You are on page 1of 53

HSUB

HARGA SATUAN UPAH DAN BAHAN

Nama Pekerjaan :
Pemilik Pekerjaan :
No. Kontrak :
Alamat :

No. Uraian Satuan Harga hari total No.


1 kenek 3 Rp 135,000 180 Rp72,900,000.00 1
2 Supervisor 1 Rp 180,000 180 Rp32,400,000.00 2
3 Mandor 1 Rp 170,000 180 Rp30,600,000.00 6
4 Tukang Kayu 1 Rp 150,000 30 Rp4,500,000.00 7
5 Tukang Besi 1 Rp 150,000 15 Rp2,250,000.00 25
10 Tukang Cat 2 Rp 130,000 30 Rp7,800,000.00 8
12 Tukang Listrik 2 Rp 140,000 15 Rp4,200,000.00 9
14 Tukang Gypsum 2 Rp 130,000 7 Rp1,820,000.00 10
16 Tukang Sipil 3 Rp 150,000 180 Rp81,000,000.00 17
Rp237,470,000.00 15
20
16
21
12
22
23
24
26
27
28
29
30
31
32
42
72
37
43
45
46
48
44
49
52
53
51
HARGA SATUAN UPAH 54
No. Uraian Satuan Harga hari total 55
1 kenek 3 Rp 135,000 180 Rp72,900,000.00 56
2 Supervisor 1 Rp 180,000 180 Rp32,400,000.00 77
3 Mandor 1 Rp 170,000 180 Rp30,600,000.00 59
4 Tukang Kayu 1 Rp 150,000 30 Rp4,500,000.00 61
5 Tukang Besi 1 Rp 150,000 15 Rp2,250,000.00 60
10 Tukang Cat 2 Rp 130,000 30 Rp7,800,000.00 62
12 Tukang Listrik 2 Rp 140,000 15 Rp4,200,000.00 63
14 Tukang Gypsum 2 Rp 130,000 7 Rp1,820,000.00 65
16 Tukang Sipil 3 Rp 150,000 180 Rp81,000,000.00 66
Rp237,470,000.00 67
68
Rp237,470,000.00 70
Rp177,490,000.00 71
total Rp414,960,000.00 73
74
47
75
78
57
69
11
39
76
41
40
34
35
36
33
4
3
5
64
14
58
13
19
18
50
38
HARGA SATUAN BAHAN
Uraian Satuan Harga Kebutuhan
Amplas listrik bh 250,000 1
AC Split set 3,000,000 4
Balok kayu kelas II m³ 2,000,000 1
bata hebel m³ 785,000 17
genteng beton bh 11,500 408
Besi Beton Polos Ø10 kg 15,000 294
Besi Beton Polos Ø8 kg 7,000 186
Besi Beton Ulir D12 btg 9,000 65
Cat pelapis anti bocor 5 kg kg 250,000 4
Cat dasar 20 kg kg 550,000 3
Closet duduk bh 1,205,000 1
Cat Mowilex kuta 800 bh 298,000 3
Engsel pintu 4" Dekson set 45,000 18
Bondek 6 x 0,75 x 0,055 Psg 2,600,000 1
Engsel tanam dekkson Lot 120,000 1
Exhaustfan dinding 35x35cm setara panasonic bh 473,000 1
floor drain bh 50,000 3
Granit tile 60x60 black mate m 350,000 5
granite tile 60x60 glossy m 365,000 70
grass block bh 40,000 5
Handle pintu set 374,000 6
Homogenous tile 30x30 hitam dus 60,000 2
Homogenous tile 30x30 putih dus 60,000 10
Kabel 2x3,5 mm Supreme m1 10,000 150
kramik bevek 10x20 dus 80,000 4
solarflat Bening Tebal 3mm m2 520,000 2.5
Kerikil m3 290,000 30
Kuas bh 20,000 4
Lampu Phillips Downlight 15W bh 85,000 15
List plafon shadowline btg 30,000 18
Outlet data setara Panasonic bh 150,000 1
Lampu Phillips 10W bh 40,000 4
Outlet telepon setara Panasonic bh 125,000 1
paku 5 kg 25,000 7
paku 7 kg 27,000 5
Paku 10 kg 27,000 5
Pasir beton m³ 280,000 35
Pasir pasang m³ 285,000 24
Pemasangan kusen almunium dengan 2 daun pintu multiplek; asesoris unit 4,750,000 1
Toren penguin 550 L unit 1,685,000 1
pipa 3/4" btg 36,000 10
Pipa freon AC m1 64,000 12
Pipa 5/8" btg 14,000 45
Pipa PVC 4” btg 150,000 4
Plafond PVC Gypsum lbr 85,000 33
Saklar setara Panasonic bh 45,000 12
Sealent tube 35,000 4
Semen nat kg 15,000 5
Semen Portland Tiga Roda sak 58,000 350
Shower bh 274,000 2
Skrup dus 80,000 4
Stop kontak broco bh 40,000 12
Stoper pintu bh 100,000 1
mangkok listrik bh 3,000 25
T dus bh 8,000 20
washtafel TOTO bh 655,000 2
pengeboran air m 200,000 24
Shimizu Mesin Pompa Air PC 503 BIT Jet Pump 50 Meter PC503BIT bh 3,280,000 1
bio tank/septictank 1400lt bh 2,650,000 1
knee 3/4 bh 5,000 20
Tee 3/4 bh 6,000 6
knee drat 3/4 kuningan bh 16,000 3
knee 4'' bh 5,000 6
Keran Air angsa bh 295,000 1
keran air shower bh 235,000 1
keran tee closet bh 110,000 1
Kanopi m' 350,000 2.5
baja ringan hollow 2x4 btg 24,000 35
baja ringan hollor 4x4 btg 27,000 35
baja ringan rangka atap btg 120,000 28
reng atap btg 38,000 33
Bubble Foil Aluminium, Bubblewrap Foil, Peredam Panas Atap Ramah lingkungan m' 18,000 41
pintu pvc kamar mandi 1 bh 338,000 1
Bondek 6 x 0,75 x 0,055 lbr 810,000 11
Cat Vinilex soft tisue kg 30,000 60
cat vinilex 300 kg 27,000 20
pager balkon m 450,000 3
kitchen sink bh 375,000 1
JUMLAH MATERIAL TOTAL
Bobot Isi Pasir 1400 kg/m³
Bobot Isi Kerikil 1350 kg/m³

