ke felowirg would nol ba. etawiifes/ ap clivech eat? MG Sofely anol frrtatd expenses Bd Raith'ng Laborfor a concede slab ©) Daderinls fav a shuctiwal steed frame, (A) Bund ahon excavten epepreet erepances 2 Ske He meximum arvinl Of hime oer ach dnd He nveral/ (ty ean be cfalayraf whol ex Propet aormple ton tne | la) Duvehoy VO SEM flock C) Cri hend pert Ul) Free float 22. She final ot buile orawiege ove submited bo a) Gre He archileef pore ork bs keep weeods far Lady maintenance. (1 Prepare far date venovations pr atl fins NF BR b, and 2) D3 which of Me flowing ibsabens veyesronte 4 change over ta) charge ivr ouiners scope sok Bs Soup nd charge tn wubeusfece conditions le) Desyn enor ov erittion ad Ale of rhe above PH Prgheck condiod 5 7 fanedion Hat tes plece* 4 Before. contrneton byeos Stile conrbuchion &y geing on 2) After eambucton an DY Showghout he enbre proces. GOS She firing ve Lekon ship means a ° @) Ackwity e ) Achy eae & steel realy Betays ofl: Ke , hekvity @ can phat ablearl 9 elyps o flevthe stot ey Hebvifh B can shed roel seliys after Hesteal A. ld) awn of Me oboe RE She folowing veladonship mecns ee) ) Aebvity Sher 2 can lel releys beforehe ebavé “B by Aedvity R can tlad> of. cetity A ME; Netividy B ean shel > clays befure he campo, ef sedudy A 7 oS) Achviy B hes & slob eb leat 2 ys sefre Me canptedon of ache A B27 Resouces Covell usually vesutte bu ey sing ferser amounts of vesouees par achuiy b> Shordanig Ke prfech darahen VES ove effieten€ vse of Caboet anol eq) eipment (1) Move work space for workers ye after the completo BR She cancep taf vosraren euellivg work by: l@> Reotces Khe arscuels Bf yesmvecs Alerter) bo some adivities. D) slarbing acbiidies on Meer bale slatk cates VED hifs of noneritied ach fey ain Hey avai table fOa0. 1, Limibug the amount of vesmrees any achety ean pbbin. Avayss and Design Jw lo isfy sonore force Pl oa Aa shove EAs contland “Theyre elton a sat AS AV at ostima rast “ane (2. latore concrete em in cone strstr fo “erat (05 ven the oon ans a sho Bl lad the slope gt the at bea A 2)" 7 Ba E/> cons “Ap 2 Me AB. pee Og ME FEI ei é (taro Water Cement (WIC comer ms, Indecrned teat ‘yee erty. merece (8a renfred nase Ds Concrete in enon side a mjorfet (0.7 concerts block at rectangle seston ve othe nominal ‘ment apc of ts ten ose | 2S) Le ay spate Asie) Dae Attala bs easton) {Man Aa O88) (01. Sta prefered nearing mei concrete bone senate (01. nb enc Hen sd whe tae ane inetd 1) Bem epics son in apn Stare ncetcupt ih (01 na voy a he ig theo the Sender ret ea Spain sent he sab aro a te (018 The ma riatrenet tenor camer sa coms of 1 ars a be Spa ieee om men eat Hm 10mm 14 The wight afone cic meter of sor weg rare cones 8. Moo tas oa “ovis 3 Remedi “Present ‘216 When T-benm spans veer supers cantina then the ent ipa eel ato: (Fae 25H 20 X 10% ave £2250 Gra A 2350 0” oa; AB ee a the enters odin 131,00 mm bzw ‘2 20ntores rte ae 018 The rtm sat hits AE doth eer aig (219. The vera displacement of joint C3 AL, due to he external loadings ‘or 6) 2430004 rs 205,000 om (020 The otaton of member A ons dep nora re 24: member C8 expres on ners the eperire by 10 The the rsa alacant fiat 2-6 dato the tempertere change ny gen Tak he teal ‘acne sak) ber Ais Sm hor The he vert acme jolt C3 DEV Foc ne beam shown lo the Mile es pra for he alee ests ae “~ ‘a 2 2S ie ol ~ pH yh He ay (24 Te sine son one bam bor, eee he ane efor 2) The renin (Stomen ibe) For thestmctere sown ow othe alone £272 085% pene! Ty2 0-080 I" A © ye amy 2m rset te fy RECA some nanan sane a-coanest on. metiat a monte. LE May bee eon cars wersina viCs.00) w0.s109 (a ements. eden we sacarninen ser, pthc seme (2s. Temomeatat ie sppatp 2B (0) On the BALD 1058 nee ‘a0 | the eussg Sho elowo, use the visita) wet, to find the cea (ke B= sea ea leat ee See ; "4 Meany of psitie dayetions F | et ews E> 15P Gpa Ay 2 B50 Fae ears is Sian | dao: PAS Ripe: Rein a: [a elect one t- \ he Gatoy constiuictin Sontect , ' contact stance i eB Qele 4 Qatar conssuction Specifications pe None! of “the above: in the. deyition oF & cote Beate? Ae the -Firal Step gtruckwye Jb to fe et se cake | e22h dasivey, ofan ok PAE 1 to Oo t qennunt be a manna nails lity rey age waded ane final sep ast ‘Scanned by CamnScanner 6. A roentttting Stalive “year Ae: following mie A tog ein a tee mE SST Ey ee ey abe Stieare 32 eatemated te i 43,560 Scanned by CamSeanner 4 a Clee points . of equal elevations on a ea Select ones : As poropedty line ! B catHea} areas Line ce dine of equal alewalivo dh Eeott Con four live. to. Setseric design sakeqaies One developed Select 00 + : ee Based on Soil Type and building PE be Based on aisk and tmpatlance of the ghrucliire with —ojeqate} loss of lees ce Based on Soil Hype only wae Based 9p the podkability Sn the 1Eqie* to, instal 4a Ligh we A workers % elechiians bas %, iebaoes in 0 re sff"ce ‘bailing * Norvnallys 100 Clectricians woreiog oqet install one -fietere Sp penn The Cus Gapeck “to have a 08 , Oke fact) cue © ‘enviroarnentat cond Giron Corews | be Scheduled fay 1 bres coorrectangs« “The dlsvation oF of an ecathyate wil inchucles @ IPF acaks fet : hig consbruckien activity (clout, bos) fe mock early; deeck OFT a he 5 bags 5 Bbsus! ai ve pe 6 days, 6 bows , : 0 Daffy 3 hows : i De Days, B howrt Scanned by CamScanner| A} A gesel bear supports a unifowely aishibuled, ive oy i) we 6 Mipspt ove} Siople, Spon L226 He as shaw? Mts a. ensxiroura five Vad cefer- ela» The code Pe go Aigo 8 ape. yequxed ampmnent Of Inestion of “tne, beat Secten, anise neat = sw ys agy et ea ie pres one: a. 2.600 In 2.800 19" : c. ADO qe 2008 Scanned by CamScanner is “The avant kn ustog - Phyeooed Js ~thate the + Bolect? he! / ~fongile Strengity i €ejual | in! alt etfreotivns fos igher lentile. Shengin’ in (nye cligeakions co higher dencile givengity tm shorér cltzzctions de Lorwey dnstle. Stents fe longer byections Ves “Find “the ~tatef float of actively b fet the pryject cer Pliny = S SmT gy Select eve a | 8 ; eq) fi" ae | i a of ax Subjected ta a uriferen wT! The bear show? . and a oring, ganeentrat tel Joael : Design me ns : Live Load | epee a, ae ead live iad roe ips “ i Ls osarn ennten Live load) nay eidtand , Lingth, of the rer Hee cal, Shea (Hips) ante, YANK reoxirnura LS a ig motte neaely! re BS se nos 5b 86 wood a ee des 5 co 40 mi. ~ Seanned by CamScanner Lee Se it ceuined NI yatiow) Bre aoe On ‘pond fs progestins signed ee Ms ome we ven | ; ore raent enn tics of HeeD AT A ca, averae sree OP) intersection showered neds he OH) ene esme sve oH ae ve ae * St (tec) ak Gin Wes ' 1 a et cpt fa | {LAL \ dgngor SPE ET , (Toy Brave —-2NDAME —gRD DWE fanoNE: shove 6 OVE Select: ore a 36 waa oe a 68 Iq. Sustainable development invelves vay teste, censurption, incrensing 4yiened ond usiog sjenercable energies + be danger Busing? aa deen eetees “peor onsportaticn boy buileing, mate oe developing? aoe qesourrces ade -maxtenu! vole, 0 our as sion alt | eg. Bearching Gor come dlepesi Ch of pass} foes Scanned by CamSeanner ene ne 71%. Ean “Uslnn eotbiutal uti 20. An activated auch i : le with a Soli Ki Mie ae dag ts RAM tin ~ Controf way be nueetsoney because . Seleck ene; Os Nitrification produces