1.1 Purpose
The purpose of this document is to define the list of piping lines and equipment which shall be
applied by Chemical cleaning and/ or Oil flushing in SVDN Project.
The Chemical cleaning & Oil flushing Line List is developed from project specification and
mainly used in conjunction with Chemical cleaning & Oil flushing procedure to manage/ monitor
all required piping lines and equipment are cleaned in a safety manner.
The Chemical cleaning & Oil flushing method, cleaning acceptance criteria and any special
preservation are included in Chemical cleaning & Oil flushing procedure which shall be consistent
with this document.
Chemical cleaning and oil flushing for piping lines as per project requirement, are fabricated by
PTSC M&C, shall be performed by PTSC M&C or PTSC M&C’s subcontractor.
Chemical cleaning and oil flushing of internal Vendor’s packages and equipment are completed at
Vendor’s site. Just in case losing of preservation or contamination after package transportation,
they shall be repaired at PTSC M&C’s site.
Chemical cleaning and oil flushing shall be maximum completed at onshore. The HUC spools
which cannot be completed Chemical cleaning and(or) Oil flushing at onshore, or in case losing of
preservation or contamination after transportation, shall be repaired at offshore.
2. REFERENCE
3. ABBREVIATIONS
4. DEFINITIONS
Chemical cleaning The special cleaning method is used to remove mill scale, dirt, greases
used as rust preventatives, and other foreign materials that could result
in operating and fabrication which often cause damage to
reciprocating and rotating equipment and corrosion due to the reaction
of scale with the process environment.
Oil Flushing The special cleaning method is used to clean Lubricating, seal and
control oil systems in lieu of water. Flushing oil shall be circulated
until the pipe work or equipment run clean.
5. PROJECT REQUIREMENT
Chemical cleaning and oil flushing requirement are referred to the document 05-1_EPC-GE-PTC-
L-SA-00001 Specification for Piping Fabrication which is applied for all critical piping are
fabricated by PTSC M&C.
Hydraulic control tubing cleanliness is referred to the document 05-1_EPC-SV-AEI-I-SA-00002
Specification - WHCP & Hydraulic Power Unit (HPU) which is applied for all critical tubing
are fabricated by PTSC M&C.
The oil flushing for tubing which have connection with the piping system to be referred to Vendor
requirement.
Other than the requirements as mentioned in the above specifications, chemical cleaning/oil
flushing shall be applied if required by Vendor in order not affect to the performance of package.
6. CHEMICAL CLEANING
6.1 General information
The pickling for external piping surface and weld joints is not covered in this document.
In SVDN project, chemical cleaning is applied for following systems with battery limit as sections
below:
Gas Compression system
LP/MP Gas Compression system
Seal gas system
Lube oil system
As per document no. 05-1_EPC-GE-PTC-L-SA-00001 Specification for Piping Fabrication,
chemical cleaning is not applicable for Diesel System and Fuel Gas System. However, as subjected
to the specific vendor's requirement, the piping between Fuel Gas/Diesel Filter and Turbine shall
be applied the chemical cleaning.
The chemical cleaning process is required for piping lines from GTC suction scrubber to GTC.
10”-PV-23-L-0028-DD00A (SV Booster Gas Compressor SV-23-KA-002A (Train A)).
10”-PV-23-L-0192-DD00A (SV Booster Gas Compressor SV-23-KA-002B (Train B)).
Title: Chemical Cleaning & Oil Flushing Scope of Supply Rev.: Date: Page:
Doc. No.: 05-1_EPC-SV-PTC-3-LA-00181 D2 27-Feb-2019 7 of 13
The LP & MP Gas Compression is completed fabrication and FAT in package SVDN-CPP-M-
0017-Flash Gas Compressor by Vendor at their manufacture site.
Chemical cleaning shall not be re-applied at PTSC M&C yard, except any damage during
equipment transportation which effect to the chemical cleaning result of Vendor package.
