You are on page 1of 56
Projet Tile ANNEX “A TERMS OF REFERENCE Design & Build Inrascture Projects ‘Design and Build of Infrastrusture Projet: PHASE PROPOSED NEW ‘CONSTRUCTION OF BUILDING IS Projet Deserption 1. Proposed Construction of New Building Phase Location + Departnest of Health Compound, Tayuman cor Rizal Avent, Sia, Cn, Mania 1. INTRODUCTION ‘A. Background and Rationale Parsuant to the Guidelines for the Implementation of Health Facies Enkancement Program (HFEP) FY 2019 ofthe Department of Health te Health Feclities and Services Regulatory Bureau (HPSRB) in its objective to tansfer toa new building in view ofthe safety eoncems ofthis office, has identified a location ‘within the Department of Health Compound for the propored constriction of such facility. While the quility of regulatory services is dependent on the conition of the physical faclitics available for the HFSRB Personnel, infastrcture resourees for this office mast be carefully safeguarded and mainaiced through appropriate fanding among others in order to meet the Bureau's medium to long-erm goals in general and health institutional objectives in particular, trough intensive capital dutlay and reglarinftastracture funding programs. In this light, the HFSRB is developing an lnfrastrocture Project entitles Phase J Proposed New Construction of Building 15 Specific Objetves: To engage the services of Design and Build Gener Contactor 1. To prepare the Schematic Plans fr the abovementioned pret; 2. To prepare the complete Detailed Architecture] and Engineering Design (DAED) of the project (I" to 4 Floors) based onthe approved scheme pins bythe ends, 3, Toprepare and submit othe end-asr the final Bill of Quanitis including the Detaled Esmaes for evaluation: PROJBCT REQUIREMENTS ‘A. Preliminary lnfomstion Studies for Design and Construction, PROJECT COMPONENTS. Site and space planning were covcepusizeé by the HFSRB and Health Failty Eshancoment Program technical personel and governed by the sandards, rules and eglationsen the design of | Level 3 hospitals as presribad by the Department of Hath and oer concerned agencies Building design shall conform othe provision of the National Bulding Code ef the Plippines (FD 1096), Philippine Green Building Code, « Reforal Code of PD 1056, Accesblty Law (BP 46), National Sirctural Code of the Pilppines, Elecial Engineering Law (RA. 7920), Mechanical Engincring Law (RA $336), Plumbing Code (RA 1375, 1993-1994 Revisions), Fie Code (RA 9514) ane! her laws and regulations covering enviroumental concerss and local ‘ordinances and repulations A. ProDetiled Design 1, Bagineering Surveys ad Investigations ul Survey and investigations ofthe site includes boundaries ofthe property, -levatons and contours (05m inerva), si tess, loction dimension, oor elevations and other pene data on existing buldings and improverent (toads parking ares, mature tees) apd exsing uit ines (x, water, power, telephone). 2 Design Development Drawings 2a Preparation ofthe following drawings fo design develcpmet based on the schema plans prepared by the DOH i.» Perspective View ii Foor plas, two @) sections and four () clevons, including ‘complete space allocation. B, —Detied Design 1, Preparation of the following Detailed Design Drawings (see DOH Checklist of ‘Drawings Requirements based onthe Design Developnent Dravings and Design Params eile Architectural Plans (refer to Checklist of Drawings Requirements and Design Parameters). eile Structural Plans (refer to Chesklst of Drawings Requirements sand Design Parameter). © Detiled Electrical Plans (refer to Chesklit of Drawings Resuirements ang Design Paramcter) 4. Detaled Hleetenic Plans (refer to Checklist of Drawings Requirements and Design Parameter), © Detaled Sanitary Pans refer to Chess of Drawings Requirements and Desiga Parameter). £ Desied Mechanical Plans (refer to Checklist of Drawings Requirements and Design Parmeter) 2 Strctural Computations, Soil Boring Test Ress and Seismic Analysis (ifappicahle) snd Elsa! Design Computations General Notes and Technical Specifctions deserbing type and quality of materials and equipment to be used, manner of constuction and the steal condition