fee
TAAK Constructions
Engineers & Piling ContractorsCLIENTS
=
Project: DMRC, Metro Stations Palarivattom & Edappally Project: Neyyar Bridge, Tiruvananthapuram
[OMC ping work. Valuo: 20 Lakhs
DMC; Rotary pling work Value: 110 Lake a ae eae
Compton period : 2015-2017
SYAMA
es
Project: Muthoot Sanskara School, Kakkanad) Project Syamadynamc projects Pvt Ltd, tia
MC pling work: Valve :80 Lake DMC pling work. Value: 200 Lakne
Completion period 2010-2017 Compton period: 2014 - 2015,
Project: Tulsi Devolopers (I)Pvt Lt
DMC pling work Value 322 Late OM ety ing wk Va: 150 athe
Project: Pathiramanal Holidays | Pvt Ltd, Alapuzha
DMC ping work. Value = 86 Lakhs
Completion period: 2012. 2013,
lng work. Value: 75 Lakhs
Non period 2011 2012
s = = a ticket
Project: AVK Meritage homes | PVI Ltd, Ernakulam Project: Trinity Arcades Pvt Ltd, Aluva
OME piling work. Value 80 Lakhs DMC; URP piling work Value : 20 Lakhe
‘Completion period: 2010-2011 ‘Completion peried = 2044 - 2015PROFILE
About Us
TAAK CONSTRUCTIONS is an organization engaged in the fields of Bored cast-in-situ piles (both
conventional DMC Piling and tractor mounted rotary drilling), Precast Pre-bored piles, Micro Piles,
Diaphragm walls, Metre Panel Work, Soil Investigation, Load testing, Drilling and Grouting. The
company was established in 2005 and has been functioning in its present form since 2011. The firm
led by a dynamic experienced team of professionals who have a rich experience of over 20 years in
Construction. Our office located at Kavalaparambil, Konthuruthy, Thevara, Cochin - 682013.
We are actively involved in the construction works for numerous projects all over Kerala for the last
10 years and have executed DMC piling Works for several reputed builders and business establish-
ments of varying magnitudes.
SERVICES
BUGGER CCR Cun ue CRC coi
Case Study and Report Services (CSR)
When you face a problem in the construction industry, our technical team will offer professional ser-
vices after proper study of the problem with modern equipment will provide a detailed project report,
Hydraulic rotary piling (Mait)
The advance technique in last two decades in pile boring technique has resulted in rotary piling
system which is the most time saving methodology. We can provide rotary units of various capacities
to develop pile from 500mm to 1500mm diameter.
Tractor mounted rotary method piling
The cost effective method of Tractor mounted rotary piling an be provided from 500 to 1000mm. this
‘ype of method is very fast and requires the tractor mounted rigs in different power which is available
with us. aa
Conventional DMC piling
Bored cast-in-situ piles developed by conventional tripod rigs this method is extensively used in
India. Pile bores are developed by using following methods. a) Using temporary guide casings. b)
Using gait MS. liners. c) Direct mud circulation. d) Reverse mud circulation. e) Precast
Prebored piles. Marine conventional piling is also done by installation rig as floating platform.
4
ae reamed auger piling a . :
Special under-reaming tools are available with the help of which nel arog at site, and
then concreted a
Load testing and Soil testing Se : ™
Static pile load testing is one of the most common methods for testing the actual in-situ capacity of
a pile. We conduct Routine load test and Dynamic load ar are specialist in analyzing and cor-
relating the lab test results on core samples leading in an economical and better design of pile foun-
dation and all types of ground improvement works,
EE