CHECKLIST FOR SUB-BASE CONSTRUCTION

Checked by Confirmed by
S/No Description of Works
Contractor RTO
1 Subgrade approval

2 Check cleanliness and level of sub-grade layer

Send properly labelled subbase samples for the following tests:

3.1 Maximum Dry Density


3
3.2 California Bearing Ratio (CBR)

3.3 Grading Analysis

4 Check formation levels of subbase

5 Check subbase thickness

6 Provide adequate drainage compaction


Continue mechanical compaction process until specified maximum dry density is
7
obtained
8 Check sufficient temporary traffic devices if lane closure is required

9 Others