under which the project is tobe constructed. i. Detailed Bill of Qualities, Cost Estimates including a summary sheet Indicating the wut prices of constuction mates, labor rales abd cuipneat rca, Summary of Works Consstion ‘As rule, contact implementation guideline for procurement of infastucie projets ‘hal comply with Aaace "E” and guidlines forthe inpfemeattion of contacts for ‘DESIGN AND BUILD snfasmere poet bl comply wath Annex "C of RR, RA ‘9184, The following provisions shall suplement thee rocedres 1. No works shall commence unless the contractor has submitted the prescribed. documentary requirements and the DOU-HFSRE has given written approval ‘Work execution shall be ia accordance with reviewed and. approved Aocuments 2 The comractor sal be responsible for obtaining all necessary infomation as ris, contingencies an ebercrcamstanees which may alec the work nd hall prepare and submit all necersary documents specified bythe concer Building ‘Oficial to met all regulatory approvals as specified inthe contrat documents 3. The contactor stall submit a detailed program of works within fourteen (14) calendar days afer the issuance of the Notice te Comupeace for approval by the proc entity ha shal plage, among others The ower in which it intends to cary out the work nsuingasiipatd timing for ech age of design detailed engineeing and construction, saree Periods for sevew of specific outputs and any other submissions and approvals, Sequence of timing fr inspection and tests General description ofthe design and corsiraton methods tobe edie [Number and names of persnnel tobe assigned fer each stage of the work List of equipment equred onsite foreach stage ofthe work ad Description ofthe quality consol syste tobe utized forthe projec, Any enor, omitsions inconsistencies, inadequacies or failure scbmited by he ‘contactor hat do not comply withthe requirements shall be retied, esabmited la reviewed lhe contrasto®’s cost. the contractor wishesto modify and desi ‘r document which hasbeen prevowly submited, reviewed and approved, the ‘ontacor shall noly the DOH within a resoaable period of time and sill Shoulder th cos of sch changes Asaul, changes in desig and constuction requirements sal be lite ony ‘hose that have not been intcipated in the contact documents prior to cortct signing and aproval. The following guidelines shall gover approval fo charge ‘ration ender Change Orders resting fom design errs, omissions or non ‘conformance withthe perfomance speiieatons an parameters and he fonact documents by the comractor shall be implemented by the ‘coniacor tno additonal cost othe DOH, Provided that the contactor sutTrs deley enor incurs eos due to changes or evors inthe DOH perfomance specifications and parame, the contraor shall be ened ether one a the folowing: 1. An eatesion of tine for any such delays under Section 10 of | ‘Amex "E" of IRR (RA S184); or 2. Payment for such costs as specified in the contact doeumets provided, a the cumulative amount athe variation order does Dov excesd ten perce (10%) othe orga projet cost “The contract documents shill include the manner and schedule of payment specifying the estimated correct amount and instalments in which he ‘contact wl be pi “The contractor shall be eliled 19 advance payment subject to the rvs of Section 4 of Annex "EIR (RA 9188), ‘The DOH stall define the quality contol procedures forth design and ‘constriction in gourdance With the DOR guidlines and shal issue the ‘proper cercats of seceptance fc sections ofthe works o whole ofthe ‘works as provided fr inthe contact documents. “The coatacor shall provide sll nacesary equipment, perscane instruments, doeumeats ad oes to cary out Hpected tests. ‘This design and build pats shall have @ minimum Defects Labiity Period of ene (1) year after contract completion or as provide fr inthe ontact documents. This s without prejudice to the abies imposed ‘pon the engneefereitect who drew up the plans and specication for building senctoned under Soation 1723 of the New Civil Code of the Prilppines. ‘The contr hal be held ube for design ang sacral defects andor failure ofthe completed projec win the waranty period of 1S yeas fer ‘pemanent stucuesTuldings as specified in Section 622.32 of the RR. (easis4) IV, IMPLEMENTATION ARRANGEMENT. a Reporting Protocol 1 Contact Persons Health Fale nd Any: Nicolas B. Lotero IL Services Regulsory Barer Director IV Rodalio A. Pineda Engineer 1V Jun Jorge 0. Soriano Eoginee It Reynaldo B. Rabe, Jr. ‘Avehitec ‘Teresa M. Salgado Administrative OBcer1V Heats Fait Leonia P. Gorgolon, MD, Program (HFEP) ‘MITA, MCHIM, CEO VE Dineetor1V ric A. Guorrero ArchitcetIV ‘Ar. Rowell. Reyes DMou ‘Ar: Louie Jesper Sho F- Molina Dou ELIGIBILITY REQUIREMENTS: A Basic U ‘The eligibility requirements for Design and Build Scheme shall comaly with the applicable provisions of Sections 25-24 of IRR of RA 9184 A modified set of requirements iterating eligilty documents ad rtria for infrastructure projects and consling services shal be adopted in accordance with ‘Annex G ~ Guidelines for he Procurement and Implementation of Sonvacts for Design and Build Inistuctare Projects Annex “Gof IRR of RA 9184 ‘The Design and Build Contractor sust have completed projects in be emeunt of at least fifty percent (50%) and mst have the network nd rescue in ple to ‘mobilize the Design snd Build Services, Be Speciale ‘The Pre Dealed Design and Desiled Design potion ofthe contract must be dene byan eligible ens seit or arcitetural Sr witha oil vesure areal ‘withthe Bidder and withthe minima numberof professionals as described been Project Coordinator i. Licensed Architet or Engineer si, At les 10 years expesence in overall project mnagement 1H Super oral and writen communication ski, organization sil snd ‘excellent administrative abilities Architect, i. Lisee Architect, Jil Preferably witha eat S yours experince inofie building design and related projects fi, Proficient nthe use of Autocad softwares © Structural Civil Engineer 4. Licensed Civil Engineer 4, Profeably witha lest $ yes experience in office building design snd elated projects fi, Regular Member or Fellow of Association of Strustuel Engineers of the Philippines iv. Profciet ia the ute of Autocad softwares 4. Flectical Engineer i, Licensed Professional letrcel Engineer ii Preferably with atleast § years experience in office building design and seated proiecs| fi, Proficient inthe use of Auovad softwares Paso vn vu. Mechanical Engineer {License Profesional Mechanical Engine |S Preferably wi atleast years experence in office building dsm and elated projces ‘i Proficient nthe use Autocad softwares Sanitary Engineer iL Licensed Sanitary Engineer ii Preferably at les $ years experince in office building design end related projecis fi Proficient nthe use of Autoad softwares ‘CAD Operator (preferably one fr architecture and ane for exch ‘coginecing special) i. Atleast with Bachelor's Degre in Architecture or Engineering fi Proficient inthe use of ALIOCAD softwares LIST OF MINIMUM EQUIPMENT Equipment Capacity Number of Units Grinds 20240¥ Two 2) unis Welding Machine n0.240v Two @) unis Electr Dail o20v Two 2) unis Circle Sav n0240v One unit Aceiykne Spray Gun ‘Ai Campressor 20240 One (1) unit PPROVED BUDGET COST ‘The tal Approved Budaet for the Contract forthe folowing Design & Bild Proj is Thy Five Millon Pens (PAP!5,000,00.00) forthe Proposed Construction of Building 15, Phase TIMEFRAME, ‘The Dsign an Build Conactr is required to complete the Project within an indicative periods shownbelow, to star upon the contractor's recip ab sgning ofthe Notice to Proceed. The tine Frame o be followed forthe project ia allows: Desiga and Construction Schedule: ‘Months TS ee oe saps pee estore Detailed ad Desien Application and + Issuance of| ‘Ballding Permit Construction 1X, MINIMUM REQUIREMENTS FOR CONSTRUCTION SAFETY AND HEALTIE 8. Seneral Requirements ‘No Contactor or subsorttactor shall quite any employee to work in surundings or ander working conditions that are unsanitary, hazardous, or dangerous to his heath or safe “ponder to meet this geneva quirement, the contactor mt |. Ivete and maintain progres (writen or oder) o comply with this gener requirement, Provide frequent and regular inspections ofthe jb sites by competent persons. ‘+ Conpetent person means one whe is capable of eying exising and predictable azar inthe surroundings or working condition which are tmssniary, hazardous, or dangereus to employees, aad who is suthorzationo prompt camesive measures to eliminate them, 3. robbit the use of any machinery, to}, meri or equipment that is nt in ‘compliance wih applicable requrenents. 