You are on page 1of 11
SHESTELS. tke TENUER SPECIFICATION EK PERE A SSR PTENO CLW/ES/3/0047 ALT (AleleilelFl | I. ENCLOSURES: 1. ANNEXURE: 2. DRG. NOS 4 1. CLW/ES/3/SK-1/0007 2. CLW/ES/3/SK-2/0047 3 ws he eae ie TOTAL NO. OF SHEETS. JF} oe "TABIC PEF | as sls lo [slain] | ce. See ~ WAG9(COCO) ELECTRIC LOCOMOTIVES raw LOCOMOTIVE WORKS a P.O: CHITT ARAN ee et en 438 orsev - JA SPEEIFIEATION UIC SOCKET FOR 3-PHASE j ae tO LOCaNT IVE Scare: This specification covers tne manufacture fie. supply of UIC Secket for Sprase 6900 HP WAGS AC Loy fomoe ie. Seely 2. SERYECE CONDITLON: 2d CUTMATCE & ENVERDNMENTAL CONBITI ON: ee 6) Maximum atmospheric + #701C Cin Suny & + 50°C Cin shade) tomperacwre b) Narmal humiiity + 6O% bD Mex, Huraidi ty + 400% sahuna¥ion during rainy season. ©) Altitude 160 MASS —— SASL alae Sige irene Sy mits its running-at 1oKm/Ar to #lood level of lozmmm above Roth Se Atmossanane tering. tt 2 eee v my, slate Bee aesert terrain 4) Coastal avess - @ vibration. vibrahous vel encounters in aan las 30 Stelis ‘Sar! paalh- cmant shall be by el 1a Siase Pao Moc Bee PAE ie ] AUTHY. DESCRIPTION INITIAL For Multiple operation of WAG-9 in| Dy.CEE/D-II | coastal region Couplers along with 3 meter | cable is included in sheet no. 7 9s per | letter no. Sarr faye char! 432/09/1887 dated 04.08.2015 and as per approval of CEE/CLW on 26.09.15 no, 4106 of the spucn. are to be followed and sheet no. 7 is tobe Jgnored. j 2) For procurement of UIC Plug without | cable, sheet no. 7 is to followed ignoring | | Dyeee/og 4)For procurement of UIC Socket sheet | 3¢/ | 24.11.15 49.03.18, | | e Oy-c8B{0-G] Erte on tf adnom bin fr Ulé Plug ¢ Secteet in addition to | wy Existing 1310S. Total Pim fer wie | rat eee ib 18.Mos bev Push | »” f é b|prcegh2| iteration ee te er " withdrawn . | E.|dyce6/0-T |r Para 10-2 is deleted | Gy) ‘Mounting amd overall ‘Tp shall bf as per above | oes The poe a oe | are is - ded in Page no. diecast oe - - nt ia Tela) ae to. er? 1 = CHITTARANIAN LOCOMOTIVE WORKS | i WEST BENGAL, INDIA. =~ | No. cLwiEss/0047/A | Bfe/>/E/F DY. CEE/D-il_ | DATE: 24.11.15 433 SHEET NO. 18/2 ALT, No. AUTHY. DESCRIPTION INITIAL DATE 1. Sheet -1A deleted. 2. Sheet-1C included. 3. Shell Material Receptacle i.e Standard socket changed ‘to Aluminum Die Cast (Ivory colour) as per DIN EN 1706 International Standard in Cl.No.4.0 a) at Sheet No.2 | 4, Spelling corrected to ‘Sealing’ and ‘Neoprene’ in CI.No.4.0 f) at Sheet No.2 5. In Clause No.4 f) Sheet No.2, Sealing material changed from Neoprene rubber to Silicone rubber. 6. In Clause No. 4 c) Sheet No.2, Contact material Copper Alloy with Surface Gold Plated in place of Nickel | ‘SPECIFCATION WEST BE FOR go y SPECIFICATION NO. CLW/ES/3/0047 UIC SOCKET DORN CHKO CHIITARANJAN LOCOMOTIVE WORKS }ENGAL, INDIA ‘APPROVED BY aT | F DY.CEE/D-I 1.0 SCOPE: ‘This specification covers the manufacture the supply of UIC socket for 3-Phase Electric Locomotive. 2.0 SERVICE CONDITION: 2.1. CLIMATIC & ENVIROMENTAL CONDITION 2.1.1 Maximum Atmospheric Temperature 2.1.2. Minimum Temperature | 2.1.3 Humidity 2.1.4 Reference site condition 2.1.5 Rain fall 2.1.6 Atmosphere conditions 2.1.7 Coastal Area 2.1.8 Wind Speed 2.1.9 Vibration 3.0 STANDARDS: All design and constructions of the equipment shall confirm to UIC 558. For non-metallic parts, Flammability test will be done as per EN 45545 Ingress Protection : IP 66 (Cover Closed Condition) IP 67 (Cover Closed Condition) _IP 69K (Plug & Receptacle in Mated Condition) ( As per IEC 60529) , 432, SHEET No: 1¢ Metallic surface +75°C(in Sun) & +70°C (in Shade) - 20°C (also snowfall in certain areas in winter season) + 100% saturation in rainy season : Ambient temperature : -20°C to 70°C Humidity : 100% Altitude: 176m above mean sea level. Very heavy in certain areas. : Extremely dusty and desert terrain in certain area. The dust concentration in air may reach a high value of 1.6 mg/m’. In many iron and coal mine areas, the dust concentration is very high affecting the filter and air ventilation system. Humid and salt laden atmosphere with maximum pH value of 8.5, sulphate of 7mg/litre , maximum concentration of chlorine 6mg/litre and maximum | conductivity of 130 micro Siemens/cm High wind speed in certain areas, with wind pressure reaching 150 kg/m? The equipment sub system and their mounting, arrangement will be designed to with stand vibrations and shocks encounters in service as specified in corresponding IEC publication unless otherwise prescribed. SPECIFICATION FOR UIC SOCKET | DRN ide CHKO. CHITTARANJAN LOCOMOTIVE WORKS WEST BENGAL, INDIA. SPECIFICATION NO. CLW/ES/3/0047. APPROVED BY DY.CEE/D-II | . 43 ' 2 =] Eieat a TecHnrcAL OATA(dIS = j ~S of con TRACTS a3 PTR EB + Pe) . \ Rated itege 1 25 ¥ Guith PES v AC) : iaination © Grt'pe (tools Waab-2.5 UEC) * : aterils. : . pie Cask a) Shall Material Receptacte se in gerd.» Aluniniua, very colour) 4* pey pin ew i706 ©) bo Brag” + Pelynida 6 iglase fibre rewinforcem: tone aeay 2 Contact material _ gebour StL) Cauld Plated) ©) } Fares i 1 3 eet e's lathe? Mesartant % sale’ saty ® + elcome rubber Lite > 10,000 Qparatt SiLean © tnmulatfons Ginga: C4, OC/BBO VAC Che wer vec otto) Wihignd 0-7 tig: “heerox.), 0.€5 bg. for omy raceptecle, r Back ena fitting for Cable dia } + 0.07 &- Cable aia 16mm o:7 B: FoR C oR FOR UIC RECEPTACLE 13 POLE The sali features of connector wnould be < a saith Puy: later polymide shell, High inpact resist ‘ade a resistant, weather proof. rasietant #0 quick coutiog ant & eis Ses ie Seth Cal eting contacts - d) The replacement of seals without remeval af contact. feo | ha SxEET - 3 TEST) CONDITIONS: Type test & Routine test: ALL the tests should confirm to Specification IEC 144 . VDE 0627, UIC See 6 DRAWINGS & SKEECHES Lise, CLW/ES/3-8K-4/0047 - for dbsembly parts drawings with t ,. ti) CLW/ES/3-SK-2,3/0047 - Overall and assembly garts dimensional drawings: ‘ i 7 NAME PLACE: 3 ndicabing he andere ghall affix Name Plats on the squfement indicating the name of the equipment, serial No. type. Mig. L¥esr inéluding essential techyical parameter, if any- * OPERATING CONDITIONS FOR GUIDENGE ting + : Per day at least in hours. ; fat og ee i at enue 80 years (132400 hrs.3 | Cite time : Under correct maintenance 30 years } a. ITY/LOCO — 2 NOS. | reese. 10. REFERENCES; ho.t Thi citication refers to original manufacturer of Wat caven &, SchS faa ‘St Germany ‘Type SBA-U1G S68 VE Cror Ret only) ©) : 40.2 ‘The tenderer should irm that this item is as used { ip S-phase AL locometive of Class manufactured by ABB for Indian Ral laays. = pasted © aug Th ir earn tor Lor nity al ad Dake = yelea tae CHITTARANJAN LOCOMOTIVE WORKS. +o as Note, Moi wot Bi Y _ WEST BENGAL-, INDIA DRG. NO. CLW/ES/3/SK-1/004; Lm AV ercyeaMst a on, "i UIC SOCKET © Dake — 14/10/34 | teresa { GHITTAPANJAN LOCOMOTIVE WORKS. | WEST BENGAL, INDIA. : 4° DRG. NO. GLW/ES/3/SK-2/0047 Y yy | o:ccsatoe \oate:- al ce ANe Loverall ditmenciens shall be as per quill = The other _dimansiane ot drowg af" DY. CEE/D-I ‘CHITTARANJAN LOCOMOTIVE WORKS WEST BENGAL, INDIA. DRG. NO. co eearunasnoris isic/e DATE: 24-1146 LE,

You might also like