acid b The activated Sludge process centuumat alkoaticty es Nikrt fication ppeleases aromenia. CH (Nitrification prockices aetel) and (the Activated} Sluckye process conumes atatinity’). al fet she Steady flow of Gas (nthe cmdait Show, what i§ the mean velocity at Seclien 2% . £m @ ns 20.00 ea. eos lamin Gin liane eB nag + Ee HStale Toy eae ght Pe a tsm/s 4 22+ “the advantages of a alestgn / Bid |[Buill contractual auangerant “is (ate) ____ . Seleok ope Banfi e | feducel ibarfeat® “os. | wie ° ra eany uickeschip | among postin een pect ba ene i a of he oboe Scanned by CamScanner for esate Leveiog covselly dust fn cee fee erect of tinue dor ai oben be park wan eile gous efieioaks | Oe ef too equipral A ont Spee fe me | aye eres ox hae ened spacsfirnt eee eth = eo Why? (59 of Covert 3.0) Fon oaqreqet (260) = 8H LEP OF. of 80 Pie ous e268) wen cement ote osym ‘comer gock > 4th Ie : \ por Sack ae ‘Seanned by CamScanner xe A pccast antl panel 20f long C jiculaw €° dlrasniog planc)x mage High X 4 9 ping bing ted into posiilem casing > Single origen be) Cale connected 40 he “hp of the Fane] ot She in “he fige™ beleo + Thee ‘unit weight of He wall asjalerr is G0 Wb]fes "ne the. pasitian show?r" She cable (tips) is rose realy ———>* uctng Belect ene! PF ba bo BG Ba ds 6-6 gn YO ax has a cpl of ors 004 on SPI of (roto te ineticotts Select ene an te pryk a proqresing ‘slower and casting roe Foan penned a. the prgect it progressing ghiser ond costing, 'es8 stan planned 2 progeck fs progresing fester ord costing 2a ne “than plenned Qenethes pryeoe i gm peing faster and exiting Yess Ahora plan Scanned by CamScanner wey ¥ cumin be prtonste uty enginees | designed ‘civoulere Rey E. tedprensetien Hank ‘With, a eletic 6 he F th the «flow ie ea. see bagt te ie” oe What is Fe tines "Oh the \ Detention “Time = Velume of ternke | Poo f ce 9B PE yEI 6 He ! CH OR fe ds aa fee , & A gure] colleck) highuny Fncluckes a Crist verted! © cusive designed fo, connect a 2 ode with, 6 ae im 1 nm) xsecks s + 40" vertical slangenis ink ag ar pea eteses te The desta speed | : 156» 61 fy: Te ces! vi hs be opin softte Sort a eager aan sp is voatk ‘ eat ie ae sa wok oa eginieoerneS abun 1 ier ws a of ‘Scanned by CamScanner a Hy ® prcaste uaa engioeesy | designed a circular poetry 2+ Sedirenteution tank ‘ust, a dete of a6 has (tant Hh the flow ig 1.3 ssaon weet Gite thee nage Lan ithe cliondler “ef the Teteaton tiene! 2 Svetume of terb[ Pte : Canine as 98 PE Gi 6 ft ce aye HE tas tee " a A gure] cellecla) highway Tocluces a. Oreste vega coe designed wo cgonect a 3% ayode witha 6 mo The! too vertical Hang énls inkixtecl a sla eee, Vatqgr speedy i eee ‘ ‘or 436: wine Seg. oe a . oa beste, §P ‘ ~ eae ete" 0 qusigo ile ied pnw 8 wa, * verti 4 ‘ oe ah So 7 fl _. ‘ay \ ‘Scanned by CamScanner auifiely Hees coeyperg 360 Ib/P Is Wea da She109* the! route Be ‘pa "call hes: models ef elagl elastrcity eel te | ae of the a ~Sectiona),, rea. = 0 4, in? the. _ Aongation| ig? raste smearlys | erry Seton ily atlatbeantola af eos ' ek yy died 5 G. What i meant oy! Re the lenapal theory ltilitarin~ were? Briers ae oem your enlightened Seth = wrlerat we mare editily - happiness - objective y xioize it function and no) 4. Pied are tetel float dypsteedd i ay geen aay" ‘Scanned by CamScanner TI cctcentation si Vee eat ceatey “Greatment plant treats! a fit Pee hk ‘over 0 percent of He tefal!” susper ral boson is 684 In Manlen ry reiea ys | wthe “Tse. removed (eg) io “the, ben, 18 abo uth | ~ nt | ap oreo al yoro: ce wnaio “types of plaiive rnoveenle Occios q jn Conemele, ave: a plage Settlement b. pailfe: abrinkage er 4,8, only ds Node, of the above - “We: Find the. early Short $ las, Shark af’ aetivt DI \ for, the progect t . hte a Pet aytan gity . \ wed \ ie ew ‘ Jee ead a Myon eoeaieng : mod a Find the ota) féice in the A peinfeicement in the bear a! Ghen. -fy « co.o70 pst ) nie & bephas @ ctemaiet f S/2 vote ice fy ay o 93-8 bors ol ph uses e+ 169 tons d+ 26.8 tons. oe —— ‘Scanned by CamScanner ee to. oH pe a8 aha be pope fo eg Ae over aerailio® Bere tow oo oeliery sludge c. Nitvification ly. aairg a : & sulking Sludge + : i va. 4a ‘une Beare shown below, “he the Maller - Breslau pain ines wee answer the apllcuniog, ciple fat the Inguence hives cep aN to cthe Sele] Lines Shaw E Ms on the beam above? 4 describe the influence. [foe Ae y! os Ce, \ te ' ae “The reaction ak & . C cthe momenta dof ate yp oie fi Go The moment ak b ve ats The Shear at © lea, Me oor ol a ia A pall ORME oy : fo, Audits hy) Aeorss : \ hoo ce una troughs > Bas det a \ : ' va canguner jae AUC , ie AoE a qckivittey tek e Show? Sa activities AvG oa e co aays 2! 4 a is rau ‘oeivits, Airigh (U) af ectvity F Scanned by CanScanner Duration (days), Bile do Freee meet ad yaye Holo, ae wihas oni 6 6 tp 4 prot a 5 yhul vndlne i Fo ia ae i vile vd 1 6 cle raat PD ayes SP ny ee 2 63 2 MaHfok mH yy his Us =Le -D oad wail fyb ” Vpe 2 ukeep loess TUNE aml Behe ass ee ee bth ail vase hop ott ic, tw 4 ae yaa Pde vaian ott a b 8B: F BAe vos By ‘ ce Cy DoF sto amt oa gy a VAT rE? Hath ats seats atifforen | applica’ ses Geosyntnetics rc i extilesi one TPS, | Gpotectmfeal ote used fale shebeny tha a a on ax only Soll ah a Set Yellen 11h Dion tte, NF ai prin opal ee toerek, neve a nr ee Bott pieény oy eat. * in 3M a Nad to, Sol pp wate ri bteenen| ce ! eae ae Pong ‘Scanned by CamScanner SS fee Which of the lovee pietaietn os porimarily ouhy mr sehen a # Wes a. counterfar &) eealtivies al Ue Mechanically Sbablized Vall hy a) © sola contilersy sfeloieting oll: bea, ee ee ‘Loadéa"!""48" sghotoo(- rhe, the roan u el AY bedi 115) sal et ‘ote Fe NE leoty or aad TA fesse se PEND py be 450 tbs He aes potions | cc. ago Ws : STS sl a i de gi0 eS ‘ tyro tind of Mn a gustainable | — involves : of tacin consumption, iboreasig eypicterey ond using aencaniogob! enenpies be danger bation® using eS ex design ond enalérialt ce dereloping better -tronporbation by abuildiog mile sfoadls- . | vy dh Searching 4a onde leaps of fossil fasts chanietertelres Com eRe, Scciswn of the ergner ecept 2 CA It go ich ont explain cle spain Sy gpther erections ” ine Quantitative srinking e perpen seill ce Honesty er logicot dyeing: Scanned by CamSeanner | a ol ee drdwing arte [ Sitbrnitleds-ito | x Ge the anchilect peje) wot 8 yh Late rmintenarce 0 ty keep jecord® fi as " vee fay tate gyenovations (0M) cat t c 4 geo (& and 67 bene] } Me ym cant Biabing Colum below or stroke) ve osm Sil Lage ofr bee ae maa ae Ex! pete: mmaeeoye) ee oak sail et footing Core othe mtdpaine ot Ne cause can be applied wawie. than ida RSF oy is *t00 pats “Any con "eg ane emote) 28400 Brecomive settlements Whe s veces a pw Le oppited on he tT” i Bl aigertation 40 be Mle alors | Assume Streas TE v1 i bool \ \ ' ( Gets weak sat od Be 28! OMS rivet, ag, #88 or Pe lett [rel state en ( owt a plese Scanned by CamScanner ced: tig ty Feet | Ba. Wate ee Mie if, rg Blege of Prociection of portlanoh,,.cernen cus Silicws ayn! ' foe Nevantoa dot ber oved ol Ly : couleiunny Sehfaté hewn SP al None a vb les , gy You syecetveel O° iyotes “Honk? eats oomph’ Supplier Py the fall ergunt of the puehanye glee! . ooking Macltietion cf port § pickled}. clurr'ns sty tere tae af P 1 eee EL salle 0 grote joer (oo) computers fH oa ceived tony cag) cto’ os ae Return “the lovoice ‘Wilts leiffidval eke v5 Local, the Supplier ase f84 fplapepeenttien | fo. sue «cheng orden ale Maes HE parent ag. The fotlousng aielectionship meant | an chetivity A cor Short 2 loys byeie the gave *f pe Activity B can shee adays pptivtly oc nekivity B can Bla a days before Inatwity 4 : gar ot , geaty © et 40 Oe . o a apts ay aetivhy b ‘Scanned by CamScanner | : Y spin "THe “Hlevapehice fl brvant lacill | of ta BEY MP | A a woork package, bel ay g- Subdeliverahles setiucit ee ensls aceauint bial uh "pe Bebivilga rojo, aelivewetlen f Alb! Vprqpeten ieee eae 0 wo el 1 1. tinge ght ea fn OR ha djto ih I nes eg ore an os ee nee tres tole) ros each oat tee 4 beanie fn nis» Gclucl i questing. wert coer ely) aiaggct: gpetsmoakeeld 4 ard alsin 2) or | Hedy wit Ah one eT ‘ ig vii Wet tog ¥ hE ee oles : te AY wong: Beto teat Bad a Ig yi) yet fet, Py eA Cyto Me al 3 we ve Set dthe beam ended 98 Shree to be figure beter: coe is vo? ig Ane leeatten at uchich che FFE from eye suppstt be me from Liye Suppett ce 1a. Gye from Lye Suppete (9715 Fe from eft Supa & The feral Sap io “the definition atracture BD! of the wok packege a. assign codes -féi each actvily to Sa manager b. assign “he cost account ao assign the pork package 4% nanan a. qevetep AME Yesponcibily water's jnclucte in the. final Sep. e. none °F Arese ote 3, phesphaus cam be sjersoved from ferric cHoride action vw chlorine. addition spar SEVERING comb aclgorption Rapid ond Filtration of a work Breakeelousn astiwaley by; ¢ ‘canned ny Lampcanner uae Yas $A scigil beam, weigting 300 byte is ised aiiggion] cables a sheen «The Colas are: Zope with an appective tocdulus Of elenglicitey Kei ancl efgeetive crets Sectisoad quea = 0-4 oh The abet walion af tla, Cablen i enott cay , | ' j bitte } pat, It ates On 066 in a Cet a oni io geThe Jewesk element in “We Wiexarchical boteakelee? + the wes iS a: a detiverable Ue a. work package c. @ Cast account dee Jowest: Sulb- dleliverott a an objec (f. one af the obbove « Ge. The Slump et used fri eo & conerds workalotting be Cencnete Strength ce cement Mie aesign dh tl the above dine, tenstnuthion, of 4 Shollats -feundation et tre The Sof ot the ‘Gite consishs of Pe aive gets te ame Aecicled te Pxcavale poten - me expansive ett and ‘replace Ht will a Selected Fue the Slecded HL mast be consider a Light os ‘Scanned by CamScanner oO. dense uxll graced Sarx| “thal will proviele bi he Fae ety Sell walter tbe q anal et fe wl Provide qeod oe Saeed with Sufficient azoonnt of bine Te ¢ tran ray Line) ‘ wit) paovkle, high 4 erg Spi undle by, -fecting bd otto Gk will pojevents the foo of white Soil, but caropaded » become ik the Same Expansive a soils peg ether ome is cheaper than banding de None of the abe. 8: The mda Concentration of wale is a we almde ee 55+6 mole. ce loco git ge 1s malelq. |g. What type of cement bs komen 04 general poxpse cement? eye | Type 4 co: Type ae Typew to The ‘thain causes of 108 of durability in conereli. ove a: A crocking and Spalling due to cprresicn of 2elofo~ be aonek by Super to Set ond ground ~ water ce Fie q. A end B only Y Aa of the above Scanned by CamScanner cite eonnects two tangpeits veh cf gre eThe “lope ef We srnete Lad deanery intersect We A vertical cusve clangent. bas a Slots aye Margene & “3% ta agro nd cw At bode. tp the longs oF vereleat cee ts (Ge She Nekeiks renee mnerelg he plevatian of tie. ENC” we of th ve ¥ + Be (rot: to sealed ce HO fe be 6 fe ce IGS ft val aro fe be a y eaqyinsl: oyotieno| -foiluve | itico| aetetnuen facta of Sat} lope, Long. term 2° gatsentc cond exceeet a. The ver permanent Should ect Fl a Vs ae Conta ae Ue tg. while estkiog 9n the final Skagen of @ jobs Stet AMice lik one Srnall dase, eI eo cortiock’ Fes been Volaked accidentally” \ahet should you dO”. client about the diecrepaney ore OK hrierhe fat) “the athe) what 10 do: 1 incthe cenkvack 4 sould, we Lak gg. EP Sti ae Sat, ee Don't woe about it, ut Lia cs ct “he chien’, worry about tt later Af 1's iroperant ribey celeess, athe Slyerk™ comtbract violate d. Fie abe person uho cacisecl the Scanned by CamScanner BS. Finel ye Maximut lending momen’ A Vee assumption of the vedionat rnethod fel efeler Oe wing qeak Burnet spa 4 anlerghed Gh that peat fel on avers sl intensitey- Locus de aratngell cuvation is exqtal to 6 inn the same ef concentakion bof othe sgain.fall | weak aixelavee per caja ineventhe epee ilensiliy ye avjea. incvente cs Occurs ony fT us he. drainage de crrns tf ming! devotion is Avs that the of concenhintinn seen " of a beorn doade« with a Uniforin deol of 5 kipsfte andl concentvotec Aoac| of 30 Kips so Bes kif to 146 c+ aaa Kip tt de aad Kip ft le The Accredttstlen Boned of Engineering and “Techmoters taper) is an accrediting ageney fer « ‘ neering education programs bb, engineering fundamentals examinations cx engineering, firms a all of the aloove. Congkruchirn Lean means a. an engineer a & contvactot ae all ansivers are fative he an architect” ‘Scanned by CamSeanner 100 Letras poet Wai hepragh of o cbaie Ty cin thew jm y ' sanetenean plore io ne OE FP prtcesyateatton oes Hee + Mee af the eninge LON Liv geacnes. ye niet op eyed ey davon UE, Re stabiny y ater af he eee cae fete oe tag cer fe [See Bsn ce ager cute ft [See ol. aged OH fe [see fae Consicles the fetleot Statements: of vat masony J inguernced bey the ayy enol mmascoy 8 Ane motor achetves fell sven gt ck Than pement orl paso” 3 Moxtay Suengt decides “Ihe strength ef mason]: non aod 8 bb. 1 only cy ond 3 my a 3 of ig mot eensicleredl to be char varied of the _ottosto aorwistic oF project’ 2 aan established objective a clear be inn and ered com plex ea J fer tnlernal use done beféle go" ( b eS a ey yi ever keen ‘Scanned by CamScanner “OR ope uside Sidewalk has an effective watkeray width GO fe. the peak IGmin pedestrian few is \aco Perlestvians othe platiin- adjusted Los 1 mes nearly Oo Los 8 b Los ¢ © Las B a. j 82 In Wightoay usmk, qracle ig usually qiven in terns ef | a peveent | b+ elevation ! Cr depees Slope» is ie * ith an elevation of 3. Wf the vee f¢ ak Station +co-00 with an eleva’ | THe +20 fl scthe eight ef the RN SKquinedabove the culvert is a: B00 Ft to. 4210 Fe Ce arto ft ‘i doped behind a sjekainis ag. The eaath pressure sthak ig develope re} o9 vert the Struckwte Styuckwie depends on the movernent of dielative to Te Sot! The active corth pressure develo} wed when: ‘qe the Strucksye moves counvel the Set sthe givudtuve aloes mot move, so he Structuze moves arog -frem the soi} she Shucluve and the Sot! rove ea fom each olher- a ‘Scanned by CamScanner & leaded ag Shown A cishyitedeel levcl ef Died and a cencentoted dene ef 210th AY from poll As Fiat cle seyasiinnnes Cel oe a cole [tte ‘ A BEINN DINAN YS) p . Moo . ty kate feo > Os RAD The ft yt perou. Unes fe Ce ate Ie te ae aeoo Ibs ft Cengictey the following Slatimenti t In aq Simply Supple beam Subjected te uniformly distributed Ammoughbut the engi, at ehich pois ge the Sess due to (OD Hexcere [ny Sheer equal Zero Selectively: te Ak Suppeit Seti ak neutsa} fibre + fas At oni Span Sedlien ot neutral fibre ge ae roid pan Section ‘ak top bre: t Section at bottern fibre Jae Stepper f a ae of the ator glatements slvr corrects and > Ga and 8 qe ton d i only ‘Scanned by CamScanner ! 