ure No FOP6-18-0005 Hanoy, dite on 15* Mach 2018
Tham igus: HPC e003 Not iy 13 hing 03 nam 2018
{twnion | MEVIRE CONSULTANT OHA NOI-HAI PHONG EXPRSSWAY PROJECT
Kinki» LIEN DANE TU'VAN MbY38C- DY AN DUONG 6 10.CAO TOC HA NOLHAT PHONG
Antention _ » Mr Nghiém Xudin Hing ~ Acting Project Directo of MI-VJEC JO,
Ki goth Ong Nghiém Xuin Hing — Quyin ghim Abe de dn ltén dah TVGS MI-VIEC
ce Mr. Dang Van Tam — Deputy General Director of VIDIFL
Ding sii + Ong. Bing Vin Tam Phi Ting Gi ie VIDIFL
ce ‘Mr. Pham Ank Phong ~ Director of Project Menagement Board
Déng gti: Ong. Pham Anh Phong Gitim dbe Ban gun i ie dn
SUBIECT + Reply the Engler’ oficial leter No. MIUC/1641/180309.02 dated 097032018
‘regarding fo deduction of contract value according tothe revised cost estimation
under conelusions of the Inspector of Ministry of Construction and the State
‘Audit for Package EX6, Hanoi -HaiPhong Expressway Project
Not cng: Tr 17 dca Tie vin gid sit s6 MUC/Y6.1/180309.02 ng 09/03/2018 v8 vide
OHS You Campin,