\ OFFICE OF THE CHIEF ENGINEER,
1 (E-mail ig NOR/RRIGATION, ODISHA, BHUBANESWAR
ail |&- cemi.odisha@gmail.com, Telephone ve Ve 2901 525)
Lettte - -
at Noe ea CS vate (0529
{ WALPMKSY ~SMl-t8/2022
To
‘The Executive Engineer,
K. MLL. Division,
Phulbani.
Sub: Submission of S& | data for preparation of design and drawing of new Minor
'eigation Project of Nanimunda MP (DAW)
Ref, Lotter No.624 (WE) dated 08.04 2022 of SE, $.ML. Cirle, Berhampur.
Sir,
In inviting a reference to the letter and subject cited above, it isto intimate that
during scrutiny of Sil Data, the following observations are made which needs immmadinns
‘compliance through concemed field offices (A.E./J.E.).
01. C/S of nallah showing bank clearly to be furnished.
02.Colour Index Map showing Location of proposed DW, catchment and ayacut
may be furnished
03. Axis of the proposed DW may be marked in vilage sheet duly signed by the
‘concern E.E/S.E.
04,Details of any Bridge, Cross Drainage Structure in the U/S and DIS of the
existing site as per Checklist have not been submitted.
05. Soil testing data of embankment need to be submitted in the data sheet
08. The highest ayacut level has not been reflected properly which almost coincides
with bank level. Hence correct ayacut level from the axis of the DIW may be
furnished through a responsible office for finalization of the design, All the Si
data must be signed by the concerned E.€.
This may be treated as most urgent
Yours faithfully,
Bocas yar
Superintending Engheer (Designs)
: Ot.
Memo No 859m
forwarded to the Superintending Engineer, SMI. Circle, Berhampur for
Copy
: ‘and necessary action
information iS dig
Superintending Engineet (Designs)