harga total
Rp250,000
Rp12,000,000
Rp2,000,000
Rp13,345,000
Rp4,692,000
Rp4,410,000 berat per batang 4.74 kg berat besi total (kg) 1393.56 kg
Rp1,302,000 berat per batang 7.4 kg berat besi total (kg) 1376.4 kg
Rp585,000 berat per batang 12.5 kg berat besi total (kg) 812.5 kg
Rp1,000,000 per ember 5 kg 3.57 liter Luas Dinding Luar 60 m2
Rp1,650,000 per ember 20 kg 14.28 liter Luas Dinding Dalem 274.5 m2
Rp1,205,000
Rp894,000 Luas Tampak Depan 45.1 m2
Rp810,000 Jumlah Daun Pintu 6
Rp2,600,000 Daun Pintu Utama 2
Rp120,000
Rp473,000
Rp150,000
Rp1,750,000 Luas Teras 5.5 m2
Rp25,550,000
Rp200,000
Rp2,244,000
Rp120,000 Luas Lantai WC 1.6 m2
Rp600,000 Luas Dinding WC 10 m2
Rp1,500,000
Rp320,000 Luas Dinding Dapur 3.6 m2
Rp1,300,000
Rp8,700,000
Rp80,000
Rp1,275,000
Rp540,000
Rp150,000
Rp160,000
Rp125,000
Rp175,000
Rp135,000
Rp135,000
Rp9,800,000
Rp6,840,000
Rp4,750,000
Rp1,685,000
Rp360,000
Rp768,000 Luas per lembar Plafond 2.88 m2
Rp630,000
Rp600,000
Rp2,805,000 Luas Plafond 89.8 m2
Rp540,000
Rp140,000
Rp75,000
Rp20,300,000
Rp548,000
Rp320,000
Rp480,000
Rp100,000
Rp75,000
Rp160,000
Rp1,310,000
Rp4,800,000
Rp3,280,000
Rp2,650,000
Rp100,000
Rp36,000
Rp48,000
Rp30,000
Rp295,000
Rp235,000
Rp110,000
Rp875,000 Luas Area Kanopi 2.5 m2
Rp840,000
Rp945,000
Rp3,360,000
Rp1,254,000
Rp738,000 Luas Atap 40.79 m2
Rp338,000
Rp8,910,000
Rp1,800,000
Rp540,000
Rp1,350,000
Rp375,000
Rp177,740,000
ANALISIS HARGA SATUAN PEKERJAAN
ANALISIS HARGA SATUAN PEKERJAAN
No Uraian Pekerjaan Satuan Volume
I Pekerjaan Persiapan
1.1 Pembersihan 1 m2 Lapangan dan Perataan
No. Uraian Satuan Koef
A Tenaga Kerja:
kenek 3 0.100
Supervisor 1 0.050
B Material

C Lain-lain
Peralatan ls 1.000
Jumlah
Overhead + Profit 15%
Harga Satuan Pekerjaan
1.2 Pengukuran dan Pemasangan 1m' Bouwplank
No. Uraian Satuan Koef
A Tenaga Kerja:
kenek 3 0.100
Tukang Kayu 1 0.100
Mandor 1 0.010
Supervisor 1 0.005
B Material
Kayu Kelas II m³ 0.012
paku 5 kg 0.020
Balok Kayu Kelas II m³ 0.007
C Lain-lain
Peralatan ls 1.000
Jumlah

Harga Satuan Pekerjaan


1.3 Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2
No. Uraian Satuan Koef
A Tenaga Kerja:
kenek 3 0.200
Tukang Kayu 1 0.400
Mandor 1 0.020
Supervisor 1 0.020
B Material
Dolken Kayu 4m #N/A 1.250
Semen Portland Tiga Roda sak 2.500
Pasir Beton m³ 0.005
Kerikil m3 0.009
Seng Gelombang #N/A 1.200
Paku #N/A 0.060
Meni Besi #N/A 0.450
C Lain-lain
Peralatan ls 1.000
Jumlah
Overhead + Profit 15%
Harga Satuan Pekerjaan
1.4 Pembongkaran 1m 3 Dinding Tembok Bata
No. Uraian Satuan Koef
A Tenaga Kerja:
kenek 3 6.667
Mandor 1 0.333
B Material

C Lain-lain
Peralatan ls 1.000
Jumlah
Overhead + Profit 15%
Harga Satuan Pekerjaan
II Pekerjaan Struktur
Pekerjaan Tanah
2.1 Penggalian 1 m³ Tanah Keras sedalam 1 m
No. Uraian Satuan Koef
A Tenaga Kerja:
Pekerja #N/A 1.000
Mandor 1 0.032
B Material

C Lain-lain
Peralatan ls 1.000
Jumlah
Overhead + Profit 15%
Harga Satuan Pekerjaan
2.2 Pengurugan Kembali 1 m³ Galian Tanah
No. Uraian Satuan Koef
A Tenaga Kerja:
Pekerja #N/A 0.500
Mandor 1 0.050
B Material

