You are on page 1of 1

PANJANG PAGAR HARGA/ LEMBAR TOTAL HARGA

NO JENIS PEKERJAAN DIMENSI/ LEMBAR KEBUTUHAN JUMLAH LAPIS TOTAL KEBUTUHAN BAHAN
M¹ (RP) (RP)
1 PANEL 310.00 2.40 129.17 5.00 645.83 Rp120,000.00 Rp77,500,000.00
2 KOLOM 310.00 2.75 156.00 156.00 Rp296,500.00 Rp46,254,000.00
3 SLOOF 310.00 0.11 34.88 Rp2,250,000.00 Rp78,468,750.00
4 PONDASI BATU KALI 310.00 0.48 148.80 Rp675,000.00 Rp100,440,000.00
5 ANSTAMPENG 310.00 0.20 62.00 Rp675,000.00 Rp41,850,000.00
6 PASIR URUG 310.00 0.05 15.50 Rp195,000.00 Rp3,022,500.00
7 GALIAN TANAH 310.00 0.90 279.00 Rp95,000.00 Rp26,505,000.00
8 URUGAN TANAH KEMBALI 310.00 93.00 Rp95,000.00 Rp8,835,000.00
Rp382,875,250.00

You might also like