Kel aes
KEl Industries Limited crea
‘aparece mean
Registered and Corporate Office: 0-90, Okhia industrial Area Paso-1, Now Deli-110020 CIN L749980L 1982PLC051827
Tek 011-26818840/8642/0242, Fax: 26817225, 26811959 E-mal:epcke-nd.com Website: wwa/kel-ind.com
Ref: - KEI-EPC/PGCIL/ARP-SS-04/2019-20/233 Date: -23/11/2020
To,
‘The Executive Director (Engineering)
Power Grid Corporation of India Limited,
Saudamini, Plot No.-2, Sector-29,
Gurgaon (Haryana) - 122001.
Kind attention: Sh. R.N.Singh
Subject: Re-amendment of Quantity of Erection hardware for 33Kv layout (Bus scheme as per SLD)-
Transformer bay as per TS against Package ARP-SSO4 including Transformers for i) Changlang $/s, i)
Jairampur S/s ii) Khonsa S/s iv Miao S/s associated with Comprehensive Scheme for Strengthening of
‘Transmission & Distribution System in NER & Sikkim: Intra-State: Arunachal Pradesh.
Reference
1. Tender Specification No.: CC-CS/165-NER/SS-3318/3/G10
2. NOA Ref. No.: CC-CS/165-NER/SS-3318/3/G10/NOA-II/7098 DT: 09.12.16
3. Tender document GA of electrical layout plan Dwe.no .C/ENGG/NER/ARP/MIAO/GA 01.
4,PGCIL Letter RefNo:C-ENG-NER-ARP-SS-04/QTY/VARIATION/03 DT:21.09,2020,
5.KEI Letter No: KEI-EPC/PGCIL/ARP-SS-04/2019-20/229 Dated 24.09,2020.
6. KEI Letter No: KEI-EPC/PGCIL/ARP-SS-04/2019-20/230 Dated 22.10.2020
7. PGCIL Email dt-22.10.2020 of Sh. S.J Lahiri- GM (ENG.)
8. KEI letter no. KEI-EPC/PGCIL/ARP 5S-04/2019-20/231 Dated 28.10.2020
9. PGCIL letter ref: CC-ENG-NER-COMPSCH- ARP-SS-04 PG/CLARIFICATION DT.29.10.2020
110.KE! letter no, KEL-EPC/PGCIL/ARP SS-04/2019-20/232 Dated 03.11.2020
Dear Sir,
1.0 KEI isin receipt of email dated 22.10.2020 from Sh. S.J. Lahiti- GM (ENGG.), in response to our letter
of even reference dated 28.10.2020 & dated 22.10.2020, addressed to your good self on the above
referred subject. In the aforesaid email, Power Grid has given reference to Clause No. 6.3, and
clatification mentioned in PGCIL letter on dated 29.10.2020 and_has specifically reproduced the
following:
For erection hardware items, Bidders shall estimate the total req
module-wise (bay wise)
sment of the works an
dicate
2.0 In this connection, KEI once again submits that for erection hardware item, we have estimated the
requirements module wise.
|n addition, itis confirmed that KEI submitted the bid on estimating lot wise requirement of erection
hardware fitting as one single phase transformer for one set of Erection hardware for the 33Kv
layout (Bus scheme as per SLD) ~ Transformer bay item.
3.0 In view of above, Power Grid cannot unilaterally change from 3 set to 1 set which is not in line with
Clause No. 6.3 quoted above & PGCIL letter on dated 29.10.2020.
4.0 Due to unilateral interpretation of no. of sets of Hardware Fittings of 33KV Layout made by
POWERGRID now, KEI is losing Rs.56,99,234/- (14,24,808.00 X 4) on overall basis for four substations
‘against ARP SSO4 package. We are unable to bear such a huge loss in a very difficult contract like this
for Arunachal Pradesh. &
jhe
Wi SGT RICO ara PV ns OR Ar 5070, Ratan Ta TAR 2001062277 Fac 21 TE wa DvaBOR om
Worcit 9/27, Nochutan esti Ete, altel, Sassa-306220, DEN H. Teh 0260-268420472690044 Fa 2645806 E-mat shsaOha-n.com
Worl: 280.284 FICO nds Aca Chopun) Ost. Ava, Ratan aOTOT® Te 01495-26020206 Fax: 260205 E-mat cheparki-ecom
Marketing Oe: Niven Capone, 7 Fou, Oppaste Agha Naga, Pump Reso, erate tl Rod, Achore) Mumba C0083 Te: 022-2299673,
28373682 Fx 2625827 E-ra mubaiaketnd.cxmKEl Industries Limited
CONTINUATION SHEET
We, therefore, request you to kindly advise the concerned officials not to change the contract BOQ
without change of scope of work by a different interpretation unilaterally.
‘Thanking you and assuring you our best services all the times.
For KELIndustries Limited
Se
Vice President
Copy for kind information to:
1. ED COMP (T&D),NER, Itanagar- Sh.B.S Jha
2. ED Contract & Services ~ Sh. Atul Trivedi
Power Grid Corporation of India Limited,
, Sector-29,
Saudamini, Plot No.-
Gurgaon (Haryana) - 122001
3. Director (Projects)-Sh. Abhay Choudhary
Power Grid Corporation of India Limited,
, Sector-29,
Saudamini, Plot No.
Gurgaon (Haryana) - 122001.