You are on page 1of 8
CONFIDENTIAL APIJUN 2018/D08281 UNIVERSITI TEKNOLOGI MARA FINAL EXAMINATION COURSE : MEASUREMENT OF CONSTRUCTION WORKS IV (PAPER 2) COURSE CODE : DQS281 EXAMINATION : JUNE 2018 TIME : 3HOURS INSTRUCTIONS TO CANDIDATES 1. This question paper consists of two (2) parts: PART.A (1 Question) PART B (2 Questions) 2. Answer ALL questions, i) Answer Question 1 from PART A in the Slip-sort Papers. ii) Answer ALL questions from PART B in the Answer Booklet. Start each answer on a new page. 3. All measurement shall be based in strict accordance with the principles lald down in the Malaysian Standard Method of Measurement of Building Works (Second Edition) (SMM2). 4 Make assumption when detail and specifications are not provided or unclear. All assumptions must be clearly stated 5 Do not bring any material into the examination room unless permission is given by the invigilator, 6 Please check to make sure that this examination pack consists of. i) the Question Paper ii) a three-page Appendix 1 il) Slip-sort Papers ~ provided by the Faculty iv) an Answer Booklet's Cover - provided by the Faculty V)_an Answer Booklet ~ provided by the Faculty vi) SMM2 ~ provided by the Faculty 7. Answer ALL questions in English, DO NOT TURN THIS PAGE UNTIL YOU ARE TOLD TO DO SO This examination paper consists of printed pages (© Hak Cipta Universit! Teknologi MARA CONFIDENTIAL CONFIDENTIAL 2 APIJUN 2018/0Q8281 PART A. QUESTION 4 The accompanying drawings number PUB/DQS281/P2/1-3 show a Proposed Construction of a five-storey office building with one sub-basement in Bandar Universiti Seri Iskandar, Perak Take-off all the works related to basement wall and basement slab (excluding all works related to basement excavation) by referring to the following notes: i) The site: cut to platform level ii) Water proofing to basement wall: to be executed from outside of basement wall Steel sheet piles are required to uphold face of excavation (all sides) iv) Concrete mix for retaining wall: Grade 30 factory mix concrete with aggregate of maximum size 20mm. Minimum cube test strength shall be 16.5N/mm? at 7 days and 30N/mm? at 28 days. You are advised to read all the specification notes in the drawings before proceeding with your taking-off. You can make any necessary assumption. (50 marks) © Hak Cipta Univorsiti Teknologi MARA, CONFIDENTIAL CONFIDENTIAL 3 PARTB QUESTION 1 APIJUN 2018/D8281 Prepare the rates for the works below. The calculation for the analysis of price must be shown clearly. ITEM DESCRIPTION UNIT Qty | RATE AMOUNT PILING WORKS PRECAST CONCRETE PILE 350mm x 350mm x 12.00m precast concrete piles Total number of pile Nr (8 marks) STEEL H PILE 314mm x 365mm x 109kq/m Grade 43A Mild Steel to BS 4360 H-Piles Total driven depth (7 marks) | Nip Cut off top of piles to required level (10 marks) TOTAL CARRIED TO SUMMARY The calculation for the above items will be based on the following information with the necessary assumptions apart from those given below: MATERIAL, PLANT AND LABOUR COST Supply cost and delivery to site 350mm x 350mm x 12,00m precast concrete pile Hiring of 10-tonne Lorry (including operator & fuels) ‘© Hak Cipta Universiti Teknolog! MARA = RM 850.00/Nr = RM 500.00 /day CONFIDENTIAL CONFIDENTIAL Hiring of 25-tonne Crane (including operator & fuels) Hiring of piling plant Hiring of cutting