INDEXINGINDEX
‘A Blowout is an Uncontrolled Kick. Pa
1240
25
Atypical procedure for stripping out pipe rams...7-26
‘A General Procedure.
A typical procedure for stripping in pipe ram:
A ypical Stripping out with the Annular procedure...
Abnormal Pressures. sol 5, 24
1241
Accessories and Support Equipment..
Acidizing 246
Accidental closing of Blind or undersized Rams
Accidental Dropping of the String.n.cnonnnI 342
Accumulator and BOP testsonesnesDAl D5, 919
‘Accumlator charging Fluids... 922
Accumlator closing test. D1
Acidizing 107,108
Adjustable Chokes. 51,927,929
Advantages of Reverse Circulation. 1017
Alarm Setting. se.
Alternate Start- Up Kill Procedure. 1155
1260
Ambient Ait...
Annular Capacities, Volum«
Annular Pressure Control.»
Annular Preventers.
Annulus Blockage/ Collapse:
sure Er ized Rir
Ait fasgoFer Te Pris nT
‘API Type BX Pressure Energized Ring Joint Gasker
i6
"APL Type R Ring Joint Gasket 4
[APL Type RX Pressure Enered Ring Joint Gaske
sone d39)
Backpressure Valves (BVP)...
Backpressure Valves (Check Valves)
Backpressure Valves (BVP) Failure.
Balanced.. =
Balling. 210
Ballooning, Hl, 149, 14
Barite Requirements. E282
Blast Joint nnn lO 38
Blind Rams. i
Blind/Shear Rams.
Blockages in the String...
BOP Inspection and Testing.
BOP Operating Pressure...
BOP Seach ; none Al, IFAS
BOP Stack organization..
BOP Testing...
BOP Test Procedures.
BOP...
Bottomhole Assembly
Bottomhole Assembly Length...
Bottomhole Pressure...
Bridge Plug...
Bridges in String
Bringing Pump online.
Bullheading..
Bullheading Procedure
Buoyancy.
Calculating the Balance Point...
Cameron Face
Ringjount Grosvesee re
i Le eres98, 1218
51
Hydraulic System/Circuitr
Hydrogen Sulfide or Sour Gas
Hydrostatic Pressure. 1
Improper Displacement 25,28
Improper Fill Amounts 312,313
Improper Hole Fill. B12, 313
Information Systems 1939, 940
Initial Circulating Pressure 63, 16
Inside Blowout Preventer 313,933, 1339
Installing Coiled Tubing Strings.. 1246
Installation Equipment for SidePocket Gas Lift Valves
aa a nel
Insufficient Fluid Density. 102
wl02
Junk and Boot Baskets
Kelly eypes. 45
Kick Detection... od
346, 5.10
Kick Dectection Equipment
Kick Dectection when Operating without a Rist;
1136
Kick Dectection with Risers and Stacks.
Kick Size
Kicks Out of the Hole.
Kicks while Cementing:
Kick while Logging or Wirelining.
Kicks while out of Hole.
Kicks while Bunning Casing
Kicks with pipe to Bottom.
Kill Fluid.
Kill Fluid Density
Kill Method and Procedure.
Kill Mud & Pressure Considerations
Kill Weight Fluid teaches Bitsensm-
esos
Lag/Transit.
Landing nipple (Profile Nipple).
Leak Off Test (LOT).
Leaks.
Leaking Blind Ram...
Leaking Safety or Pipe Ram...
Length of BHA..
Liner...
Liner Hanger...
Liquid Kicks...
Liquid Pump...
Load Measurement.
Location...
Location/Site Preparation...
Long Stroke Unit.
Lost Circulation...
Lower Kelly Cock,
Lubricate & Bleed Method...
Lubricator...
Main System Pressure.
Maintaining Proper Pressure.
Mandel ern
Manual Adjustable Chokes..
Marine Riseti.-nammee
Massive Shale...
Measured Depth
Measuring DeviceSwionnoumnons
Mechanical & Hole Problems...
Milling
Milling Tool
Motorman...
Moving Pipe - Surge/Swab.
Mud Engineer.