4. Pent only those employees adequately tined to. operate machinery of ‘auipment. 5. Provide waning fr ll employees in ‘+ Recognition and avoidance of usaf conditions © Workplace safety and health requirements + Applicable hazards, safe handling, snd persons! proteive equipment ecessry for handing poisons attics, Namanables, and ober haul beances relevant other job ts, ‘© Specific hazards and procedures for enseing confined spaces if applicable acto u 2, Provide provisions for meal care and fit eid, Deselop an ffs fire protection and prevention pln -Bnsre appropriate houscheeping measures including cau walkways and removal of eombustble sera and debris. Reir the wearing of pproprite personal protective equipment such as bird ats saflry glasses, steel oe shoes, or ether appropriate protective equipment in sll eperaons wher thee i an exponie to hazardous conditions Develop an emergency action plan covering designated actions employers and cenployees must ake to casure employees safety fom fire and other amerper. ‘+ Plan mst bein writing for employers wit greater than 10 employees ‘+ Allempioyees must be tained upon inka assignment onthe pats of ie plan the employee need o know in the event of an emergency. Provide access to hand washing fice, tiles, and an adequate supply of drincing water. Provide safety and health signs the are clearly visible to construction worker std publ Conduct epuar safety meting, ero supsEcT ARCHIITECTURAL DESIGN PARAMETERS 1. Codes and Standares ‘The Architectural Works shall bein acondance with the following Laws, Codes and Standards “Laws and Codes: [National Bulding Code ofthe Philippines (PD 1086) and is Lats and Amended IRR. 2.Philippne Green Building Code, A Referal Code of PD 1096 ‘3RA.9266 or Architecture Law abd is Latest and Amended IRR “4 RA 4226 or Hospital Lisenting Act and its Latest and Amended IRR SIBP 344 or Accessibilty Law and its Latest and Ameaded IRR. {6.AO 35, 5.1994 er AO Petiing to the Carrol of Radiation Hara TVRA 9514 Fire Code of the Philippines {8 Existing Local Cade and Ordinances, And other Laws tat applies tothe projets + Standards: 1: Buress of Produc Standards (BPS) 2 Underwriters Laboratory (UL) S:DOW Technical Guideline for Hospial & Health Facies Panning and Design General Drawing Guldelines 1. General + _Alldrawinge sal be computerrafled. Drawings bl be submited both in pinted snd elearonie copies ‘+ Keep the same oretion forall plans, The no ovenation shal be indicted in all schiceural Noor pans. The oienation ofthe architectural plas shall be consistent ‘ith all he engineering plans. + Existing buildings and new works shall be cles indicatd and label in the site plans. ‘+ Detaled pans shall havea selene smaller than: $0 mater + Spot detailed plans, elevations, and sections shal havea scale not saller then 1:10 4+ Avoid notes suchas ‘se architectural dai or see stetura”. Always eer wih a ‘allot tthe speci detail crowing end sheet umber. 2 Site Plans ‘+ Thesite plans sal ave scale no smaller than 1: 400 meters 4 Floor Plone ‘+ Allplans shal be 1: 100 meters. The same sae bill be ued forthe rest ofthe. architectural, structural, sanitary, plumbing electrical and mechanics pans, except foreach trade's site pan, died plans and spot dt ‘+ Elevation cllouts sb be indicated onthe flor plan and sll be consistent with the clevtion drawing. ‘+ Section in callous onthe floorplans shall be consistent withthe Secon dawing. ‘+ Flor lass be incated with boxed room callout mumbers icing the aout {or oor finishes and wal fish. ++ Foor elevation shall be indicated inthe floor plans. This shal ben ference tothe ritual grade line or the established finished floor lines ofthe adjning existing buildings ‘+ The location of mechanical eqipmest, eg, ar condoning shall be indsed inthe ‘floorplans. This shall be consistent withthe mechanical and elec plan, + Door callous sll be cies with the proper numbering, e, D0 ‘+ Window callous shall be hexagons with he proper numbering, eg. WD 4. Elevations and Sections ‘+ Finish oorlines and top of tus lines halbeconsset inal te elevations, etions snd structure pans and details. 