C Lain-lain
Peralatan ls 1.000
Jumlah
Overhead + Profit 15%
Harga Satuan Pekerjaan
2.3 Pengurugan 1 m³ dengan Pasir Urug
No. Uraian Satuan Koef
A Tenaga Kerja:
Pekerja #N/A 0.300
Mandor 1 0.010
B Material
Pasir beton m³ 1.200
C Lain-lain
Peralatan ls 1.000
Jumlah
Overhead + Profit 15%
Harga Satuan Pekerjaan
Pekerjaan Pondasi
2.4 Pembuatan 1 m3 Lantai Kerja
No. Uraian Satuan Koef
A Tenaga Kerja:
kenek 3 1.200
Tukang Sipil 3 0.200
Mandor 1 0.020
Supervisor 1 0.060
B Material
Semen Portland Tiga Roda sak 230.000
Pasir Beton m³ 0.638
Kerikil m3 0.761
C Lain-lain
Peralatan ls 1.000
Jumlah
Overhead + Profit 15%
Harga Satuan Pekerjaan
2.5 Pekerjaan Pondasi Footplat 60 x 60
No. Pekerjaan Satuan Koef
A Tenaga Kerja:
Pekerjaan Beton Bertulang
2.6 Pekerjaan Sloof 25/30
No. Uraian Satuan Koef
A Tenaga Kerja:
Pekerja #N/A 4.000
Tukang Besi 1 1.000
Tukang Kayu 1 1.000
Tukang Batu #N/A 0.275
Kepala Tukang #N/A 0.032
Mandor 1 0.028
B Material
Papan Kayu Terentang 2/20 #N/A 0.270
Paku #N/A 2.000
Minyak Bekisting #N/A 0.600
Besi Beton Polos #N/A 200.000
Kawat Beton #N/A 2.250
Semen Portland Tiga Roda sak 323.000
Pasir Beton m³ 0.520
Kerikil m3 0.780
C Lain-lain
Peralatan ls 1.000
Jumlah
Overhead + Profit 15%
Harga Satuan Pekerjaan
2.7 Pekerjaan Kolom Beton Bertulang
No. Uraian Satuan Koef
A Tenaga Kerja:
Pekerja #N/A 7.000
Tukang Besi 1 2.100
Tukang Kayu 1 1.650
Tukang Batu #N/A 0.275
Kepala Tukang #N/A 0.040
Mandor 1 0.034
B Material
Papan Kayu Terentang 2/20 #N/A 0.400
Paku #N/A 4.000
Minyak Bekisting #N/A 2.000
Besi Beton Polos #N/A 250.000
Kawat Beton #N/A 4.500
Semen Portland Tiga Roda sak 323.500
Pasir Beton m³ 0.520
Kerikil m3 0.780
Kayu Kelas III #N/A 0.100
Plywood 9mm #N/A 3.500
C Lain-lain
Peralatan ls 1.000
Jumlah
Overhead + Profit 15%
Harga Satuan Pekerjaan
2.8 Pekerjaan Balok Beton Bertulang
No. Uraian Satuan Koef
A Tenaga Kerja:
Pekerja #N/A 5.960
Tukang Besi 1 1.400
Tukang Kayu 1 1.650
Tukang Batu #N/A 0.275
Kepala Tukang #N/A 0.033
Mandor 1 0.032
B Material
Papan Kayu Terentang 2/20 #N/A 0.320
Paku #N/A 3.200
Minyak Bekisting #N/A 1.600
Besi Beton Polos #N/A 200.000
Kawat Beton #N/A 3.000
Semen Portland Tiga Roda sak 323.500
Pasir Beton m³ 0.520
Kerikil m3 0.780
Kayu Kelas III #N/A 0.140
Plywood 9mm #N/A 2.800
Dolken Kayu 4m #N/A 16.000
C Lain-lain
Peralatan ls 1.000
Jumlah
Overhead + Profit 15%
Harga Satuan Pekerjaan
2.9 Pekerjaan Plat Lantai
No. Uraian Satuan Koef
A Tenaga Kerja:
Pekerja #N/A 4.850
Tukang Besi 1 1.050
Tukang Kayu 1 1.300
Tukang Batu #N/A 0.275
Kepala Tukang #N/A 0.027
Mandor 1 0.027
B Material
Papan Kayu Terentang 2/20 #N/A 0.270
Paku #N/A 2.000
Minyak Bekisting #N/A 0.600
Besi Beton Polos #N/A 175.000
Kawat Beton #N/A 2.250
Semen Portland Tiga Roda sak 323.000
Pasir Beton m³ 0.520
Kerikil m3 0.780
C Lain-lain
Peralatan ls 1.000
Jumlah
Overhead + Profit 15%
Harga Satuan Pekerjaan
SATUAN PEKERJAAN
SATUAN PEKERJAAN
Harga Satuan Jumlah Harga

m2 Lapangan dan Perataan ✅


Harga Satuan Total Harga Harga Satuan Pekerjaan

Rp 135,000 Rp 13,500
Rp 180,000 Rp 9,000

Rp 49,000
Rp 20,000 Rp 20,000
Rp 42,500
Rp 6,375
Rp 48,875
Pemasangan 1m' Bouwplank ✅
Harga Satuan Total Harga Harga Satuan Pekerjaan

Rp 135,000 Rp 13,500
Rp 150,000 Rp 15,000
Rp 170,000 Rp 1,700
Rp 180,000 Rp 900

Rp 2,000,000 Rp 24,000
#VALUE!
Rp 25,000 Rp 500
Rp 2,000,000 Rp 14,000

Rp 20,000 Rp 20,000
Rp 89,600
#VALUE!
#VALUE!
ntara dari seng gelombang tinggi 2 meter ✅
Harga Satuan Total Harga Harga Satuan Pekerjaan

Rp 135,000 Rp 27,000
Rp 150,000 Rp 60,000
Rp 170,000 Rp 3,400
Rp 180,000 Rp 3,600

#N/A #N/A
Rp 58,000 Rp 145,000
Rp 280,000 Rp 1,400
#N/A
Rp 290,000 Rp 2,610
#N/A #N/A
#N/A

#N/A #N/A
#N/A #N/A

Rp 20,000 Rp 20,000
#N/A
#N/A
#N/A
1m 3 Dinding Tembok Bata ✅
Harga Satuan Total Harga Harga Satuan Pekerjaan

