Room Temperature Report

Project : :
Date of Test :
Floor :
Unit No. :
Unit Location :
Equipment Designation
Drawing No. :
Time : AM/PM
Design Temperature : WB / DB (Deg C)
: RH (%)
FIELD MEASUREMENT
Measured Temperature
(Deg C) Relativity Humidity
Points No. Remarks
(%)
WB DB

Point 1
Point 2
Point 3
Point 4
Point 5
Point 6
Point 7
Point 8
Point 9
Point 10

ACCEPTED RE-INSPECTION REQUIRED

ACCEPTED WITH COMMENTS NOT ACCEPTED

REMARKS / COMMENTS

Installed & Tested By :


XXXXXXX Ltd (Name & Signature) (Date & Time)

Witnessed & Checked By :


(Main-con) (Name & Signature) (Date & Time)

Witnessed & Accepted By :


(M&E RTO/ R.E) (Name & Signature) (Date & Time)

Page 1 Rm Temp-14