Seal gas packages are included and shipped with the GTC packages. Chemical cleaning for seal
gas packages is conducted by Vendor at their manufacture site and not require to re-apply at PTSC
M&C yard.
Lube Oil systems of GTC and GTG are required to perform oil flushing only. However, to reduce
flushing duration, chemical cleaning is used to remove all scale, dirt, greases during fabrication,
then oil flushing are performed subsequently (only applied for associated pipes which are
fabricated at PTSC M&C Site). Ship loose equipment will not be chemically cleaned, only oil
flushing will be applied as section 7.2.
The following lines shall be applied chemical cleaning:
Lube oil system of GTC:
4”-OL-23-0008-AS00A: Lube oil supply to Lube oil cooler (train A)
4”-OL-23-0002-AS00A: Lube oil return from Lube oil cooler to compressor
package (train A)
2”-OL-23-0001-AS00A: Lube oil cooler vent (train A)
8”-VA-23-L-0024-AC30A: Vent of Lube oil tank (before Lube oil mist separator)
(train A)
8”-VA-23-L-0022-AC30A: Vent of Lube oil tank (after Lube oil mist separator)
(train A)
Title: Chemical Cleaning & Oil Flushing Scope of Supply Rev.: Date: Page:
Doc. No.: 05-1_EPC-SV-PTC-3-LA-00181 D2 27-Feb-2019 8 of 13
Only the piping between Fuel Gas/ Diesel Filter and Turbine shall be applied the chemical
cleaning.
3"-GF-45-L-0223-BD00A-01(40)(Y): GTC train A
3"-GF-45-L-0224-BD00A-01(40)(Y): GTC train B
3"-GF-45-L-0022-BD02A-01(40)(Y): GTG train A
2"-GF-45-L-0026-BD02A-01(25)(Y): GTG train A
2"-OF-62-L-0023-AC10A: GTG train A
3"-GF-45-L-0025-BD02A-01(40)(Y): GTG train B
2"-GF-45-L-0047-BD02A-01(25)(Y): GTG train B
Title: Chemical Cleaning & Oil Flushing Scope of Supply Rev.: Date: Page:
Doc. No.: 05-1_EPC-SV-PTC-3-LA-00181 D2 27-Feb-2019 9 of 13
In SVDN project, Oil flushing is applied for following systems with battery limit as sections
below:
Piping of GTC’s Lube oil system
Piping of GTG’s Lube oil system
Wellhead control system (hydraulic tubing)
Jacket’s flooding control system (hydraulic tubing)
Hydraulic system for Life boat and work boat davit’s winch
Lube oil system of GTC, GTG and LP & MP Gas Compressor packages are performed oil flushing
by Vendor at their manufacture site before conducting FAT and shall not be required to re-flush at
PTSC M&C site.
For package ship-loose items, only GTC and GTG’s Lube oil cooler shall be performed oil
flushing at PTSC M&C site, combined with interconnection piping which are fabricated by PTSC
M&C.
Lube oil system for GTC:
4”-OL-23-0008-AS00A: lube oil supply to lube oil cooler (train A)
4”-OL-23-0002-AS00A: lube oil return from lube oil cooler to compressor
package (train A)
2”-OL-23-0001-AS00A: lube oil cooler vent (train A)
Lube oil cooler SV-23-HC-004A (train A)
4”-OL-23-0003-AS00A: lube oil supply to lube oil cooler (train B)
4”-OL-23-0005-AS00A: lube oil return from lube oil cooler to compressor
package (train B)
2”-OL-23-0006-AS00A: lube oil cooler vent (train B)
Lube oil cooler SV-23-HC-004B (train B)
Lube oil system interconnection pipe spools from Gas turbine to Compressor to be
re-applied at PTSC MC site subject to confirmation from the vendors
Lube oil system for GTG:
2”-OL-80-0003-AS00A: lube oil supply to lube oil cooler (train A)
2”-OL-80-0002-AS00A: lube oil return from lube oil cooler to turbine generator
package (train A)
Title: Chemical Cleaning & Oil Flushing Scope of Supply Rev.: Date: Page:
Doc. No.: 05-1_EPC-SV-PTC-3-LA-00181
D2 27-Feb-2019
10 of
13
Wellhead Control Panel (WHCP) and all components itself are performed oil flushing by Vendor
at their manufacture site. Tubing distribution from WHCP to SCSSV, PWV, PMV of 05 wells
(well slot 05/06/10/11/12) are fabricated and flushed by PTSC M&C
Refer to Appendix 2 for mark-up drawings (Wellhead Control System).