33 gatnuing Successor ajelatienthips ore avatlaies ero Prajeet’s What Js the cluveton of the praect® Actively 1D puvation Surecessor Gaays) A Ss 2S 8 ir 10 c 6 DE > 8 & in e e 3 a. 22 days bw 26 days net 46 dons a ‘Scanned hy CamScanner ees - fetes bee weeny Ye i Oetainn wall Section ait woos efticfent -feeliogy a ning wath the f M MpMeration “and seed jeinfelcement 18+ 4 % an anne Dy CamSCanner a A Coney. ox pea a ‘roan eae fo the, Hell” cettrac bil’ — ennployee.’® ard will + Bete a pours of effet “the eantroctor yas 10 ebiotes ovo Miele to work Anis take EO eeauel a0 el | and 6 be felony Teak Bond cae bel gubomtxorted and they bave 4g weeks and anna cbiveld altoctlted thei abo bow! {et shoight sre at tvoc! es 2 ies aera trout weep protuclively” | eoeval coratitional east $ rive [lord exor'| leq contract a Subeon savings om erent —_ est | ae ~— m phentts ces 1 contvacloys ae OF sil ee mmosk neOwY gp wuks A. a: $ 91008 we f 5100 cg 6100 4 10)00° a wie of the sant esi wall type does prmnony ety OP Bhengin of the concvele? a ergot wall che stobtized \ ox Busbveased jeeaiciog gk cantilever retaining wall caall Scanned by CamScanner * 4 J aoe mnt i Be huss Seu ted, ee wil = gral vite] the ‘Jetloucing Cloke E 2a60 Gpa (950 x 10% reso" 10 toy eo" Fe Ther the, Vee eat aieplacernent of Jo see the eaperhe cham ony Ts gen Miruceeal co efficent our thx) tp af enter 68 ene eeaue tone HEM, os 435A HO bo: "Be" G12 mo i HE Fat mo i a 1.80 ‘ ot aod in the conduit Show > | ag anes fe Poin toe 8 0% ; oe ols HN ees Gon dart |e go ls eet 7 1 ato als raerern pe vstalint | Re isms ‘the bear Joaded as shows fn -te fiquie below be OG ce lection at tahich Seow Jace Eero? pl ‘Scanned by CamScanner BFE fram deft Support Bete poems lope Support WE pe frown Aye Support Wo fe farm Lat Stypore © FA comewate avin, had the pleating Spreifieation | Cement cenent = Ga Abfyyd (qo cruneot = 3) tine aggregate (ep) = wa Lt} yes of S60 fine. “) age 28069) 1 of teri cement gatlio 2 & qettons por Gack yw cement? Sack = 4p Ib> Air content 26> regate. equated por eu" she volume of Coarse CAPPS | ya of eemevete wis vont meerrly f he lead - one} cod hydrant Jack Tanchange to ane back of the Live & a 1 fa the Med prropertion enaicedtid » the elorrgation Cfo) is enost easly expestee strane Ens 2 an, S00 FST Epr_coreirsine foro ~> ‘Scanned by CamScanner a: ay be 3 ca | a0) | 4 The rreiskuge cenlent’ ef inher wed outleting | fromes Gan be ath the | ye Bh Io) | lay wey ds > aor A primary galinentedion basin fel & eecunicipal wen yout of SGD and eet Wo led Goticla «the basin ' | woalér Jgeatment plant veal a ~ored o'r. ofthe “total Zuspenel Gott in carnelir with a clepth of 15 FE =ved| (ty) to the basin ig, bout * athe TES PO a+ (00 br 1000 9000 ‘Ay 09 te colette Ane roment: My, oe 5 Fe Kips a 28 Kips — as ape OCS d: zexo- ‘Scanned by CamScanner oye OU, cf wal) pax ae eae oe i Pint vwnise be Iroparteel #01 M40 hough @ api nix unite (qiver 2 unl, demoparerlinje of SOP, A elosign ees iene ea 1 Onda velecity qradient value of Aco ae Lae e 1Ts ds 31200 tae The iwlegeclion ef the was @ the 085 “® he a+ Responsthility matrix es jisnal Matrix cost aceewnt cle Sulb- deliverable e+ project overlap: 14+ The molar concentration ef woaley és an 8 glee oT ong rode] e- woro git ae evoke |g: ; is. Seisenfe response: coepyicrent (6) & a wad hoe ~founcled to be oto» The exgictive Seisric 4 of a column 4 i go tant oe 3co tons ic yore tend a. 3m Scanned by CamScanner ee y v1 wnt a 2S Sols and CO Wee edaket bo i Ihe difference laekoren nownallyy COM? Ovevcuntoticlatlec} Kotte ef 4 and Sueinteatly Cartnticlated gurl ee. Saunt Verrcemgolichited Soils cry. unsalee b. . cor guttable PTT cet Ac gail) oe Novmalhy cenenticlatar) Sails le slechmict) esi cite. owe-rconselidated to ce Normally conseticlatect Sells howe beer cuyected 4 Jorge stveyses tr “the pase wokile veveonsolicla | have not a LAL Novenaity consolidate} Soils have not been Sal ey davge Strength io the pose tobile ovex ated gotls here. ' watghe (XD i TA tower crane wit & Teco I counter we een © ad with a 15 fe» boon daca oe i ne Ma weight ef 070 Te (CG Show? | en faire) the tower weights Boco Ves the 6 Fe x ELE footing we'gh* 20,000 tb Wqnoring wand ae othe ae ond tha “the crane can dite overturning, i nose NENT | pe _s acres eee (4 Poot ae] = ‘Scanned by CamScanner A We tw OF Fe kip be ea wip VEX ito tsps cl ira ips " coyink wits @ 8 on tee UE fpeeafication ia fe le : ehreuuings , whe tate ment ag cerrect’? ae Petafly sae cvey notes ; py ananingys be petaile date precedence fn dake. yrtecectomee OVO aheacotng’ jfication ee beet ah Trawsing oles take precechnce ore" Spee 19. fer the breays Shean below, use The viduap werk ‘a Methed] “bo Line feles’ng Crake @ ¥as4"4 (asso & 1 EM! and (+ ast mm t rot 1 no doads act on the seuss and mernbey AB TS a hort «Then the. woviasnkel displacernent of joint € 4 Bs C'y I len ae 43-0 0m 4 P 5.0 mem (25%, eo C460 0 a, & Goma e sos Whi of ate fallout ras tre vee ferent jnyelraud’e tectino? cas Seevichele oo Triangle whi 40 angte Tnclucteel o- Trape zor with 4s angles a “Tropeaorel coll 20° | angles as measured fron the. horiaentel. ‘Scanned by CamScanner a me MT, a bh DQ Hee Cel Asa has Just approved he imitation of e praject e le brate tay %¢ be ce) cnet esta Ge Mational chy sali es Metin 0 AMC the preyect manageq bay the Ress: © Vor fire task thould be “to - etknblish th. sepostiog procers the ete Leork on the project Scope, prop Ce make 6 pee cxecpenee| costs fF ws te a delivetng the prgjret chores etsy rae Ge cat, the bass 04 to hoe TANGY ckars, members would — be allowed To the project: | Os the +fiqure Shores ~the tones acting on a been “The Shed” dlagrorn rest: eedrly. i | feta [> a ' oS ‘Scanned by CamScanner hoy ee Slope at ¢ (he molel-gpan of the feces) 4 Bho petmus (6 = ee ere exo ' b+ 9016-66 /er : © e666. 6Je) 4 nasa asfe] Mebian Beonel ofr One inf ay. ABET gkands for AcceHt Techno logy ae Tae ‘ion QR b: id aun inital investment cy oe aly? aan ys if the APR = qx cccel be epi Pia a1 9k bye W626 (694, OR weenie ets rite 8 py ‘Scanned by CamScanner M Evy, & eet ay phoning te yh Vorting Lo phwcee ey thvallee” fewrelation aa chown Looce Save oft ley PE i eat Aoone Sand Gnd ef loundla Engineers have decided “that Loose Sera) clay care nok Ce lot of Sceppemting “the >| bien wlinout beetng mhecitee| who fe the bese FOr und} medt-ficattor snether] forte Sil” . £ cond carte Ct ten to Keak ofc ced ya Comat, rane ep eaing > eae Det Sand be conduct ayparefe crmmpaction Jo treat Aecse Bane anc conduct gurchan yng tp “trea Bef clay Cc: Conduct vibro cesmpadtion tho “break Soft clay and ctnduck pressure grouting to trek \eose. | Sand « | ge conduck payee growing and conduct Surcharging Zane} ko treal Soft: clay to beak loose ‘Scanned by CamScanner cm 5 1) Acompany has 2 painters 25 metal workers and 40 laborers Panters and metal workers work AC hours injures eported by painters, by metal workers an by labourers, what isthe incidence