Rp 135,000 Rp 900,045
Rp 170,000 Rp 56,610

Rp 1,124,000
Rp 20,000 Rp 20,000
Rp 976,655
Rp 146,498
Rp 1,123,153

³ Tanah Keras sedalam 1 m ✅


Harga Satuan Total Harga Harga Satuan Pekerjaan

Rp 150,000 Rp 150,000
Rp 170,000 Rp 5,440

Rp 202,000
Rp 20,000 Rp 20,000
Rp 175,440
Rp 26,316
Rp 201,756
embali 1 m³ Galian Tanah ✅
Harga Satuan Total Harga Harga Satuan Pekerjaan

#N/A #N/A
Rp 170,000 Rp 8,500

#N/A
Rp 20,000 Rp 20,000
#N/A
#N/A
#N/A
1 m³ dengan Pasir Urug ✅
Harga Satuan Total Harga Harga Satuan Pekerjaan

#N/A #N/A
Rp 170,000 Rp 1,700

Rp 280,000 Rp 336,000
#N/A
Rp 20,000 Rp 20,000
#N/A
#N/A
#N/A

an 1 m3 Lantai Kerja ✅
Harga Satuan Total Harga Harga Satuan Pekerjaan

Rp 135,000 Rp 162,000
Rp 150,000 Rp 30,000
Rp 170,000 Rp 3,400
Rp 180,000 Rp 10,800

Rp 58,000 Rp 13,340,000
Rp 16,061,000
Rp 280,000 Rp 178,600
Rp 290,000 Rp 220,615

Rp 20,000 Rp 20,000
Rp 13,965,415
Rp 2,094,812
Rp 16,060,227
ondasi Footplat 60 x 60
Harga Satuan Total Harga Harga Satuan Pekerjaan
rjaan Sloof 25/30
Harga Satuan Total Harga Harga Satuan Pekerjaan

#N/A #N/A
Rp 150,000 Rp 150,000
Rp 150,000 Rp 150,000
#N/A #N/A
#N/A #N/A
Rp 170,000 Rp 4,811

#N/A #N/A
#N/A #N/A
#N/A #N/A #N/A
#N/A #N/A
#N/A #N/A
Rp 58,000 Rp 18,734,000
Rp 280,000 Rp 145,600
Rp 290,000 Rp 226,200

Rp 20,000 Rp 20,000
#N/A
#N/A
#N/A
Kolom Beton Bertulang
Harga Satuan Total Harga Harga Satuan Pekerjaan

#N/A #N/A
Rp 150,000 Rp 315,000
Rp 150,000 Rp 247,500
#N/A #N/A
#N/A #N/A
Rp 170,000 Rp 5,700

#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A #N/A
#N/A #N/A
Rp 58,000 Rp 18,763,000
Rp 280,000 Rp 145,600
Rp 290,000 Rp 226,200
#N/A #N/A
#N/A #N/A

Rp 20,000 Rp 20,000
#N/A
#N/A
#N/A
Balok Beton Bertulang
Harga Satuan Total Harga Harga Satuan Pekerjaan

#N/A #N/A
Rp 150,000 Rp 210,000
Rp 150,000 Rp 247,500
#N/A #N/A
#N/A #N/A
Rp 170,000 Rp 5,406

#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A
#N/A #N/A
Rp 58,000 Rp 18,763,000
Rp 280,000 Rp 145,600
Rp 290,000 Rp 226,200
#N/A #N/A
#N/A #N/A
#N/A #N/A

Rp 20,000 Rp 20,000
#N/A
#N/A
#N/A
rjaan Plat Lantai
Harga Satuan Total Harga Harga Satuan Pekerjaan

#N/A #N/A
Rp 150,000 Rp 157,500
Rp 150,000 Rp 195,000
#N/A #N/A
#N/A #N/A
Rp 170,000 Rp 4,505

#N/A #N/A
#N/A #N/A
#N/A #N/A #N/A
#N/A #N/A
#N/A #N/A
Rp 58,000 Rp 18,734,000
Rp 280,000 Rp 145,600
Rp 290,000 Rp 226,200

Rp 20,000 Rp 20,000
#N/A
#N/A
#N/A
Sumber
Permen PUPR No. 28
SNI 7394:2008
Thn 2016
A. 2.2.1.9

A. 2.2.1.4

A. 2.2.1.2
A. 2.2.1.14

A. 2.3.1.4

A. 2.3.1.9

A. 2.3.1.11
6.4

Pasal 6.5 (Beton K-175)


Pasal 6.17 (Pembesian)
Pasal 6.20 (Bekisting
Pondasi)
Dimensi
Pekerjaan Jumlah
Berat (kg/m) Panjang (m) Lebar (m) Tinggi (m)
Pondasi 60 x 60 (satuan: m3) 0.6 0.6 0.2
Beton K-175 0.6 0.6 0.2
Beton K-175 per m3
Besi Ulir D13 1.042 0.6 16
Berat besi ulir D13 per m3
Bekisting pondasi 0.6 0.6 0.2
Luas bekisting per m3

*Kolom Pedestal 25 x 30 (satuan: m3)


Beton K-175
Beton K-175 per m3
Besi Polos Ø10
Berat besi polos Ø10 per m3
Besi Polos Ø8
Berat besi polos Ø8 per m3
Bekisting Kolom
Luas bekisting per m3

*Kolom dibawah sloof


Volume Satuan Keterangan
0.072 m3 Pembagi
0.072 m3
1 m3
10.003 kg SNI 2052
138.93 kg
0.48 m2
6.67 m2

m3
m3
m3
kg SNI 2052
kg
kg SNI 2052
kg
m2
m2
TOTAL KEBUTUHAN MATERIAL
SEMEN 267 ZAK
PASIR 34.1 M3
KRIKIL 21.6 M3

KOLOM
P X L X T
Kolom Lt.1 Balok Lt.1
0.25 x 0.25 x 3.5
Jml Kolom 11 bh Jml Balok
V= 0.21875 M3 V=
V total = 2.40625 M3 V total =

