A STANDING LOAD Qty X Amp/Qty = Amp

1 Master Control 1 0.0500 0.0500


2 Fire Brigade Unit 1 0.0050 0.0050
3 Zone Unit 2 0.0060 0.0120
4 Flashing Light 1 0.0060 0.0060
5 Smoke Detector 2 0.0001 0.0002
6 Heat Detector 2 0.0001 0.0002
7 Fibreglass Curtain Actuator 2 0.0000 0.0000

Total Standing Load = A(1+2+3+4+5+6+7) 0.0734

B ALARM LOAD Qty X Amp/Qty = Amp

1 Master Control 1 0.0650 0.0650


2 Fire Brigade Unit 1 0.0200 0.0200
3 Zone Unit 2 0.0600 0.1200
4 Alarm Bell 1 0.0300 0.0300
5 Flashing Light 1 0.0600 0.0600
6 Smoke Detector 2 0.0550 0.1100
7 Heat Detector 2 0.0600 0.1200
8 Fibreglass Curtain Actuator 2 0.1500 0.3000
9 Ventilation Fan Tripping 1 0.1500 0.1500

Total Alarm Load = B(1+2+3+4+5+6+7+8+9) 0.9750

C BATTERY CAPACITY Amp X Hours = AH

1 Standing Load 0.0734 72 5.2848


2 Alarm Load 0.9750 1 0.9750

Total Ampere-Hours Standing Load + Alarm Load 6.2598

Safety Factor - 20% Total Ampere Hours+(Total Ampere Hours x 20%) 7.5118

Minimum Battery Capacity Recommended is 8 AH x 24 V

d:/dwg/2013/jc1300-wentel block b/wentel-bb-ff-cal.xls CO2P/1


Jolim Consultant Co2 System
Revision 0

BATTERY CALCULATON FOR CO2 CONTROL PANEL

PROJECT :

BOMBA FILE NO. : Date :

d:/dwg/2013/jc1300-wentel block b/wentel-bb-ff-cal.xls CO2P/2

You might also like