rate? a) 324 py 282 fe) 866 4 ms 5) forthe beam loaded at shown int gyre below the bending moment of 5 from the let support ik most oaty 2) 160k tt wpss0Kipt 9236kpte 250K 7) site with ray sandy til shown bow. Original groundwater was tS ft below the ground surface due toa ‘severe drought groundwater level dcp down9 ft below the ground surface, what would happen tothe effective stress at pont Awhen groundwater lvl drops down to 9 below round sirface Total deny of sli 110 pf. Gertea effective stresineeasesby 249.6 psf wera effective stress decrees by 249.6 pat vertical eetive stress erases Wy 268.6 pf nochange 11) he aettyon node network shown below describes roc consisting of 8 ass AH. ach node indeates setts duration in wks Al elatonhips are fnh-o-tar. The minimum tne to complet the projets a) 15 weeks by 16 weeks efi woots 4) 18 W00ks 13) beams londe wit unform bad of kos anda concentrated load of 30 kis. Fr the sear fore at point 2) 28 ps 0159 tips a6 pe 4) 52s 4) waste water engineer designe scalar primar sedimentation tank witha detention tine of2 hours height ofthe tankis 5.6. what isthe aneter ofthe tank he flow f1.2 MD? Detention tne vo ehh sere vsfeis oatae aynaan 415) the|terdosiplnay nature of engineering has impliation for appropriateness for speciation which ofthe folowing is coreet? ‘snc al eel engineering projets ae nterdscipinry all enginer should be expert inal lds of enginecing 3) the nterdscintinary nature of enginnesng means that al engineers shuld study genera engineering ater than speciale na single area West engines wl wish to pele bu allergen mst be ableto work flectey nse thes wth complimentary sis 15) 23180,700 w/a 990,700 7002 75,700)" A129, 700 y/o ons 2) alate the reaction 2) 25hips 8) J ks ‘hire @) eo 2} Find the maximum bending moment ofa beam lsd with a uniform oad of kp, anda concentrated ood of 30 788 pte b) Mewiot 6) 29kip 8 B0tipk 43] morderto provide the geomerre standard for ech readway/highway component whats that nee tobe cesgbished fst? Functona assist Trac capacty 6) Road networks 4) Batng deste 4) what loads are considered as onstruction oats? 5), Wind oe, deod weight vod ror constuction workers, earthquake load Wind load dead weet he load from constrton workers, asda to wt concrete ‘Wind oad, dead weet ne ead rom workers, artquake oad {| Wind ond, deadweight Ite oad from workers, seam load Consider steady and unfcm fow in a pismatic chanel. The channels aperolal in coss section, with 2 ‘nse of with tt andsies. the chanel slopes 10 feet overt 0.5 milena, Whereis the velit the sreatestin the channel? 2) Atthoupstream end 1) Ae the downstream end 16} 2 ofthe citance form tepsteeam end 5) _9f hoe oe 6) 100 miaste water sample wae ated with 800 of water nti stobed nygen lvl {00} was found tobe A 8mg. ater daysof ncbaton final dsslved oxygen level (00) was ound tobe 3.9 mah. ‘what the 5 day 80D of thesamole? 1800, (00,~ D0) / Van tion) 2113 ref 98.1 mest fe) amp €) 378A ‘The forward pass in projec setwork calculations deterines the 9) atest tes an act an beat 1) Evert times an actvty an be fished ©) Thelongest time thatthe projet ean ake 4) cial pat ofthe projet ) ABandC areal erect 18) Consider the folowingstaterents Inasinply supported beam subjected to uniformly dstibted oad throughout the length, a which poss ‘the stress oi flere and (i) shear equal to zero secu the stress ae Atsuppor section at neutral re 2. At mid span seton at neutral fire 3. Atmidspansectonatopfre | At support sean at bot be 5. Which ofthe above steam score? Sh hand2 by 2ands 6) Danas 4) tol, 10} inspections ate al called 2) Produc reviews 2) uals ©) Walthroushs ‘A anawer are true 8 11) The activity on node networkshown below describes a project consisting of tasks A. Fach nde indicates acti duration nwees.lvelatonships are nish tot. the minimum inet complete the projects 23} 15 weeks 1) 15 weeks ah 17 weeks 1) 1B weeks 12) Aconcretemichas the follow spectiations Cement content= 60 (56 of cement =3.10) Fine aggregate (0) = 1250 ye? (SG of 0 ne agg 02.65) Water cement ato = 5 gallons pr sak, wt of cement sack= 34 Ib “The yolumeof coareaggrege®requed per CU of concrete ts most meaty sree ») aoe 82m o77e 13) The mam vet shearing stress veo VOYIb in teh ear wth rectangular cross section 8} Occurs where the normal rss maximum AF Oceats at the neural ais ©) Occurs a the outermost ber {te ineary dependent onthe dance rom neutral as 1) Abd manager charge of closed bid in which several fms ar involved, The st dy ofthe bidaing period atvs and one fm har nt yet submited an ene. Bob call them and asks they are goin to submit bi an they sy they have been too busy to wrt proposal but might beable to get one worked ‘uty the eat day. He shoul 2) Open the bis ana reveal the lowes bite encourage the firm to enter Open the bids and quote fale low bso they wil enter but he wl ot ging away the contract Tellthem he cant do anything fr them 1) low te fim to entra be bid 25) Structural ic aqui ta cua a ah ongrade na nar ith a dee rst ine. To avoid oteti problem th frost heave, thebest material fr structure il would be 5) Low pasty caesivesoleompactd dy of optimum {C}) 2») Imeastesit 6) sity sand SBF Wetted snd 16 Increased watercoment rato in concrete mix a Results in decrensed sterth 2b) Reduces wrkaity Decrease hyraton pros 4) Reduce the sump vale 17) Te ratio ofthe maximum oral tress de to maxim vertical shearing stressin a cantilever bean of length (with and laadeda the end i ven by a) Ut ) ayn aim 2b 18) Api foundation shown inthe gure. The ukinate sie resistance, utimate pole resistance 2nd ultimate negative sli toy are gven onthe figure. A sale factor of 2.0 required ont he capacty, ‘the safety factors not applied to downetag forces. Assume thatthe doundrag forces that canbe apled to thetop ofthe ples mast nety 15 b) as 0) 155 310 18) Adtiver rounds a curve ata speed of 60 ml/h and sees atuck vertumed on 2 road way level ahead. 150 fest 2aifeet ) aap eet 4) szoteet 20) Tei and asim vod fe 47 and 08 eget. The spc ry of he solsoks, 6265» drecshen test wa contd on ho forthe test Vedra e062 enw = SM Spotinen sia = 2°" (hgh) Normal ad = 4010 Shearing nad fare S= 20 Thesol iton angle re shear testis about a vrs 9) 40 34 21)Aneconocing pos fea elevations on aap inca 2) Prpetyine ©) Gate! ares ne ©) Qin of eqal ovation toute 22) The process ol dentiyng and evaluating contractors fora bd Uist is ealod \97 Prequalification ) Forecasting 6) Fast tacking 4) None of the above 23) Sol samples extracted forthe standard penetration test (SPT) ena be use in 2) Liquid mitts, ) Sieve analysis @) Hycromoter 9A om shove 24) The eath pressure that ie developed behind 2 retaining structure dopends onthe movement ofthe structure relative tothe sol, The acve earth pressure is developed when ‘) The structure moves tovad the sll ') The stucture does not nove he stucture moves anay from the sll ‘8) The structure andthe si move aay frm each other 25) The main iypes af plastic ovement arcu in conerote are ‘Plastic settement ») Plastic shrinkage ‘Nand amp: 8 3) None of the above 26) The beam shown in teh ft is loaded with a uniform load of 1 kip anda point oad of 8 Kips located at 5 rom