equipment Skilled Labour Unskilled Labour LABOUR AND PLANT OUTPUT Output of piling plant 1 piling point Number of head can be cut in 1 day Number of prepare head in the project Number of trip per day Capacity of 10-tonne Lorry Time taken for unloading precast concrete pile Time taken for loading the surplus pile Disposal surplus length for Stee! H Pile QUESTION 2 APIJUN 2018/DQS281 = RM 750.00 /day = RM600.00/ day = RM 300.00 /day = RM 80.00 /Day = RM 56.00 /Day 7 points / day 1 initial pile (12.00m) and 1 extension pile (6.00m) 20 Nr/ day 315Nr 6 trips 7 Nr of precast conerete pile for 12.00m length 18 Nr of steel H pile for 6.00m length 0.85 hours 2 hours 10% from supply length a) Explain briefly the understanding of Provisional Sum and Prime Cost Sum. (10 marks) b) Build-up the unit rates for the following preliminaries items for a government project using PWD 203A Form of Contract. The contract sum is RM20 Million and the construction period is twenty-four (24) months. (© Hak Cipta Universiti Teknologi MARA CONFIDENTIAL CONFIDENTIAL 5 APIJUN 2018/DQ8281 State any assumptions used in the calculation i) Temporary Water Supply ii) Temporary Hoarding ill) Site Safety Equipment (15 marks) END OF QUESTION PAPER © Hak Cipta Universiti Teknologi MARA CONFIDENTIAL CONFIDENTIAL, APPENDIX 4 (1) AP/JUN 2018/DQS281(PAPER 2) UNIVERSIT! TEKNOLOGI MARA 6000 e500) aoe CARPAR' YOUNAY HARE ALL NECESSARY AND [REASONABLE ASSUMPTIONS WHERE penucasie PROJECT TUE [CADANGAN MEMBINA DAN, | MENVIAPKAN BANGUNAN PEJABAT 5 TINGKAT DENGAN 1 TINGKAT | SUB-BASEMENT BANDAR UNVERSIT DRAWING TE: -—- PLAN ELEMENT MEASUREMENT OF CONSTRUCTION WORKS: . ‘DASZEH(PAPER 2) jot LAL arr esr uer base ‘ CHECKED BY 6 6 8 WAN NORIZAN $66 == SCALE _| ASSHOWN uN 20%6 wo | 97% ea DRAWING NO. Pusioas281iP2rt © Hak Cipta Universiti Teknologi MARA CONFIDENTIAL APPENDIX 4 (2) APIJUN 2018/DQS281(PAPER 2) & UNIVERSITI TEKNOLOGI MARA. ‘YOU MAY MARE ALL NEGESSARY AND REASONABLE ASSUMPTIONS WHERE 23.2000 PROIEGT TLE ‘CADANGAN MENEINA DAN /MENYIAPAAN BANGUNAN PEJABAT 5S TNGKAT DENGAN TINGKAT SUB-BASEMENT i BANDAR UNVERST. ‘DRAWING TILE SECTION re ___ MEASUREMENT OF i CONSTRUCTION WORKS | oom aw WAN NORIZAN SECTION A-A | ‘RAW BY | 2 ‘SCALE | ASSHOWN DATE: UN2018 ‘DRAWING NO, pusioas281/P22 © Hak Cipta Universiti Teknolog! MARA ‘CONFIDENTIAL APPENDIX 4 (3) APIJUN 2018/DQS281 (PAPER 2) UNIVERSIT! TEKNOLOG: MARA xo, NOTES [ 7 seusioge cuernnous. 8 SRR OE STE 8 soo saa rene, rere —|-—— — cL = ro = is cconsteueTON sont X rT sag we lp -— sistema uns chem nose 45.6 ante ALLE. a scien hen ~ = aoe 7 at : onewte VY, ‘YOU MAY WAKE ALL NECESSARY AND | BRUSHBOND WATERPROOFING SYSTEM eae TO_THE EXTERIOR BASEMENT TYPICAL_PLAN FOR eee CADANGAN EMEINA DAN BASEMENT WALL NEAYAPRAN BANGINAN PEJABAT STINGKAT DENGAN {TNGKAT 0-100 UB BASEMENT ANDAR UNVERST oof Hl ] = LJ : ‘250mm SUPERCAST — FILUNG JOINT WITH POLYSULPHIDE DRAWN TITLE WaT WATERSTOP Sali aN BITOMEN HORENATEO 3 rane DETAILS k — . oan | sm tk en concrete Be F ls eLENENT me foe feats fee | MEASUREMENT OF F “porlx ovo sean CONSTRUCTION WORKS. 25h Ga? COMPOUND. or) TYPICAL_CROSS-SECTION ; jr COED OY MIGRSEMENTAWATINPATSIAR TYPICAL DETAIL OF EXPANSION JOINT ————— EE IN BASEMENT WALL/SLAB AH NORZAN orawney | 20 SCALE | as sHome [one | wnanre RAWNG NO Pusrpas2s1P23 © Hak Cipta Universit! Teknologi MARA

You might also like