GOVERNMENT OF DUBAI
~ .:1 ol-+.Dg . c : ~ ~
Dubai Electricitlj & Water Ruthoritlj
a I l. o>

‫هــيئـــة كـــهـــربـــاء ومـــيـــاه دبـــي‬


‫طلب ربط وحدات إنتاج الطاقة الكهربائية من الطاقة الشمسية واتفاقية الربط‬

DUBAI ELECTRICITY AND WATER AUTHORITY


Application for Connection of Generators of Electricity from Solar Energy and Connection Agreement

I. DETAILS OF CUSTOMER :‫ بيانات المتعامل‬.i

1. Full name of applicant (customer): .............................................................................. :‫ االسم الكامل لمقدم الطلب‬.1

2. Nationality: ..........................................................................................................................................:‫ الجنسية‬.2

3. Identifcation Reference:................................................................................................................... :‫ رقم الهوية‬.3

II. APPLICATION AND GENERATOR DETAILS :‫ الطلب وبيانات وحدة اإلنتاج‬.ii

1. Contract Account under which the Renewable ‫ حساب العقد المربوط عليه وحدة انتاج‬.1
Generator is connected (Hosting Account):.........................................................:)‫الطاقة المتجددة (حساب االستضافة‬

2. DEWA Solar NOC reference number:............................................................. :‫ رقم مرجع شهادة عدم الممانعة من الهيئة‬.2

3. Tarif meter ID:............................................................................................................................... :‫ بيانات العداد‬.3

4. Proposed installed Maximum Capacity:...........................................................................:‫ الحد األقصى المقترح للربط‬.4

III. DETAILS OF CONSULTANT :‫ بيانات االستشاري‬.iii

1. Name of Consultant:................................................................................................................... :‫ اسم االستشاري‬.1

2. Telephone:.......................................................................................................................................:‫ رقم الهاتف‬.2

IV. DETAILS OF CONTRACTOR :‫ بيانات المقاول‬.iv

1. Name of Contractor:........................................................................................................................:‫ اسم المقاول‬.1

2. Telephone:....................................................................................................................................... :‫ رقم الهاتف‬.2

~ EXPO Our Vision

~ ~ [I aa DEWAOFFICIAL
2020
DUBAI
UAE
A sustainable innovative leading utility
P.O. Box 564, Dubai, United Arab Emirates
customercare@dewa.gov.ae I www.dewa.gov.ae T: +971 4 601 9999, F: +971 4 601 9995
OFFICIAL SUSTAINABLE ENERGY PARTNER
~
GOVERNMENT OF DUBAI
~ .:1 ol-+.Dg . c : ~ ~
Dubai Electricitlj & Water Ruthoritlj
a I l. o>

I/We, the undersigned, hereby:


1. Apply for connection of the Renewable Generator 10. Understand that no change can be made to the
identifed above to the Authority Distribution System; Renewable Generator afecting its design or Maximum
Capacity without frst receiving written approval from the
2. In applying for connection, specifcally agree to comply with Authority.
the rules and regulations specifed herein, and any further
rules and regulations that DEWA may introduce from time 11. Acknowledge that this Connection Agreement shall
to time; become efective upon connection of the Renewable
Generator to the Distribution System, and shall continue
3. Understand that, in case the Authority approves the to remain in efect until termination. The Connection
application, this Connection Agreement will form a Agreement may be terminated for any of the following
legally binding contract between the undersigned and reasons:
the Authority;
a. Automatically, on the termination of the Hosting
4. Agree to observe and be bound to the Connection Account;
Conditions for Generators of Electricity from Solar Energy
attached, and any amendment made thereto by the b. The Producer may terminate the Connection
Authority from time to time; Agreement at any time by giving the Authority
a (30) days prior written notice stating the Producer’s
5. Agree to pay the connection charges determined by the intent to terminate the Connection Agreement. In
Authority along with the Value Added Tax as applicable. this case, the Authority will communicate to the
Producer a date falling within 30 days from reception
6. Agree to comply with the safety rules and regulations in of such notice, at which the Generator will be
installation and operation of Renewable Generator to disconnected by the Authority, and the Connection
avoid threat to people, property and environment. Agreement will cease to have efect;

7. Acknowledge that in the case of risk for the safety or c. The Authority may terminate the Connection
the security, or for maintenance of the Distribution Agreement at any time by giving the Producer at
System and electricity network of Dubai, the Authority is least thirty (30) days’ prior written notice for default
entitled to disconnect the Renewable Generator from the of any of the terms and conditions of the Connection
Distribution System with immediate efect; Agreement, providing in it the basis for termination
and allowing a reasonable cure period to remedy the
8. Confrm that Renewable Generator is designed in a way breach; and the Producer fails to cure the default
to automatically and immediately be disconnected within the specifed cure period.
and isolated from the Distribution System in the event
of a fault of the Distribution System, or a fault of the 12. Understand that the attached Connection Conditions
Renewable Generator; for Generators of Electricity from Solar Energy form an
integral part of this Connection Agreement;
9. Authorize the Authority to use and disclose the
information related to the Renewable Generator as it may 13. Acknowledge that this Connection Agreement shall in
deem appropriate , in line with the Authority’s security all respects be governed and construed in accordance
and privacy policy; with the laws and regulations prevailing in the Emirates
of Dubai.

