‘lass 4= Equipment. | Class 3—semi-detaled | Class 2—detailed
factor estimate Factor Estimate sstimate ‘estimate Estimate
‘Basis of Etimate
Level of project definition ‘O%to 1% 1% t02% 410 15% 15% 10.30% 30% 10 70%
{expressed as a percentage
of Engineering) «
‘Expected estate 350% to S100% SON to 55H TOR to SH Fon tease Bato 0%
accuracy range
‘Methodology ‘Capacity factored using | Equipment acored, | MmofMTO's and | Detaled unitcosts | Detaled unt coats
historcaldata, | parametric models, | factors semi detaied | with assembly level | with detaled take offs
Judgement or analogy | Judgement or analogy unit cost tine tems forced detail
take ofs
‘Quotations Tenders one benchmark | Budget equipment] Equipment quotes and] Maltpe frm Equipment order,
Supporting the estimate | data quotes benchmark | benchmark material | equipment quotes. | tendered or firm
data supply and Multiple material | quotes avalable
onstruction rates | supply and Tenders fo material
construction quotes | supplyand
construction costs
Some contracts
awarded
Tapected estimate Tea 20%30% 156208 1061 0%
contingency range
‘General Project Data ‘Maturity Level ‘Maturity Level iataty val Maturity Level ‘Maturity tev
Project scope description General Defined Defined Defined
lant location General Assumed Speatic Spectie Specie
Faclty capacity or plant “Assumed Preliminary Defined Defined Datined
production
Soils and ydrology Report esumed ‘Assumed Defined Defined Defined
integrated Project Plan General General Freiminary Specie Specie
* laSalle ss
—=—__sClass 5 ~ Capacity
factor estimate
Class 4 ~ Equipment
Factor Estimate
Work Break Down
‘Outlined Outlined Preliminary
structure
Project Code of Accounts one Outlined Preliminary
Contracting Strategy ‘Assumed ‘Assumed Preliminary Defined
Implementation
Procurement Strategy None ‘Assumed Preliminary Defined
Vendor Selection None None identified for major | Selection for major Detailed
equipment equipment
roject Master Schedule Outing Outlined Preliminary Defoe ‘Actual to date and
Implementation : detailed to go
Project level schedule None None Outlined Detailed ‘Actual to date and
detailed to go
Project Master Schedule Outlined ‘Outlined Outlined Detailed Detailed
Commissioning and Ramp
up
Direct Costs Factored Factored Preliminary Detailed “Actual to date and
detailed to go
Indirect Costs Factored Factored Factored Detailed ‘Actual to date and
detailed to go
inflation oF escalation None None Preliminary Detailed Detailed
strategy
Foreign Exchange Strategy None None Preliminary Detailed Detaled
Contingency Assessed or Factored | Assessed or Factored Calculated Detail calculation or | Detailed calculation on
analysis the “to go”
fecuracy ‘Assessed by ‘Assessed by Evaluated Detail calculation or | Detail calculation or
judgement Judgement ‘analysis; Monte Carlo | analysis; Monte Carlo
‘or similar ‘or similar
‘Basis of Estimate and Outlined Outlined Preliminary Complete Complete
‘methodology statement