the lel end, The location ofthe maximum moment measured form the ight end ismostreaty 3) 50 bas ®) 100 a 27/008 means eS 8) Qatar construction serves Qatar contact standard ‘Qatar construction specications 1) None ofthe above ew? 4) Inoxder to determine whic base hydraulic principles are applicable acasifestion of fow is tneesnalythe flow condition thi the teal eneray head has the flow condition at whi ‘minima value below whic a given discharge cannot occurs tecmed ad oe 2 thru bud emanate AE ti mer pi erinectea education programs: onera 4. Gree rection berween cement and water a 4) The nia investment fora eoject 20 milion QR.A net annual profit of 150000 QR is antiipated. Using 210% desied rate of return on the investment what ithe payback period forthe project? ©) 536 years 099 your 5) The nearest 100 feet? 2) 111,500 \pye10.500 9) 1100.00 +0000, 9 Kilo walt hours és He encts of 2) Potential ference 1) lecic power oF eeevicenergy 6) Electric chage 7) The concrete stres block ta rectangular ross section ie ven below the nominal moment capacity of thels section ie 8) When making dewatering eatin the most ital expect affecting dewatering tne isthe 8) Header pipe diameter ») Radius of influence 6) Capacity ofthe well pent system 87 Sol permesbiity 9) ~~~ lof elatcty dates thatthe extension of a pring iin dict proportion with the load appledtoit 2) Youngs by Roberts stlookes 6) Potsons 40) Engineersare planning to place a shaow foundation as shown Tnqoars ave decided that lose sand and scare not capable of pportng he foundation thot Deng eate. What ste best round med method for this? ay cond mam compaction ttre! sot cy ad conduct resuegrounding to treat loose and 6) conduct dynam empaction toto treat lose sand and conduc urcharging to reat soft ay 6) conduct vir canpacton to teat soft clay and condut presse grouting to treat loose sand ©) Condit presare sroutingto rest at flay and conduct surcharng to est loose sand 11)The figure towsloads eas ating on abeam ‘The shear diagram ts most neatly 12)The earth presaure ‘thats developed behind retaining structure ‘depends.on the ‘aructure relative tothe soil Developed when a) The strveture towardsthe 1) The sructre does not move \0) The structure moves sway fom the si 1) The structure an the soll move away from each other ‘13)Which one ofthe followings atypical dry density for normal welght concrete? 2) 1850 kg/m? b) 1950 kg/m ©) 1900 kan? 972250 kai 14), bid for foundation const sti is based on owner supplied sol boring test eats showing sandy ‘lay to depth of 6 mbackoe encounters large pieces of concrete buried throughout the ‘onstrction ate, This tuation would normally be reter {9 Conceded conditions ») Unexplained features ©) Unexpected characteritice 4) Hidden detriment 16) lis of activites that are required to ‘complete a project is shown below, Assume thatthe early art 5) of aves A,B and (©=0 days and that the lat ish UF) of activity isthe same asactrty 6 9) AB.6R6 ») aa08 9 cone 4 yoke 16) what ity aren or mt rec bas? 91400 ura ») 300MPa ©) 600MPa #1001 17)The use of concordant cabesinpre-stessed continos beams induces 2) na suport reactions {BY Wo li suport reactions 6) Excesercking 6) Excosin defen 18) _ carbon rick smd om cused coke bonded with 2) sulphate 8) carbon acd 6) olay 19) trem fost ack ans 2) Desvbuld 0) Constructon startsbelore the design is complete 6) Cos plusfixed fee d) None of the above 20)A tower crane with a 7000! Counterweight (A) used to pick a load with a15 ft boom extension 1. Pon, Te boon asa weight of 100 Ib shown } Soom ex on fg) The tower wees $3000. Aad the 6 f¢* 6 ft Footing weighs 20000 Ib. Ignoring wind forces, the maximum fad that the crane can ift without overturning is most nearly 9) 75tip 0) ote eae 0) 1524s aripter termi ‘Asuroton Aa acersorcben plato ven nd ‘ego neond d “hema (be pn nme ms ety 9500 22)Consder two beams with equal eross-sections, made ofthe same material having the same support Conditions and each loaded with length . one beam ie wce a ong asthe other. The maximum ening tressin the fonger beam ilaiger bya factor of a) 125 yas 92 28)Soit samples extracted fromthe standard penetration tet (SPT) canbe used as 8) Liquid limit test, b) Sieve analysis 6) Hydhometer tes Na Alof the above 24)A 10-MGO water treatment slant isto be designed with eight identical rectangular claifiers wth Jength to width rato of §:. The canfers wl the clarifies are 16 ft deep with ahrizontal velocity (of 04 ft/min, the dimensions) ofeach clarifier need to be most neariy aA. pre 90-66 ac ao 26) bing wt gabled oo i expienc ree onset dope wich 2) Atwayspostive nF nia negative «) Sometimes postive an otherwise negative 6) ter0 27) main ctv poet ope dtntion isto 2) Setup the meeting on proeet, 3) Analyze the current budget pln c) Meet with team members 4) Select team manors 42) betne the work breakdown structure 28)A 200-f* 106-4 room has een prepared for painting. the wallsare 7 {thigh and wil require to coats of paint onthe previously painted coverage. IT ga of paint covers 300 tthe number of ‘gallons of palnt needed t0 au ta 9 67 aa as 1) omen oss 5h gl oh long tw ne ye t SEEN sve weeds 7094 Ten he oa hl nanos 44 Teeny & pon on acorn. 8) 0252./mt 2) Engineers ae planning to placa salow foundation a shown Engnoers hve decided tat lose sand and sft ay are not capable of support the foundation without bing tented What the best, Condit dynamic compaction o teat soft ay and conduct pressure grouting orest lose sand ) Conde namiccompactn to treat loose sand and conduct surcharging to treat soft ay {Conduct viocompoctionto teat oft clay and conduct pressure grouting to treat ose sand {Conduct pressure grouting to treat ot cla and cont surchargngt teat lose sand 43) Generalconitons and home office overhead are examples of what ype of costs 2) Dect sai Incite ‘Both () sand) 8) Contingency 4) ety withan expected increase ins future population sto provide a complete water treatment plat fore furface water sore, inldng rapid tation ana ehlaration. The design lw ls 2.5 MAD assuming alam Ic used for oapulation he aproximate area of the 2) Ir corest to 10000 jis lest o 200001 ©} depend on the dog ofalum 18) depends on he quality of water source ‘hee etn of cance dat shown tow, te dam is 150m Tog the following materi casts are riven neat S110 per ‘Sssuming 5% wast forall tras, What most neat the cos of materials fo the consrtion ofthe an? ®) 46080, b) sor04s ©) $92.20, wy 119.060 ‘9, Themoisturccntnt of inber usd in bulting frames can be 2) 04% >) $800 12% 260 18% 220% 7) The atc tat govern the weal of rsh concrete we? 1) Thequaaits of cement pte ad aggrepte lative o cach ther ), Theplastcy ofthe paste se ‘The rangof the agwegse «)Theshape nd surface chests ofthe agarpste ©) Allofthe above 8) fering tothe igure, wa ad combination produces the maximum uplift on footing A? 2) Dead Wve b) 008 + wind e) Dead 9 Dead + tive + wind 9} Which ofthe following ia ansideredto be a characteristic of projet? 