Semen = 1 M3 = 276 kg Semen =


1 Zak = 50 kg
Kebutuhan = 665 M3 = 14 Zak Kebutuhan =

Pasir = 1 M3 = 828 kg Pasir =


Kebutuhan = 1993 M3 = 1.5 M3 Kebutuhan =

Krikil = 1 M3 = 1012 kg Krikil =


Kebutuhan = 2436 M3 = 1.9 M3 Kebutuhan =

P X L X T
Kolom Lt.2 Balok Lt.2
0.15 x 0.15 x 3.5
Jml Kolom 18 bh Jml Balok
V= 0.07875 M3 V=
V total = 1.4175 M3 V total =

Semen = 1 M3 = 276 kg Semen =


1 Zak = 50 kg
Kebutuhan = 392 M3 = 8 Zak Kebutuhan =

Pasir = 1 M3 = 828 kg Pasir =


Kebutuhan = 1174 M3 = 0.9 M3 Kebutuhan =

Krikil = 1 M3 = 1012 kg Krikil =


Kebutuhan = 1435 M3 = 1.1 M3 Kebutuhan =

P X L X T
Kolom Pedestal Sloof
0.25 x 0.3 x 0.6
Jml Kolom 8 bh Jml Balok
V= 0.045 M3 V=
V total = 0.36 M3 V total =
Semen = 1 M3 = 276 kg Semen =
1 Zak = 50 kg
Kebutuhan = 100 M3 = 2 Zak Kebutuhan =

Pasir = 1 M3 = 828 kg Pasir =


Kebutuhan = 299 M3 = 0.3 M3 Kebutuhan =

Krikil = 1 M3 = 1012 kg Krikil =


Kebutuhan = 365 M3 = 0.3 M3 Kebutuhan =
BALOK
P X L X T
0.25 x 0.3 x 40.5
1 bh
3.0375 M3
3.0375 M3

1 M3 = 276 kg
1 Zak = 50 kg
839 M3 = 17 Zak

1 M3 = 828 kg
2517 M3 = 1.8 M3

1 M3 = 1012 kg
3075 M3 = 2.3 M3

P X L X T
0.25 x 0.3 x 40.5
1 bh
3.0375 M3
3.0375 M3

1 M3 = 276 kg
1 Zak = 50 kg
839 M3 = 17 Zak

1 M3 = 828 kg
2516 M3 = 1.8 M3

1 M3 = 1012 kg
3074 M3 = 2.3 M3

P X L X T
0.25 x 0.3 x 34.5
1 bh
2.5875 M3
2.5875 M3
1 M3 = 276 kg
1 Zak = 50 kg
715 M3 = 15 Zak

1 M3 = 828 kg
2143 M3 = 1.6 M3

1 M3 = 1012 kg
2619 M3 = 2 M3
PONDASI
P X L X T
Pondasi Tapak
0.6 x 0.6 x 0.2
Jml Balok 8 bh
V= 0.072 M3
V total = 0.576 M3

Semen = 1 M3 = 276 kg
1 Zak = 50 kg
Kebutuhan = 159 M3 = 4 Zak

Pasir = 1 M3 = 828 kg
Kebutuhan = 477 M3 = 0.4 M3

Krikil = 1 M3 = 1012 kg
Kebutuhan = 583 M3 = 0.5 M3

PLAT LANTAI
P X L X T
Plat Lantai
11 x 5.5 x 0.2
Jml Balok 1 bh
V= 12.1 M3
V total = 12.1 M3

Semen = 1 M3 = 276 kg
1 Zak = 50 kg
Kebutuhan = 3340 M3 = 67 Zak

Pasir = 1 M3 = 828 kg
Kebutuhan = 10019 M3 = 7.2 M3

Krikil = 1 M3 = 1012 kg
Kebutuhan = 12246 M3 = 9.1 M3

DAK TALANG
P X L X T
Dak Talang
13.5 x 1 x 0.2
Jml Balok 1 bh
V= 2.7 M3
V total = 2.7 M3

Semen = 1 M3 = 276 kg
1 Zak = 50 kg
Kebutuhan = 746 M3 = 15 Zak

Pasir = 1 M3 = 828 kg
Kebutuhan = 2236 M3 = 1.6 M3

Krikil = 1 M3 = 1012 kg
Kebutuhan = 2733 M3 = 2.1 M3

P X L
Plester Dinding
64.5 x 7

L= 451.5 M2

Semen = 1/7 = 5.888 kg


1 Zak = 50 kg
Kebutuhan = 2,658.43 M3 = 54 Zak

Pasir = 6/7 = 0.036 M3


Kebutuhan = 0.00 17 M3
Dimensi Genteng Depan Segitiga
Alas 510 cm
Tinggi 325.24 cm
Luas 82936.28 cm2

Dimensi Genteng Samping Trapesium


Alas atas 10 cm
Alas Bawah 515 cm
Tinggi 327.18 cm
Luas 85886.05 cm2

Dimensi Genteng Belakang Jargen


Alas 150 cm
Tinggi 174.14 cm
Luas 26121.11 cm2

Dimensi Genteng Belakang Segitiga


Alas 270 cm
Tinggi 133.14 cm
Luas 17973.26 cm2
= 8.29 m2

= 8.59 m2

= 2.61 m2

= 1.8 m2
REKAPITULASI
Dimensi Luasan Layer Luas Total
Atap Segitiga Besar 8.29 2 16.59 m2
Atap Segitiga Kecil 1.8 1 1.8 m2
Atap Trapesium 8.59 2 17.18 m2
Atap Jajar Genjang 2.61 2 5.22 m2
Total Luasan Atap Keseluruhan 40.79 m2

per meter genteng 10 kep 10 buah


Dimensi = 330 x 420 mm

Kebutuhan = 408 buah


NO. URAIANPEKERJAAN SAT VOLUME HARGA SATUAN (Rp.)
50,681,415.16
A PEKERJAAN PERSIAPAN
1 Pengukuran dan Pemasangan Bouwplank m¹ 60.50 Rp8,000.00
2 pembongkaran ls 1.00 Rp3,500,000.00
3 pembersihan lahan ls 61.00 Rp10,097.00
Jumlah