7.4 Jacket Flooding Control System, Pile Grippers and Hydraulic Shackles (performed by SV
Jacket Fabrication Sub-Contractor)
Oil flushing will be applied to the following systems where required by vendor:
- Hydraulic tubing distribution in the flooding control system.
- Hydraulic line from control station to Skirt pile Gripper.
- Shackle hydraulic lines.
Refer to Appendix 2 for mark-up drawings (Jacket Flooding Control System).
7.5 Hydraulic system for Life boat and Work boat davit’s winch
All tubing in Hydraulic system for Life boat and Work boat davit’s winch which are fabricated by
PTSC M&C and then performed Oil Flushing
Title: Chemical Cleaning & Oil Flushing Scope of Supply Rev.: Date: Page:
Doc. No.: 05-1_EPC-SV-PTC-3-LA-00181
D2 27-Feb-2019
11 of
13
Refer to Appendix 2 for mark-up drawings (Hydraulic system for Life boat and Work boat davit’s
winch).
8. APPENDICES
Appendix 1 – Chemical Cleaning Line List Summary and Drawings Mark-up.
Appendix 2 – Oil Flushing Line List Summary and Drawings Mark-up.
Title: Chemical Cleaning & Oil Flushing Scope of Supply Rev.: Date: Page:
Doc. No.: 05-1_EPC-SV-PTC-3-LA-00181
D2 27-Feb-2019
12 of
13
13 OL-23-0001 2" OL 23 0001 AS00A 05-1_EPC-SV-AEI-P-XX-23019 1 OF 1 SV-23-HC-004A LUBE OIL COOLER SV-23-KZ-001A 0.045518697
14 OL-23-0002 4" OL 23 0002 AS00A 05-1_EPC-SV-AEI-P-XX-23019 1 OF 1 SV-23-HC-004A LUBE OIL COOLER SV-23-KZ-001A 0.123466806
19 OL-23-0005 4" OL 23 0005 AS00A 05-1_EPC-SV-AEI-P-XX-23022 1 OF 1 SV-23-HC-004B LUBE OIL COOLER SV-23-KZ-001B 0.265565789
20 OL-23-0006 2" OL 23 0006 AS00A 05-1_EPC-SV-AEI-P-XX-23022 1 OF 1 SV-23-HC-004B LUBE OIL COOLER SV-23-KZ-001B 0.057895997
Page 1 of 2
SAO VANG AND DAI NGUYET DEVELOPMENT PROJECT
CHEMICAL CLEANING LINE LIST SUMMARY
Rev: D2
Date: 28-Feb-2019
Product
Seq. Piping
No. Line no. Pipe Size Service System Code P&ID Number From To Volume (m3) Remark
Number Class
Code
Page 2 of 2
Chemical Cleaning
Chemical Cleaning
Chemical Cleaning
Chemical Cleaning
Chemical Cleaning
Chemical Cleaning
Chemical Cleaning
Chemical Cleaning
Chemical Cleaning
Chemical Cleaning
Chemical Cleaning
Chemical Cleaning
Chemical Cleaning
Chemical Cleaning
Chemical Cleaning
Chemical Cleaning
Chemical Cleaning
Chemical Cleaning
Chemical Cleaning
Chemical Cleaning
Chemical Cleaning
Chemical Cleaning
Chemical Cleaning