........................................... ...........................................
Signature of the Customer or Company stamp (if applicable)
Authorised Representative

Name and designation (if applicable) ....................................................................................................................................

Date ....................................................................................................................................................................................

Attachment: Connection Conditions for Generators of Electricity from Solar Energy.

EXPO Our Vision

E'l 11 iJ a a

2020 A sustainable innovative leading utility


DEWAOFFICIAL
DUBAI P.O. Box 564, Dubai, United Arab Emirates
customercare@dewa.gov.ae I www.dewa.gov.ae UAE T: +971 4 601 9999, F: +971 4 601 9995
OFFICIAL SUSTAINABLE ENERGY PARTNER
‫‪~::J‬‬ ‫‪oL+.-og ..c:Lu. . .m..~ a I !. m‬‬
‫‪Dubai Electricity & Water Authority‬‬
‫‪GOVERNMENT OF DUBAI‬‬

‫أنا‪/‬نحن الموقع‪/‬الموقعون أدناه‪ ،‬نقر بما يلي‪:‬‬


‫‪ .9‬تفويــض الهيئــة فــي اســتخدام واالفصــاح عــن المعلومــات المتعلقــة‬ ‫‪ .1‬التقــدم بطلــب ربــط وحــدة انتــاج الطاقــة المتجــددة أعــاه بنظــام توزيــع‬
‫ـيا مــع سياســة األمــن‬
‫ـبا تماشـ ً‬
‫بوحــدة إنتــاج الطاقــة حســبما تــراه مناسـ ً‬ ‫هيئــة كهربــاء وميــاه دبــي‪.‬‬
‫والســرية الخاصــة بالهيئــة‪.‬‬
‫‪ .2‬التقــدم بطلــب الربــط‪ ،‬فــإن ذلــك يعنــي الموافقــة علــى االلتــزام بالقواعــد‬
‫‪ .10‬مــن المفهــوم أنــه ال يمكــن إجــراء أي تغييــر فــي وحــدة إنتــاج الطاقــة‬
‫واللوائــح الــواردة هنــا وأي قواعــد ولوائــح أخــرى قــد تفرضهــا الهيئــة مــن‬
‫المتجــددة ممــا يؤثــر فــي تصميمهــا أو الحــد األقصــى لقدرتهــا دون‬
‫وقــت آلخــر‪.‬‬
‫الحصــول علــى موافقــة خطيــة مســبقة مــن الهيئــة‪.‬‬