3} Anestabished obectve | Adler begining and end 6) Complertass go 10) Asthematicofawaste water treatient pants shown, treatment to remove grit frm the wastewater 1) Decremes 800 BY ised to decane mecha fare Involves these of oagultins {2 Cancomet any pontine treatment pin 11) The undained shear strength of day equals 4} Twice the unconfined compressive strength 1), The unconfined compressive strength Ha the unconfined compressive strenath {Not reated tothe unconfined compressive stent 12) n PERT the tine estate of cvs are correspond to 13} Amat foundation willbe plain an excavation to support a building as shown Below, The ant foundation Dead load fmt foundation 00 pst Dead lad of bling wall, clu, loos, root, es 40000 ses Permanent ive lod 1500 ps “The et pressure pt) atthe Leaving elevation ofthe mat most nary 2) 575 by 1100 ors 14) primey sedimentation tas for amunkdpal waster eatent plat rst low of GD and femove 70 perce amet ith Get of 15. The sols fx (s/t. nto basin about a2 ys (Independent of detention ine independent of depth 15) which ofthese a earontostor proc. 2) Problem 2) Market ©) ppornity ‘Alanowers are true 16)the beam theory provides a means of lebting the oad carrying and defltion characterises ofbeans 1) ers -witmer 1) alleo-jaob Spams Eler-Bernous 27) Aso.ate catchment containg cropland converted ota Qatar malta center Which of the followin ‘Statements sre concern the impact on teh uno hyagraph? 21 Je portdeveopment oprah pen wl car sooner than he redevelopment ho raph weak “is pstdevetpment dro raph peak wile her han the predeelpment yo graph ek 2) The area under the postevlopmenthyogrph wl ke peaer than he area under he redevelopment hyo gaphs 4) othe answers 6) None he swe 1 Gonreng a a be doe nol wether wha yet amet not eae? 2) tet 3 ei Type a tev 15 Sono mata ded 2) Themasnum itera tansy the mater the expe oe 3) Conti of mattaltosbsors ra vere Carb of ater tode werk The mm tra etic tee he mates aa detonation 20) Teimmedate-~—- mute compe etre tenet ay ean stati te ct ek 2 cial actts (97 recur aces 4) Sucesor ees 8) oneal he stove 1) Ale te atve 21) obese cl ah compacted wth erin tess of 2) ede Bron soem 5, 1sbem 22} 820° 10am as bes rept fr piting Th wal hha a eee cos of pai onthe reves covers 300% the mm ofatons fat ned oat theese nea a Uta oo os 23) Amun waste rented ah an ated deste ith cc afer pinay ston. The cast tie forthe ‘tert qty 4) Reo 15 enentaton 6) ty rterton time 9) econ ft pinay dr 24) The interdicipnarynature of anes inet forte appropintenes speciation, Which cite toning cect? 2) Shee selene poe a ites llengees shout beeper al el ot corning 0) The iernarynaure of ngering esther shel tty ee her thn oecle «g/t ereer wih suc, at lenges mut be et wort slogie other wh amply 25) as 1} Weaving lang is wed for 3) Stopping ensuatey 1), Accelerating on roadway \\aI” changing postion of veal interchanges ‘)_Spoeing at merchanges| 2) What ote abot monet ane bang? 1) neces amped ob fone sure 2) terete on bad ramets 6) lonmrdetestng canto pecedconpreto sed ame cies \ icy tocnen corpse 43} denty of trafic fond to be 230 veces per mle speed of veicless measored to be 6O mph, Whats the flow orvolime of wae? 2) ys00veh/r ‘anno veh/be 6) 28100 veh 4) 29670 veh/nr 5) nals bit drawings re sited to 2) Gh the atetect mare work 3). Kemp ec for ter mantenanc’ 6) Prepare forltr renovate or aionsy/~ 4) Both aande 16) Cohesion bacfis usually compacted in ayers wth thickness of 2} 100m 50cm 4) 380em 2) tmorder to convert tam mete system en, x mpera pte in st oul you do? 3) Mutipy by 245, 1) pacipy by 2.55, ‘Ohided by 2.54 ‘d) Divided by 244 48) Forthetrus shown teow we the vital method work ta find the folowing (ake E-2506pa[250"20"107 yr) ” 109) 10) 2) 13) When on activity networks ceveloped by using forward and backward pss we canfind out a) Thelongesttime pric tt the project wl take 1b) Themumberoftota sacks that projet managersmight have ©) Themumber a fee slain the network 1) The cartes and latest time that an acy can ish 8} and Bare correct 4 A Band care correct yp ABC and Dare atleonee 1 Ake om i hgh ef he even 2 ee eo ps1 my vo rm 4) 130% 15) na two way sab the Mig lta ofthe slab ous de 2) estan sea fore tt onde |B torsional moments onthe bs ‘Unbalanced mment on: sb 6). Hay shearond tthe msn 16) Atwo stage anaerobic este is used to treat a combine primary and secondary sludge compared to serobi gestion, anerobicdestion 4) Produces more bacterial es 3) Uses mare enerey 1) ts more compext ooperte 17) Aaa Gf 204 wie cancrete block be placed atthe bottom of take au 100% contact with ‘the ate be and uniform load the ake bed and uniform dena of the conerete 150. The resulting contact pressure (y/° wlbe most net 2) 9600 ) 3000 vr eo 4) 350 18) The slab iscesignd as one wa if heaton oflng santo short spans a) tess that 1) Between and 15 1) petwoon 15 and 1.2 (reste than 2 19) Apanmetr recorded the ares erlazed by the 700 ft and 707 grading contours #200" and 3800" respectively The volume by te contour lines s most nearly seal lationship ‘elcontour elevation aference[average end area) Loy Rarer cre nowt 20) Whatisaicher scale? 2) Aseae for meszurg themass ofan object garth sae fr measuring seismic energy of an earthquake “}_ ale for making ange measurement 1) Ascaleused to mesure Iear distances of sutures and other lrg obects 21) which of the folowing an acceptable encuse fr delay or non performance of contract 2) Astras and fabor roubles {pF nat to obtain permitor ense 1) Hardship and inconvnerse 4) Fallre of cndition 22) Forentracting ook samples good quay are we Double tube core bane ‘Single tube core bare «Standard slit spoon sarpler {) Thinwal ube shelby abe) 23) The minimum horton lsrzone with (ft) fot low-speed ral olectorandrralloal roads mosty 2) 24 ») a8 va 24 four lane freeway runs thcugh rua areas Fach lane i 38 wide, 9 ecet li stud for parte Postion ofthe daly commute period shows directional weekday volume 240 ph none rection. An ‘verageof750pstes by rh the buset 15min, what factor (PHF)? wef lationship: PHF =H 3) 031 ‘080 ) 4 9 10 25) na yp of ranean on vs pec ine tat feng pt teton prone theese ey wa open cee? 2) row cert poperioaconele 2) mime wth proper omar 8) ores mtr pop eer i hostname 26) The are defiritonfthe degre of curve (0) s defined the ‘Contra ange subtended Wy 100 fare 1) central angle subtended by 100 of chord 1) Contra angle subtended ty SO of chord 4) Total arc length ofthe curen tation vided bythe otal central angl of degrees 27 tn theactivty on atow netwarwith durations show, based on endo ay calculations or starts and fishes, the ear staf acti Wf most nest bat a) Pefre the development of any sit, construction companies work onsite set-up t0 Selest One: ‘-A-accesshiy dng constuction and fi) and storage (consteton ‘aipement andmateia) | © By services (omer, cletisiy, drainage) - Gosafety, ams; security during construction (Fences, no- ‘wespassing) A Peston regrets ouding esto won planning consent (protect re, archaeologlcal digs ete) © Boallthe above 1. The ‘beam theory provides a means of caleulatng the load — carrying and defcction characteristics of beams Select One: A. Fees witner © BGaleo- jacob © ©. Leonard» aki tite 2. Ifthe elevation ofa level instrament is 106.5 ground when the rod reading is 6:22" Sela One prtinasim © nasi ‘what i the elevation of the © 10557 © x07 13. Find the total feat of