Chemical Cleaning
Chemical Cleaning
Chemical Cleaning
Chemical Cleaning
Chemical Cleaning
Chemical Cleaning
Chemical Cleaning
Chemical Cleaning
Chemical Cleaning
Chemical Cleaning
Chemical Cleaning
Chemical Cleaning
Chemical Cleaning
Chemical Cleaning
Chemical Cleaning
Chemical Cleaning
Chemical Cleaning
Chemical Cleaning Chemical Cleaning
Title: Chemical Cleaning & Oil Flushing Scope of Supply Rev.: Date: Page:
Doc. No.: 05-1_EPC-SV-PTC-3-LA-00181
D2 27-Feb-2019
13 of
13
1 OL-23-0001 2" OL 23 0001 AS00A 05-1_EPC-SV-AEI-P-XX-23019 1 OF 1 SV-23-HC-004A LUBE OIL COOLER SV-23-KZ-001A 0.045518697
2 OL-23-0002 4" OL 23 0002 AS00A 05-1_EPC-SV-AEI-P-XX-23019 1 OF 1 SV-23-HC-004A LUBE OIL COOLER SV-23-KZ-001A 0.123466806
5 OL-23-0005 4" OL 23 0005 AS00A 05-1_EPC-SV-AEI-P-XX-23022 1 OF 1 SV-23-HC-004B LUBE OIL COOLER SV-23-KZ-001B 0.265565789
6 OL-23-0006 2" OL 23 0006 AS00A 05-1_EPC-SV-AEI-P-XX-23022 1 OF 1 SV-23-HC-004B LUBE OIL COOLER SV-23-KZ-001B 0.057895997
13 SV-23-HC-004A N/A OL 23 N/A N/A 05-1_EPC-SV-AEI-P-XX-23019 1 OF 1 GTC-A Lube Oil Cooler GTC-A Lube Oil Cooler 0.7
14 SV-23-HC-004B N/A OL 23 N/A N/A 05-1_EPC-SV-AEI-P-XX-23022 1 OF 1 GTC-B Lube Oil Cooler GTC-B Lube Oil Cooler 0.7
15 SV-80-HC-001A N/A OL 80 N/A N/A 05-1_EPC-SV-AEI-P-XX-80001 1 OF 1 GTG-A Lube Oil Cooler GTG-A Lube Oil Cooler 0.7
16 SV-80-HC-001B N/A OL 80 N/A N/A 05-1_EPC-SV-AEI-P-XX-80002 1 OF 1 GTG-B Lube Oil Cooler GTG-B Lube Oil Cooler 0.7
05-1_EPC-SV-AEI-P-XX-13001 1 OF 1
17 WHCP-Well slot 5 3/8" OH 14 N/A N/A WHCP Well slot 5 0.002
05-1_EPC-SV-AEI-P-XX-13015 1 OF 1
05-1_EPC-SV-AEI-P-XX-13001 1 OF 1
18 WHCP-Well slot 6 3/8" OH 14 N/A N/A WHCP Well slot 6 0.002
05-1_EPC-SV-AEI-P-XX-13015 1 OF 1
05-1_EPC-SV-AEI-P-XX-13001 1 OF 1
19 WHCP-Well slot 10 3/8" OH 14 N/A N/A WHCP Well slot 10 0.002
05-1_EPC-SV-AEI-P-XX-13015 1 OF 1
05-1_EPC-SV-AEI-P-XX-13001 1 OF 1
20 WHCP-Well slot 11 3/8" OH 14 N/A N/A WHCP Well slot 11 0.002
05-1_EPC-SV-AEI-P-XX-13015 1 OF 1
05-1_EPC-SV-AEI-P-XX-13001 1 OF 1
21 WHCP-Well slot 12 3/8" OH 14 N/A N/A WHCP Well slot 12 0.002
05-1_EPC-SV-AEI-P-XX-13015 1 OF 1
22 Leg A2-Sleeve GS9 Pile Gripper Release hose 1 3/8" N/A 91 N/A N/A N/A Control Panel Pile Gripper System TBA
23 Leg A2-Sleeve GS9 Pile Gripper Release hose 2 3/8" N/A 91 N/A N/A N/A Control Panel Pile Gripper System TBA
