SUPPLIER DOCUMENT
COVER SHEET
Date:
2011.01.20
Supplier Name:
ILSUNG CORPORATION
Listed below is the current approval status of your documents. Refer to status code listed hereunder for further information. Revisions
originated by the Supplier shall be identified by revision triangles with revision numbers and by revision clouds which shall be removed after
CB&I Procurement representative must be advised immediately of any price or delivery change before proceeding.
Correct and resubmit documents stamped '3' or ‘4' within 10 working days.
Stamp documents "Certified" and resubmit within 10 working days for documents returned stamped '2'.
For technical questions regarding the comments made, contact the CB&I Requisition Originator assigned to this P.O.
STATUS CODES
2 = Accepted. Proceed with fabrication. Resubmit "Final/Certified" drawings within two (2) weeks
3 = Comments as noted. Proceed with fabrication in accordance with comments. Resubmit corrected drawings as
IMPORTANT
Should the Supplier consider that any comments made by the Purchaser change the Scope of Supply, the Supplier shall advise the
price and delivery implications of such changes within five working days of receipt. The Supplier must not incorporate such
changes without prior approval of the Purchaser of the revised price and/or delivery period. RETROSPECTIVE CLAIMS WILL NOT
BE CONSIDERED.
Purchaser’s review of Supplier’s documents does not relieve Supplier of the responsibility for correctness under the Purchase Offer.
Permission to proceed does not constitute acceptance of design, detail and calculations, test methods or materials developed or selected by
the Supplier and does not relieve the Supplier from full compliance with the Purchase Offer or any other obligations, nor detract from any of
© CBI Americas Ltd. 2008. All rights reserved. Contains confidential information proprietary to CB&I, or its affiliates,
clients or suppliers and may not to be used, reproduced or disclosed without CB&I's prior written permission.
CB&I Lummus
Cartagena Refinery Expansion Project No.166000
Engineering Review Status
By: hukilsl
166000-000-PR-DM02-0002.04 Rev. 4 1 - Final/Certified 07-Oct-09
NOZZLE LIST
MATERIAL SPECIFICATIONS
DRAWING LIST