activity D forthe project. Select one: CAL coo op2 4. Caleulate the monent Ma, Select One: © A.25 fikips Aa 358s © C5 ks © D210 5. A mat foundation wil be placed in an excavation to support a building as shows, below. The mat foundation dimensions are 100 ft = 200 The building load are 23 follows: Dead load of mat foundation 400 pst ‘Dead load of build ng walls, columns, foot, roof, et. 40,000 kips Permanent live loa 1,500 Kips “The not procure (peat the bearing elevation ofthe mat most neatly Select One: cass © B.L100 ec.1g7s 7.2475 From among the flowing etivifies which the best example of prose? Selot one © A processing furan chins © B pnoduckg tonnes ©, wii ne ebook on projet mmagment 6 comping cogs deer © £ allofties ae pod examples of projets 1A major flood hes resulted in contamination of hundreds of domestic water wells tnd the distibution system ofa smal town, The pH should! be controlled to less than 7 because: Seleet One: © A. treduces be grwoth of vines nae pH ofles than 7 wit kil bacteria © C. The chore wil be inthe CP. oem primarily 1 The chlorine wi be intbe HOC form pinay 8. What is he Iengh of the Are forthe following curve? Radius 250,00" ‘Tangent nN 25° 30° E Tangent out 830° 25° Select One can whaas ec.1073 ©p21450 9. What ype of cement is known as general purpose cement? Sel Type | © B Type ©. Type ttt © D-type Vv 10, Detinestors are tebe placed on the ouside ofa horizontal roadway curve of 5° ‘The approximate spacing (8) fr the delinators along the curve is most neatly Select One cA50 cB ess 6.10 11, Consider two beams with equal cross-setions, made ofthe same material having the same support conditions, and each loaded with equal uniform oad pe length (One beam is twice as long as the other. The maximum bending stress in the longer ‘beam is anger by a fator of Select One: Calas emis cor Oa 12 Primary later (Primary sedimentation tnk) whieh has a diameter of 40 and abeightof 8 fl. eecives 0.7 MGD of wastewater, What is the retention ime the clavifier? Select One CAL8 es pptisne C381 es 5067s 13, Which one ofthe following represents an activity. Select One © A. excavation foundation © B.cuming of concrete 14, tf the VPC is at Staion 00+ 00.00 with an elevation of 176.20 ft the height of fill, required above the culver is: Seleet One: © A308, 1.4908, cc.3708 Patan 45 15, A 16.f1 40-1 dal media drinking water fiers to be cleaned using an ait wash followed by a water wash. The ae wash isa arate of Sse? The recommeded nifow rate (Sti) forthe ae wash is lexton.£> 3000 D980 16, When an aetvityis developed by using forward and backward pass we ean find out: Selet One: © A.The longest ine pio that the proest wl ake. © By The rumberof ttl slacks that projet managers might have © C. The mumberof five sc inthe network © D. The eatest an test time that an activity an ish © Eon And Bare comect © Fy only A,B, ard Care comect G.A,B,C and D ave all correct 17 For the trss shown below, the member force (kps) in member CD is most nearly. Selees One: 5 (compression) © B.96.5 (ersion) © OpfinButon © OptonBuston?? 18, Atwo-stage anaerobic digester is used to teat a combined primary and secondary ‘sludge, Comparec to aerobic digestion, anaerobic digestion: Select One © A. produces mre bacterial cols © Buses more erersy PC sone epee © sme cams tw oente 19nd he detente nl ft low etna ston own, Outside {ncn ofthe action 1212 nce and he kes 025 ines. The Younes mot fel» 10 Y= wLA/OBE, Y=PLA/BEL 1=207.123 int Select One: ‘0.149 in CB 13a © C0453 in © D.L6Tin +20. The seseration rte (K.) ofa stream that is narrow and deep would be expected 40 be Select One A. fete ath estan 6G, te same Duell to © Bs te same but sometines Bess than 21. General cnditcns and home office overhead are examples of what typeof costs? Select one A Dire 9 nt © C.Bom aan © D.contnesnes 22. For the beam loaed as shown inthe igure below, the being moment a x~ Sf fiom the lef suppor is most nearly: Select one CA 160 kit xine C236 kip © D.250 kip 23, The backward passin projet network calcultions determines the: Select one: A test times ative ean ben © B cates times actvis can be fined © C. etc path 2 Boonty A and Cate comet © E.A,B, and Care allconect 24, A concrete mix ha the following specifications: Cement content= 60 Thi? (SG of cement ~ 3.10) ine ageregate ($80) ~ 1250 hye (SG of SSD fine ager. ‘Water eementrati>~5 gallons por sack, We. of cement sek = Air content6 ‘The volume of couse aggregate required per cu. Yd of conercte is most nearly 65) i. Selpe one: ‘29.718, cR86n cos2 ms e778 25, Claysh substance is Selet one © A. Feelin feria for road construction © B. Added materia rood ges \E- Bad substance fr road constrstion © D. Good mmterl ir road constuction 26, A rectangular open channel has a rough concrete fining (n= 0.017) and conveys & discharge of 22.01, Ifthe channel bottom slope is 001, then the hydraulially most efficent erss-sctionsl dimensions including 0.5 m freeboard, are: Select one: © A. 1.5 mbigh end 3.0 mwide © B20 mbigh an 3.5 mile \6°E. 2.0 mhigh end 3.0 m wide © D.3.0 mbigh end 2.0 mide NN 1 Consider the fllosvng tatements: ‘a. PERT iesetivity- oriented ae adopts deterministic pproseh, b. CPMis event-crcated and adopts probabilistic approach, ‘6. PERT is event-orknted and adopts probabilistic approach. Which ofthe above sttements isfare correct? Select one: © aL only bland 2 © 6,2and3 eBoy ‘An existing road in very good condition isto he overlain due to increased traffic. The required structural nunber forthe road with overlay is 34. Layer coelicients ofthe ‘materials are as fllows 4in of existing asphalt concrete 0.4 Bin of existing aggrevate base course 0.1 ‘Overlay asphaltic conerete 042 “The rquired overlay thickness (in. is most nearly Select one: cals oben 2-4 cons cas “The total material quired or an embankment is 100,000 CCY. The borrow material sill be obtained fom apt that has aswell factor of 20% and a shrinkage factor of 13% How mach material must be excavated? Select one © A.115,000 CY sof ineurcy 6c. 129.000C¥ © D.125,000C¥ 4. ‘The advantage in using plywood is thatthe Sele ote PA Tes stones guna sins Bie ese tng ane deen © lhe ten stg inshore dkeibn © Lower ese tng a nsdn 5 Refetng ths loa us shown nthe. h Fre (ps) in member AB i Salot one © A100 compression 8.125 compression © €.167 eon 9.167 compen 6. TInorder to provide th proper goomettie stndard for exch roadway/highway ‘component, what i ital needs to be established first? re wetional clsieation © BL Tra capacity © C. Road networks © D. ing desis 7. Por he trass shown below, use the virtual work method to find the following: (Hake 1B=250Gpa (250 * IC Nin*} and A380 mor for all members) ‘If mo loads act onthe truss and member AB is 3 mm short. Then the horizontal Aisplacemeat of joint Select one: CA B0nm \P.4€3.0 mm, ©€.460nm © D.46.0mm, 8, Which ofthese a reason to start projec. Select one: © a, Problem © b. Market © ©. Oppornnty Ab Manse are te 9. "The purpose of euing is Select one: © A. To ensure that thre s enough water inthe concrete dng deyration ‘- BT ener th is water etn so th the chem reaction coties wl he conerete has thoroughly hardene al strength s developed

You might also like