‫‪ .11‬اإلقــرار ببــدء نفــاذ اتفاقيــة الربــط الماثلــة عنــد ربــط وحــدة انتــاج الطاقــة‬ ‫‪ .3‬مــن المفهــوم أنــه فــي حالــة موافقــة الهيئــة علــى الطلــب‪ ،‬تكــون اتفاقيــة‬
‫المتجــددة إلــى نظــام التوزيــع‪ ،‬وتظــل ســارية النفــاذ لحيــن إنهاؤهــا‪ .‬يجــوز‬ ‫الربــط ملزمــة قانونيـ ًـا بيــن الموقــع أدنــاه والهيئــة‪.‬‬
‫إنهــاء اتفاقيــة الربــط ألي ســبب مــن األســباب الــواردة أدنــاه‪:‬‬
‫‪ .4‬الموافقــة علــى االلتــزام والتقيــد بشــروط ربــط وحــدات انتــاج الطاقــة‬
‫تلقائيا عند إلغاء حساب االستضافة‪.‬‬
‫ً‬ ‫أ‪.‬‬ ‫الكهربائيــة مــن الطاقــة الشمســية المرفقــة وأي تعديــات قــد تطــرأ مــن‬
‫وقــت آلخــر مــن قبــل الهيئــة‪.‬‬
‫ب‪ .‬يجــوز للمنتــج إنهــاء اتفاقيــة الربــط فــي أي وقــت بتقديــم إخطــار خطــي‬
‫مســبق مدتــه (‪ )30‬يومـ ًـا إلــى الهيئــة يبيــن رغبــة المنتــج فــي إنهــاء‬
‫‪ .5‬الموافقــة علــى دفــع رســوم التشــغيل التــي تحددهــا الهيئــة مــع ضريبــة‬
‫اتفاقيــة الربــط‪ .‬وفــي هــذه الحالــة‪ ،‬تقــوم الهيئــة بمخاطبة المنتج بشــأن‬
‫القيمــة المضافــة الموافقــة‪.‬‬
‫تحدي ـد تاري ـخ خ ـال ‪ 30‬يومـًـا مــن تاريــخ اســتام االشــعار تقــوم الهيئــة‬
‫بموجبــه بفصــل وحــدة االنتــاج وبذلــك ينتهــي ســريان اتفاقيــة الربــط‪- .‬‬
‫‪ .6‬الموافقــة علــى االلتــزام بقواعــد ولوائــح الســامة فــي تركيــب وتشــغيل‬
‫ت‪ .‬يجــوز للهيئــة إنهــاء اتفاقيــة الربــط فــي أي وقــت بموجــب إخطــار خطــي‬ ‫وحــدة انتــاج الطاقــة المتجــددة لتجنــب أي مهــددات قــد تلحــق بالنــاس أو‬
‫مســبق مدتــه (‪ )30‬يومـًـا إلــى المنتــج نتيجــة إخالــه ألي مــن شــروط‬ ‫الممتلــكات أو البيئــة‪.‬‬
‫وأحــكام اتفاقيــة الربــط شــريطة توضيــح أســباب اإلنهــاء وإعطــاء مهلــة‬
‫معقولــة لمعالجــة ذلــك اإلخــال‪ ،‬وإخفــاق المنتــج فــي معالجــة‬ ‫‪ .7‬اإلقــرار فــي حالــة الخطــر علــى ســامة أو أمــن أو صيانــة نظــام التوزيــع‬
‫اإلخــال خــال المهلــة الممنوحــة‪.‬‬ ‫وشــبكة كهربــاء دبــي بأنــه الهيئــة يحــق لهــا قطــع وحــدة انتــاج الطاقــة‬
‫المتجــددة مــن نظــام التوزيــع بأثــر فــوري‪.‬‬
‫‪ .12‬مــن المفهــوم أن شــروط ربــط وحــدة انتــاج الطاقــة الكهربائيــة مــن الطاقــة‬
‫ـزءا ال يتجــزأ مــن اتفاقيــة الربــط الماثلــة‪.‬‬
‫الشمســية المرفقــة هنــا تشــكل جـ ً‬
‫‪ .8‬تأكيــد علــى أن وحــدة إنتــاج الطاقــة المتجــددة مصممــة علــى أن تقــوم‬

‫‪ .13‬اإلقــرار بــأن اتفاقيــة الربــط الماثلــة تنظــم وتفســر فــي جميــع جوانبهــا طبقـًـا‬ ‫بفصــل وعــزل نفســها بطريقــة اوتوماتيكيــة وفوريــة مــن نظــام التوزيــع‬
‫ألحــكام القوانيــن واللوائــح الســارية فــي إمــارة دبــي‪.‬‬ ‫فــي حالــة األعطــال التــي قــد تصيــب نظــام التوزيــع أو األعطــال التــي قــد‬
‫تصيــب وحــدة إنتــاج الطاقــة المتجــددة‪.‬‬

‫‪........................................................‬‬ ‫‪........................................................‬‬
‫مطلوبا)‬
‫ً‬ ‫ختم الشركة (إن كان‬ ‫توقيع المتعامل أو ممثله المفوض‬

‫مطلوبا) ‪.............................................................................................................................................................................................:‬‬
‫ً‬ ‫االسم والمنصب (إن كان‬

‫التاريخ ‪......................................................................................................................................................................................................................................... :‬‬

‫المرفقات‪ :‬شروط ربط وحدات انتاج الطاقة الكهربائية من الطاقة الشمسية‪.‬‬

‫·‪L....u:.,‬‬
‫)‪.9‬‬

‫‪E'l IJ il a a‬‬ ‫‪DEWAOFFICIAL‬‬


‫! ~ ‪lfl./.J 2020‬‬
‫‪6X>.lJlil1u,JJ-----Q)lulJLD.jll‬‬
‫~~ ‪<Lol=9 , i i ~ ,ii.13IJ‬‬
‫'‪i i ~ l '4.--!_µjl uGLo~l ,,y ,564 ·Y·<Y‬‬
‫‪customercare@dewa.gov.ae I www.dewa.gov.ae‬‬ ‫~‪+971 4 601 9995 :.y,5'l9 ,+971 4 601 9999 :uii‬‬

You might also like