B PEKERJAAN TANAH DAN PONDASI


1 Galian Tanah Pondasi m' 8.00 Rp141,181.56
2 Urugan Kembali Bekas Galian m' 8.75 Rp25,816.06
3 Urugan Pasir Alas Pondasi t = 10 cm m' 6.81 Rp66,340.82
4 Plat Pondasi Tapak ukuran 60 x 60 cm m' 8.00 Rp3,049,521.75
5 Stik Kolom 25 x 30 m' 8.00 Rp2,371,850.25
Jumlah
C PEKERJAAN PASANGAN
1 Pasangan dinding hebel m² 274.50 Rp83,578.36
2 Pekerjaan Plasteran m² 334.50 Rp16,460.81
3 acian dinding m² 334.50 Rp10,777.91
4 Pekerjaan profil tali air m² 1.80 Rp218,497.72
5 Sudutan tembok (luar + dalam) m¹ 7.90 Rp24,892.15
6 Sudutan bukaan jendela m¹ 5.40 Rp24,277.52
Jumlah
D PEKERJAAN BETON
1 Pek. Sloof 25 x 30 m³ 2.59 Rp6,973,578.03
2 Pek. Kolom 25 x 25 m' 11.00 Rp2,684,251.21
3 Pek. Kolom Praktis 15 x 15 m' 18.00 Rp2,004,903.68
5 Pek. Balok m³ 3.02 Rp8,690,732.40
Pek. Plat Lantai Bondek m³ 12.10 Rp3,660,342.56
Pek. Dak Talang m³ 3.00 Rp3,280,751.48
Jumlah
E PEKERJAAN LANTAI DAN KERAMIK
1 Pek. lantai keramik uk. 60x60 cm m² 88.00 Rp383,514.46
2 Pek. Keramik lantai wc/km, uk. 30x30 cm m² 1.56 Rp237,737.90
3 Pek. Dinding Keramik dapur 10x20 m² 3.60 Rp175,133.59
4 Pek. Keramik Dinding wc/km, uk. 30x30 cm m² 10.00 Rp233,648.81
Jumlah
F PEKERJAAN KUSEN PINTU DAN JENDELA
1 Pek. Kusen Alumunium + daun pintu PVC bh 1.00 Rp1,039,917.72
2 Pek. Kusen Alumunium + daun pintu Multiplek bh 4.00 Rp2,079,835.44
3 Pek. Kusen Alumunium + 2 daun pintu Multiplek bh 1.00 Rp2,946,433.54
4 Pek. jendela satu bh 3.00 Rp606,618.67
6 Pek. jendela dua bh 3.00 Rp1,068,804.32
Jumlah
JUMLAH HARGA ( Rp ) NO.

G
Rp484,000.00 1
Rp3,500,000.00 2
Rp615,952.34 3
Rp4,599,952 Rp4,599,952 4
5
100.0 6
Rp1,129,452.50 2.5 7
Rp225,890.50 1 8
Rp451,781.00 1
Rp24,396,174.00 54 H
Rp18,974,802.00 42 1
Rp45,178,100.00 Rp45,178,100.00 2
100.0 3
Rp22,942,260.60 70.0 4
Rp5,506,142.54 16.8 5
Rp3,605,212.38 11 6
Rp393,295.90 1
Rp196,647.95 0.6 I
Rp131,098.63 0.4 1
Rp32,774,658.00 Rp32,774,658.00
100.0 3
Rp18,044,133.14 11.0 6
Rp29,526,763.32 18.0 7
Rp36,088,266.28 22 8
Rp26,246,011.84 16 9
Rp44,290,144.98 27.0
Rp9,842,254.44 6.0
Rp164,037,574.00 Rp164,037,574.00
100.00 11
Rp33,749,272.83 91.00
Rp370,871.13 1.00 J
Rp630,480.92 1.70 1
Rp2,336,488.12 6.30 4
Rp37,087,113.00 Rp37,087,113.00
100.00 6
Rp1,039,917.72 6.0 7
Rp8,319,341.76 48.0
Rp2,946,433.54 17.0 K
Rp1,819,856.01 10.5 1
Rp3,206,412.97 18.5 2
Rp17,331,962.00 Rp17,331,962.00
4

L
1
2
URAIANPEKERJAAN SAT VOLUME

PEKERJAAN INSTALASI LISTRIK


Titik Lampu ttk 19
Saklar tunggal "panasonic" bh 8
Saklar ganda "panasonic" bh 4
Stop kontak "panasonic" bh 9
kabel 2x1.2 m
Pipa listrik bh 21
MCB Schneider bh 2
Kabel tanam (rod 2 meter) ls 1.00

PEKERJAAN ATAP DAN PLAFOND


Rangka plafond metal hollow galvalum 4x4 & 4x2 cm m² 40.80
Plafond kalsiboard 3.5 mm m² 40.80
Rangka atap baja ringan m² 55.00
Atap beton m² 55.00
nok beton/karpus m' 6.00
Listplank kalsiplank m¹ 12.00

PEKERJAAN SANITASI
Pipa luar dia 3/4 air bersih m¹ 12.00
Pipa luar dia 4 D air kotor m¹ 8.00
Pipa luar dia 3 D air buangan m¹ 10.00
Material sambungan air kotor ls 1.00
Material sambungan air bersih ls 1.00
Kloset jongkok bh 1.00
Septick tank ls 1.00

Bak Kontrol depan dan belakang bh 2.00


Floor drain bh 1.00

PEKERJAAN PENGECATAN
Cat dinding tembok luar (Waterproofing) m² 12.80
Cat kusen pintu & jendela m¹ 24.00
Cat plafond m² 40.80
Cat daun pintu bh 4.00
Cat daun jendela bh 3.00

