The PTB Simulation Report

User: Chandran Geetha Pramoth Chandran


User Email: 200512299@student.georgianc.on.ca
Scenario: Residential Construction Project
Created at: Wednesday, June 8, 2022 3:31:23 PM
Last simulation run result: Scenario finished
Simulation Time: 24
Target Date: 25
Target Cost: 75000
Simulation Cash: 29299
Total Cost: 72702
Benefit: 38.37
Estimated Cost: 92802
Estimated Finish Period: 24
Scenario Information:
Project Name Number of Target Date Initial Cash Bonus per Penalty per
Tasks Period Period

Single Family 15 25 82000 5000 3000


House

Resource Information:
Name Availa Availa Cost/ Idle Firing Hiring Show Firing Hiring Minim Maxim
ble ble Period Cost/ Cost Cost Up Lead Lead um um
Units Units Period Proba Time Time Units Units
in bility
Lead (%)
Time

Archit 1 1 500 300 1 1 98 1 1 0 1


ect

Owner 1 1 150 0 1 1 96 1 1 0 1

Site 1 1 450 100 100 100 99 1 1 0 2


Engin
eer

Gener 1 1 500 200 150 150 97 1 1 0 2


al
Contra
ctor

Worke 6 6 200 50 100 100 85 1 1 0 10


r

Quality Requirements:
The PTB Simulation Report

Name Formula Importanc Minimum Desired Maximum Best Mode Evaluation


e Value Value Value

Strength (2*[WBA] 9 3 10 11 Maximum 6


+ [FOS] +
[RS] +
2*[FS]) / 6

Energy ([TC] + 8 3 10 11 Maximum 6.5


Efficiency [INS]) / 2

Durability ([RD] + 4 6 10 11 Maximum 6.2


[ED] +
[UD] +
2*[FD]) /
5

Task Information:
The PTB Simulation Report

Project Task Name Cost of Actual Actual Income Current Selected


Name Split Start Finish Status Mode

Single Finalize 100 0 1 0 Finished L-Shape


Family Plans
House

Mode Optimi Most Pessim Fixed Archite Owner Site Genera Worker Weight
Name stic Likely istic Cost ct Needed Engine l
Duratio Duratio Duratio Needed er Contra Needed Bearin
n n n Needed ctor g
Needed Ability
(WBA)

L-Shap 1 1 1 1500 1 1 0 0 0 5
e

Rectan 1 2 3 500 1 1 0 0 0 9
gular
Shape
The PTB Simulation Report

Project Task Name Cost of Actual Actual Income Current Selected


Name Split Start Finish Status Mode

Single Secure 100 1 3 0 Finished General


Family Permits
House

Mode Optimist Most Pessimi Fixed Architec Owner Site General Worker
Name ic Likely stic Cost t Needed Enginee Contract Needed
Duratio Duratio Duratio Needed r or
n n n Needed Needed

General 1 2 3 1000 0 1 0 1 0
The PTB Simulation Report

Project Task Name Cost of Actual Actual Income Current Selected


Name Split Start Finish Status Mode

Single Clear Lot 100 3 4 0 Finished PRL Corp.


Family
House

Mode Optimist Most Pessimi Fixed Architec Owner Site General Worker
Name ic Likely stic Cost t Needed Enginee Contract Needed
Duratio Duratio Duratio Needed r or
n n n Needed Needed

General 3 3 3 1000 0 0 1 0 7

Clark 1 3 5 1100 0 0 1 0 0
Constru
ction

PRL 1 2 3 4000 0 0 1 0 0
Corp.
The PTB Simulation Report

Project Task Name Cost of Actual Actual Income Current Selected


Name Split Start Finish Status Mode

Single Install 100 5 7 0 Finished Arcadia


Family Temporary Falls
House Power

Mode Optimist Most Pessimi Fixed Architec Owner Site General Worker
Name ic Likely stic Cost t Needed Enginee Contract Needed
Duratio Duratio Duratio Needed r or
n n n Needed Needed

Madison 1 2 3 2500 0 0 1 1 4
Energy

Arcadia 1 3 5 800 0 0 1 0 2
Falls
The PTB Simulation Report

Project Task Name Cost of Actual Actual Income Current Selected


Name Split Start Finish Status Mode

Single Install 100 5 6 1 Finished ECE


Family Undergrou Cooperativ
House nd Utilities e

Mode Optimist Most Pessimi Fixed Architec Owner Site General Worker
Name ic Likely stic Cost t Needed Enginee Contract Needed
Duratio Duratio Duratio Needed r or
n n n Needed Needed

GRS 2 2 2 5000 0 0 0 0 1
Utilities

ECE 1 1 1 1500 0 0 0 1 1
Coopera
tive
The PTB Simulation Report

Project Task Name Cost of Actual Actual Income Current Selected


Name Split Start Finish Status Mode

Single Excavate 100 8 11 0 Finished Granite


Family for Constructi
House Foundation on
s

Mode Optimi Most Pessim Fixed Archite Owner Site Genera Worker Founda
Name stic Likely istic Cost ct Needed Engine l tions
Duratio Duratio Duratio Needed er Contra Needed Strengt
n n n Needed ctor h (FOS)
Needed

