T&C Form No.

20

FIELD TEST REPORT


Pump Alignment
Project : :
Date of Test :
Unit Designation :
Unit Location :
Sty & Area Served :
Unit Model :
Serial No. :

ACCEPTED RE-INSPECTION REQUIRED

ACCEPTED WITH COMMENTS NOT ACCEPTED

REMARKS / COMMENTS

Installed & Tested By :


XXXXXXX Ltd (Name & Signature) (Date & Time)

Witnessed & Checked By :


(Main-con) (Name & Signature) (Date & Time)

Witnessed & Accepted By :


(M&E RTO/ R.E) (Name & Signature) (Date & Time)

Page 1 PUMP ALI-20