24 Leg B2-Sleeve GS3 Pile Gripper Release hose 1 3/8" N/A 91 N/A N/A N/A Control Panel Pile Gripper System TBA
Page 1 of 2
SAO VANG AND DAI NGUYET DEVELOPMENT PROJECT
OIL FLUSHING LINE LIST SUMMARY
Rev: D2
Date: 28-Feb-2019
Product
Seq. Piping
No. Line no. Pipe Size Service System Code P&ID Number From To Volume (m3) Remark
Number Class
Code
25 Leg B2-Sleeve GS3 Pile Gripper Release hose 2 3/8" N/A 91 N/A N/A N/A Control Panel Pile Gripper System TBA
26 Leg B8-Sleeve GS4 Pile Gripper Release hose 1 3/8" N/A 91 N/A N/A N/A Control Panel Pile Gripper System TBA
27 Leg B8-Sleeve GS4 Pile Gripper Release hose 2 3/8" N/A 91 N/A N/A N/A Control Panel Pile Gripper System TBA
28 Leg A8-Sleeve GS10 Pile Gripper Release hose 1 3/8" N/A 91 N/A N/A N/A Control Panel Pile Gripper System TBA
29 Leg A8-Sleeve GS10 Pile Gripper Release hose 2 3/8" N/A 91 N/A N/A N/A Control Panel Pile Gripper System TBA
30 Leg A2, section 1, Hydraulic supply tubing 3/8" N/A 91 N/A N/A N/A Flooding Quick Connection Panel Flooding Valve TBA
31 Leg A2, section 2, Hydraulic supply tubing 3/8" N/A 91 N/A N/A N/A Flooding Quick Connection Panel Flooding Valve TBA
32 Leg A8, section 1, Hydraulic supply tubing 3/8" N/A 91 N/A N/A N/A Flooding Quick Connection Panel Flooding Valve TBA
33 Leg A8, section 2, Hydraulic supply tubing 3/8" N/A 91 N/A N/A N/A Flooding Quick Connection Panel Flooding Valve TBA
34 Leg B2, section 1, Hydraulic supply tubing 3/8" N/A 91 N/A N/A N/A Flooding Quick Connection Panel Flooding Valve TBA
35 Leg B2, section 2, Hydraulic supply tubing 3/8" N/A 91 N/A N/A N/A Flooding Quick Connection Panel Flooding Valve TBA
36 Leg B8, section 1, Hydraulic supply tubing 3/8" N/A 91 N/A N/A N/A Flooding Quick Connection Panel Flooding Valve TBA
37 Leg B8, section 2, Hydraulic supply tubing 3/8" N/A 91 N/A N/A N/A Flooding Quick Connection Panel Flooding Valve TBA
38 Hydraulic system for Life boat and work boat davit’s winch TBA TBA TBA TBA TBA TBA TBA TBA TBA
Page 2 of 2
Oil Flushing
Oil Flushing
Oil Flushing
Oil Flushing
Oil Flushing
Oil Flushing
Oil Flushing
Oil Flushing
Oil Flushing
Oil Flushing
Oil Flushing
Oil Flushing
Oil Flushing
Oil Flushing
Oil Flushing
Oil Flushing
Oil Flushing
Oil Flushing
Oil Flushing
Oil Flushing
Oil Flushing
Oil Flushing
Oil Flushing
Oil Flushing
Oil Flushing
Oil Flushing