You are on page 1of 1

0.

250mm Backfilling With


Graded Filter Material
Backfilling With
comment Material

5
5.5
32mm Ø HDP Pipe @
2000mm C/C V&H
KM:18+760 to 18+770

8.727 1 8.727
3
3.2

5
RCC Area-3.250m2

5.5

5.5
Cut Area-13.931m2
PCC Area-0.320m2
Filter Material-10.240m2

0.5
0.1m PCC
10
ELEVATION OF CANTILEVER BREAST WALL

0.3

250mm Backfilling With


Graded Filter Material
Backfilling With
comment Material
5
5.5

8.5 1 8.5

3
3.2

RCC Area-3.250m2
Cut Area-13.931m2
PCC Area-0.320m2
Filter Material-10.240m2

Note:
1.All dimensions are in m unless noted otherwise.
2.This drawing are used in RCC Breast wall construction.

EMPLOYER: CONSULTANT: CONTRACTOR: PROJECT: SASEC Mugling–Pokhara Highway Improvement Phase-I Designed By : SCALE As shown
Government of Nepal Project – (SMPHIP) RCC Breast
Renardet S.A., Switzerland Checked By : DATE: Mar.2022
Ministry of Physical Infrastructure and Transport China Communications Construction Company Ltd. ADB Loan No. 3846 NEP wall details
in association with Mugling – Anbukhaireni – Pokhara Road (Section-1)
Department of Roads Km-18+760-Km-19+020 Verified By : DRG NO :
Soil Test (P) Ltd., Nepal and
Project Directorate (ADB)
CEMAT Consultants (P) Ltd., Nepal
(C.C.C.C) Contract No: SMHIP/OCB/MAP/01
Bishalnagar, Kathmandu, Nepal (Km 8+250 to Km 49+700) Approved By : SHEET NO :