PEKERJAAN CARPORT
Urugan pasir bawah lantai (t = 5 cm) m³ 3.60
Pasangan batu bata 1:5 m² 5.50
Rabat beton m³ 0.89
Pekerjaan plasteran m² 11.00

PEKERJAAN LAIN-LAIN
Pembersihan akhir ls 1.00
Maintenance ls 1.00
HARGA SATUAN (Rp.) JUMLAH HARGA ( Rp )

34.00
Rp244,264.37 Rp4,641,023.00 25.00
Rp48,730.74 Rp389,845.93 2.10
Rp64,974.32 Rp259,897.29 1.40
Rp51,566.92 Rp464,102.30 2.50

Rp22,100.11 Rp464,102.30 2.50


Rp46,410.23 Rp92,820.46 0.50
Rp0.00 Rp0.00 0.00
Jumlah Rp6,311,791.28 Rp18,564,092.00 overload
100.00
Rp113,096.25 Rp4,614,326.85 15.00
Rp75,397.50 Rp3,076,217.90 10.00
Rp83,896.85 Rp4,614,326.85 15.00
Rp83,896.85 Rp4,614,326.85 15.00
Rp1,794,460.44 Rp10,766,762.65 35.00
Rp256,351.49 Rp3,076,217.90 10.00
Jumlah Rp30,762,179.00 Rp30,762,179.00
100.00
Rp91,040.72 Rp1,092,488.60 10.00
Rp136,561.08 Rp1,092,488.60 10.00
Rp109,248.86 Rp1,092,488.60 10.00
Rp1,638,732.90 Rp1,638,732.90 15.00
Rp1,638,732.90 Rp1,638,732.90 15.00
Rp1,638,732.90 Rp1,638,732.90 15.00
Rp1,638,732.90 Rp1,638,732.90 15.00
#DIV/0! Rp0.00 0.00
#DIV/0! Rp0.00 0.00
Rp273,122.15 Rp546,244.30 5.00
Rp546,244.30 Rp546,244.30 5.00
Jumlah Rp10,924,886.00 Rp10,924,886.00
100.00
Rp309,476.40 Rp3,961,297.95 15.00
Rp275,090.14 Rp6,602,163.25 25.00
Rp161,817.73 Rp6,602,163.25 25.00
Rp1,320,432.65 Rp5,281,730.60 20.00
Rp1,320,432.65 Rp3,961,297.95 15.00
Jumlah Rp26,408,653.00 Rp26,408,653.00 overload
100.00
Rp1,463,154.38 Rp5,267,355.75 25.00
Rp957,701.05 Rp5,267,355.75 25.00
Rp5,918,377.25 Rp5,267,355.75 25.00
Rp478,850.52 Rp5,267,355.75 25.00
Jumlah Rp21,069,423.00 Rp21,069,423.00 overload
0.00
Rp0.00 Rp0.00 0.00
Rp0.00 Rp0.00 0.00
Jumlah Rp0.00 Rp1,971,408.00
HARGA SATUAN (Rp.)

244,887.50
48,950.00
61,600.00
46,750.00
9000
20,000.00
45,000.00
34,500.00
Jumlah

75,905.50
45,804.00
45,000.00
38,000.00
75,000.00
25,000.00
Jumlah

6,250.00
37,525.00
27,825.00
10,000.00
10,000.00
100,000.00
4,000.000.00

355,000.00

Jumlah

30,010.75
35,887.50
21,991.75
50,000.00
135,654.75
Jumlah

192,775.00
55,815.00
1,348,363.50
36,551.00
Jumlah

150,000.00
100,000.00
Jumlah
Pemilik Proyek : Bapak Andi
Jenis Proyek : Renovasi Rumah 2 lt
100.00