Genera 3 3 3 300 0 0 1 1 8 4
l

Granite 2 4 6 3000 0 0 1 0 1 10

Constr
uction
The PTB Simulation Report

Project Task Name Cost of Actual Actual Income Current Selected


Name Split Start Finish Status Mode

Single First Floor 100 15 17 0 Finished Granite


Family Sheathing Constructi
House on

Mode Optimist Most Pessimi Fixed Architec Owner Site General Worker
Name ic Likely stic Cost t Needed Enginee Contract Needed
Duratio Duratio Duratio Needed r or
n n n Needed Needed

Clark 1 1 1 1500 0 0 1 0 2
Constru
ction

Granite 2 2 2 500 0 0 0 0 1
Constru
ction
The PTB Simulation Report

Project Task Name Cost of Actual Actual Income Current Selected


Name Split Start Finish Status Mode

Single Second 100 16 17 0 Finished Clark


Family Floor Constructi
House Sheathing on

Mode Optimist Most Pessimi Fixed Architec Owner Site General Worker
Name ic Likely stic Cost t Needed Enginee Contract Needed
Duratio Duratio Duratio Needed r or
n n n Needed Needed

Clark 1 1 1 2000 0 0 1 1 2
Constru
ction

Granite 2 2 2 1500 0 0 0 1 3
Constru
ction
The PTB Simulation Report

Project Task Name Cost of Actual Actual Income Current Selected


Name Split Start Finish Status Mode

Single Roof 100 15 17 0 Finished Plywood


Family Decking
House

Mode Optimi Most Pessi Fixed Archit Owner Site Gener Worke Roof Roof
Name stic Likely mistic Cost ect Engin al r Durabi Streng
Durati Durati Durati Neede Neede eer Contra Neede lity th
on on on d d Neede ctor d (RD) (RS)
d Neede
d

OSB 2 2 3 3000 0 0 1 1 0 7 3

Plywo 2 2 2 6000 0 0 1 0 0 8 8
od
The PTB Simulation Report

Project Task Name Cost of Actual Actual Income Current Selected


Name Split Start Finish Status Mode

Single Exterior 100 17 19 0 Finished Clark


Family Finishes Constructi
House on -
Sidings

Mode Optimi Most Pessi Fixed Archit Owner Site Gener Worke Tempe Exteri
Name stic Likely mistic Cost ect Engin al r rature or
Durati Durati Durati Neede Neede eer Contra Neede Durabi
on on on d d Neede ctor d Contro lity
d Neede l (TC) (ED)
d

Gener 3 4 5 3500 0 0 1 1 5 9 8
al -
Brick

Clark 2 2 2 5000 0 0 1 0 0 6 6
Constr
uction
-
Siding
s
The PTB Simulation Report

Project Task Name Cost of Actual Actual Income Current Selected


Name Split Start Finish Status Mode

Single Utility 100 17 19 0 Finished PRL Corp. -


Family Rough In Copper
House

Mode Optimi Most Pessim Fixed Archite Owner Site Genera Worker Utility
Name stic Likely istic Cost ct Needed Engine l Durabil
Duratio Duratio Duratio Needed er Contra Needed ity
n n n Needed ctor (UD)
Needed

Genera 2 2 2 1000 0 0 1 1 3 3
l-
Plastic

Genera 4 4 4 2500 0 0 1 1 6 9
l-
Copper

PRL 2 2 2 4000 0 0 0 1 1 7
Corp. -
Copper
The PTB Simulation Report

Project Task Name Cost of Actual Actual Income Current Selected


Name Split Start Finish Status Mode

Single Interior 100 19 21 0 Finished Teshekur


Family Finishes Corp.
House

Mode Optimi Most Pessim Fixed Archite Owner Site Genera Worker Insulat
Name stic Likely istic Cost ct Needed Engine l ion
Duratio Duratio Duratio Needed er Contra Needed (INS)
n n n Needed ctor
Needed

Genera 1 3 5 1500 0 0 1 1 7 4
l

Teshek 2 2 2 5500 0 0 1 0 1 7
ur
Corp.
The PTB Simulation Report

Project Task Name Cost of Actual Actual Income Current Selected


Name Split Start Finish Status Mode

Single Landscapin 100 21 22 0 Finished General


Family g
House

Mode Optimist Most Pessimi Fixed Architec Owner Site General Worker
Name ic Likely stic Cost t Needed Enginee Contract Needed
Duratio Duratio Duratio Needed r or
n n n Needed Needed

General 1 1 1 1 0 0 0 0 6
The PTB Simulation Report

Project Task Name Cost of Actual Actual Income Current Selected


Name Split Start Finish Status Mode

Single Final 100 22 24 15000 Finished General


Family Acceptance
House

Mode Optimist Most Pessimi Fixed Architec Owner Site General Worker
Name ic Likely stic Cost t Needed Enginee Contract Needed
Duratio Duratio Duratio Needed r or
n n n Needed Needed

General 1 2 3 1 0 1 1 1 0
The PTB Simulation Report

Project Task Name Cost of Actual Actual Income Current Selected


Name Split Start Finish Status Mode

Single Framing 100 12 15 0 Finished Clark


Family Consturcti
House on - Wood

Mode Optimi Most Pessi Fixed Archit Owner Site Gener Worke Frami Frami
Name stic Likely mistic Cost ect Engin al r ng ng
Durati Durati Durati Neede Neede eer Contra Neede Streng Durabi
on on on d d Neede ctor d th lity
d Neede (FS) (FD)
d

Clark 2 3 4 4000 0 0 1 1 1 4 5
Const
urctio
n-
Wood

ORS 3 4 5 6500 0 0 1 1 3 9 8
Corp. -
Steel