You are on page 1of 27

AL-RAKAH

FIRE STATION

• CASE STUDY.
• SITE INVENTORY & ANALYSIS.
• DIFFERENT IDEAS FOR THE CONCEPT.
• DEVELOPING THE DESIGN.
• FINISHING THE DESIGN & FINAL SUBMISSION .
CASE STUDY
ABOUT

ALJISR NEIGHBORHOOD FIRE STATION


LOCATION

N
Residential
An empty Residential buildings
piece of land
buildings
Residential buildings N

Fire Residential buildings


Clinic
An empty station
piece of land Parking

An empty piece
of land

THE SITE
70m
N

75m
Plot Size
5250m 2
Entrances
Gate at the back

The entrance to the


administration building

Entrances and exits of


fire trucks to and from
the garage
Function
Electricity inside and
outside
room
N
Maintenance Workshop
Guar
d

Training Space inside the station about


Tower Space inside the station 2250m2
Maintenance about 350m2
Employees
Parking
Vehicles parking about
1200m2
Garage of fire trucks
Services about 300m2
Contains 14 trucks
Administration and offices
about 400m2

Security and tools room


about 250m2
Maintenance Workshop building
Separate from the administration building and truck garage
And its area about 350m2
Users and Members
Rank number
1
37
3
2
6
10


SHEETS OF DRAWING
(FIRST REVIEW)
SITE INVENTORY

&

SITE ANALYSIS
IDEAS FOR THE CONCEPT
IDEAS FOR THE CONCEPT
(SECOND REVIEW)
DEVELOPING THE CONCEPT & IMPROVING THE DESIGN
DEVELOPING THE DESIGN
(MID-RERM REVIEW)
DEVELOPING THE DESIGN
DEALING WITH STRUCTURAL AND DESIGNING FAADES
FINAL JURY
FINAL JURY MODEL
FINAL SUBMASSION
FINAL SUBMISSION MODEL
Thank you for listening

STUDEN : SADEQ AL-SALAMI

You might also like