BOBOT
NO. URAIANPEKERJAAN JUMLAH HARGA HARGA SATUAN BAHAN
%
No. Uraian Satuan Harga Kebutuhan harga total
A PEKERJAAN PERSIAPAN 1.12 Rp4,599,952.00 1 Amplas listrik bh 250,000 1 Rp250,000
B PEKERJAAN TANAH DAN PONDASI 11 Rp45,178,100.00 2 AC Split POLYTRON PAC 05VG Standard AC Split - Putih [1/2 PK] set 2,600,000 4 Rp10,400,000
C PEKERJAAN PASANGAN 7.98 Rp32,774,658.00 32 3 baja ringan hollor 4x4 btg 27,000 35 Rp945,000
D PEKERJAAN BETON 39.94 Rp164,037,574.00 4 baja ringan hollow 2x4 btg 24,000 35 Rp840,000
E PEKERJAAN LANTAI DAN KERAMIK 9.03 Rp37,087,113.00 5 baja ringan rangka atap btg 120,000 28 Rp3,360,000
F PEKERJAAN KUSEN PINTU DAN JENDELA 4.22 Rp17,331,962.00 20 6 Balok kayu kelas II m³ 2,000,000 1 Rp2,000,000
G PEKERJAAN INSTALASI LISTRIK 4.52 Rp18,564,092.00 7 bata hebel m³ 685,000 17 Rp11,645,000
H PEKERJAAN ATAP DAN PLAFOND 7.49 Rp30,762,179.00 30 8 Besi Beton Polos Ø10 kg 15,000 294 Rp4,410,000
I PEKERJAAN SANITASI 2.66 Rp10,924,886.00 9 Besi Beton Polos Ø8 kg 7,000 186 Rp1,302,000
J PEKERJAAN PENGECATAN 6.43 Rp26,408,653.00 10 Besi Beton Ulir D12 btg 9,000 65 Rp585,000
K PEKERJAAN CARPORT 5.13 Rp21,069,423.00 11 bio tank/septictank 1400lt bh 2,650,000 1 Rp2,650,000
L PEKERJAAN LAIN-LAIN 0.48 Rp1,971,408.00 12 Bondek 6 x 0,75 x 0,055 Psg 2,600,000 1 Rp2,600,000
13 Bondek 6 x 0,75 x 0,055 lbr 810,000 11 Rp8,910,000
SUB TOTAL 100.00 % Rp410,710,000.00 14 Bubble Foil Aluminium, Bubblewrap Foil, Peredam Panas Atap Ramah lingkungan m' 18,000 41 Rp738,000
15 Cat dasar 20 kg kg 550,000 3 Rp1,650,000
16 Cat Mowilex kuta 800 2.5lt bh 298,000 3 Rp894,000
SUB TOTAL Rp410,710,000.00 17 Cat pelapis anti bocor 5 kg kg 250,000 4 Rp1,000,000
TOTAL Rp410,710,000.00 18 cat vinilex 300 kg 27,000 20 Rp540,000
Terbilang : empat ratus sepuluh juta tujuh ratus sepuluh ribu rupiah 19 Cat Vinilex soft tisue kg 30,000 60 Rp1,800,000
20 Closet duduk toto bh 1,305,000 1 Rp1,305,000
HARGA SATUAN UPAH 21 Engsel pintu 4" Dekson set 45,000 18 Rp810,000
No. Uraian Satuan Harga hari total 22 Engsel tanam dekkson Lot 120,000 1 Rp120,000
1 kenek 3 Rp 135,000 180 Rp72,900,000.00 23 Exhaustfan dinding 35x35cm setara panasonic bh 473,000 1 Rp473,000
2 Supervisor 1 Rp 180,000 180 Rp32,400,000.00 24 floor drain bh 50,000 3 Rp150,000
3 Mandor 1 Rp 170,000 180 Rp30,600,000.00 25 genteng beton bh 11,500 408 Rp4,692,000
4 Tukang Kayu 1 Rp 150,000 30 Rp4,500,000.00 29 Granit tile 60x60 black mate m 350,000 5 Rp1,750,000
5 Tukang Besi 1 Rp 150,000 15 Rp2,250,000.00 30 granite tile 60x60 glossy m 365,000 70 Rp25,550,000
10 Tukang Cat 2 Rp 130,000 30 Rp7,800,000.00 31 grass block bh 40,000 5 Rp200,000
12 Tukang Listrik 2 Rp 140,000 15 Rp4,200,000.00 32 Handle pintu set 374,000 6 Rp2,244,000
14 Tukang Gypsum 2 Rp 130,000 7 Rp1,820,000.00 33 Homogenous tile 30x30 hitam dus 60,000 2 Rp120,000
16 Tukang Sipil 3 Rp 150,000 180 Rp81,000,000.00 34 Homogenous tile 30x30 putih dus 60,000 10 Rp600,000
Total Rp237,470,000.00 35 Kabel 2x3,5 mm Supreme m1 10,000 150 Rp1,500,000
36 Kanopi m' 350,000 2.5 Rp875,000
37 Keran Air angsa bh 295,000 1 Rp295,000
38 keran air shower bh 235,000 1 Rp235,000
39 keran tee closet bh 110,000 1 Rp110,000
40 Kerikil m3 290,000 30 Rp8,700,000
41 kitchen sing bh 375,000 1 Rp375,000
42 knee 3/4 bh 5,000 20 Rp100,000
43 knee 4'' bh 5,000 6 Rp30,000
44 knee drat 3/4 kuningan bh 16,000 3 Rp48,000
45 kramik bevek 10x20 dus 80,000 4 Rp320,000
46 Kuas bh 20,000 4 Rp80,000
47 Lampu Phillips 10W bh 40,000 4 Rp160,000
48 Lampu Phillips Downlight 15W bh 85,000 15 Rp1,275,000
49 List plafon shadowline btg 30,000 18 Rp540,000
50 mangkok listrik bh 3,000 25 Rp75,000
51 Outlet data setara Panasonic bh 150,000 1 Rp150,000
52 Outlet telepon setara Panasonic bh 125,000 1 Rp125,000
53 pager balkon m 450,000 3 Rp1,350,000
54 Paku 10 kg 27,000 5 Rp135,000
55 paku 5 kg 25,000 7 Rp175,000
56 paku 7 kg 27,000 5 Rp135,000
57 Pasir beton m³ 280,000 35 Rp9,800,000
58 Pasir pasang m³ 285,000 24 Rp6,840,000
59 Pemasangan kusen almunium dengan 2 daun pintu multiplek; asesoris unit 4,750,000 1 Rp4,750,000
60 pengeboran air m 200,000 24 Rp4,800,000
61 pintu pvc kamar mandi 1 bh 338,000 1 Rp338,000
62 pipa 3/4" btg 36,000 10 Rp360,000
63 Pipa 5/8" btg 14,000 45 Rp630,000
64 Pipa freon AC m1 64,000 12 Rp768,000
65 Pipa PVC 4” btg 150,000 4 Rp600,000
66 Plafond PVC Gypsum lbr 85,000 33 Rp2,805,000
67 reng atap btg 38,000 33 Rp1,254,000
68 Saklar setara Panasonic bh 45,000 12 Rp540,000
69 Sealent tube 35,000 4 Rp140,000
70 Semen nat kg 15,000 5 Rp75,000
71 Semen Portland Tiga Roda sak 55,000 350 Rp19,250,000
72 Shimizu Mesin Pompa Air PC 503 BIT Jet Pump 50 Meter PC503BIT bh 3,280,000 1 Rp3,280,000
73 Shower bh 274,000 2 Rp548,000
74 Skrup dus 80,000 4 Rp320,000
75 solarflat Bening Tebal 3mm m2 520,000 2.5 Rp1,300,000
76 Stop kontak broco bh 40,000 12 Rp480,000
77 Stoper pintu bh 100,000 1 Rp100,000
78 T dus bh 8,000 20 Rp160,000
79 Tee 3/4 bh 6,000 6 Rp36,000
80 Toren penguin 550 L unit 1,685,000 1 Rp1,685,000
81 washtafel TOTO bh 655,000 2 Rp1,310,000
JUMLAH MATERIAL TOTAL 2292 Rp173,240,000