5. Reflected Ceting Plans eet Reflected cclng plans shal be indicated with boxed room callout munbes including the allow forcing Finishes snd pine Fore Ceiing bight rlative and in reference tthe ish Noo ine shal be inate inthe reflected cing plas in each rom with boxed dimensions. This so ersue thatthe ‘celing heights fal eos ar established whether or not flected in he etions “The description and location of the fixtures, eg lighting, snake decors, sir condition vens, exaust fans, inthe reflected ceiling plans shall be corset wth the clectial nd mechasical plans, 6 ReofPlans ‘Location of downspouts shal be indicted in the oof plan, 7. Doors and Windows & Details Works Door and window schedules shall indicate the type of oor or window, th numberof sets, the location's ofthe dor or window, te materials and accesories eluded and ster special specications, eg. color or fish, Provide # minimum of one (1) bay sstion ofa sale not sale then 1 50 meters for each major bulng prelerably cut along the area with speil sonsrction design Provide spot det plans, elevations snd sections of sale not small han 1:10 ‘meters for special designs with astate westmeat and ornmeniton Provide desi plans of sale nt smaller than | 50 forall ares nesting pater, ‘eg lobby, corridr, enuance walk, showing the positon snd pattem ties. Centerlne location of plumbing fixtures shal be indicated in deta plan with Lines of releece andi coresponding dimensions. Thit ist indicate the exact locations of the plmbing/santarysoughing-ins “+ TheMastr Site Development Plan ofthe Office Building sal ineude the folbwing: a Contour and survey ofthe lt, including bearing and distance ofthe bili perimeter line Road network and curbs and sidewalks Parking spaces iappliable) Reference lation of exiting tes (if applicable) Reference location and footprint of existing buildings, withthe coresponding builng rames snd dimensions, inching distances between adjacent buildings, od istarse beeen buildings and the nearest propery line {Reference loeation of ilies, ef, water eerie, epic tank, wastewslrrestmnt plant, powerhouse, transformer, waste slomage are, security utpets + Theeshall be separate road network und enryesit forthe public andthe service vehicks, eg, waste collection vans, delivery ticks, SD so ara + Timited ot areas, bllings should light and ventilation f applicable. + Covered walkways shal be provided fo acces and connection tthe new andthe exiting ‘iin. ‘+ Ramps forthe disabled shall be provided in all main entrances ofthe buiding and other acces openings to walkways leading to adjacent bangs ‘Building Architectural Works 1 Floor Plans ‘© The suctu sanitary, plumbing, elecvcal and mechanical designs are requiredto refer tothe architectural plans and specifications in ease of discrepancies. If an ‘agincring desig wil hve any possible conflict or interference oa the architectural desig, the lamer may be adjusted provided thatthe aestbetc value all not be comproaused ‘+ The architectural and engineering plans sal be consistent all houghout in tems of dimensions aad loeaions of colusas, beams, walls, roofline, conduit, dt, pips, ‘ad fitures, among others, Calm and bet grid lines shal also be consistent in all he archtectura and engineering plans + Verity and coordinate flor pins withthe mechanical, electri and sanitary deen with regard othe equrements fr mechanical rooms, AU rooms, eleetical rooms, pipe chase, and ther engineering resureeas, + Publetoilts shall hve provisions and fares fr perone with seit a requied ‘by BP 344 If enough space allows eles specially made and designated for persens with abit is preferabe. 2 Walls + Exeor waist RST weir AD ik. Ti is indicative of the finished wall thickness including the plastering and tile works. etic I be 3 oF Tow, Toilet wales sal bo ‘+ Layout sod work on wall and lor ils must be ligne, plum, level and square . a an a ‘© Tilecolor and design shal be approved fist before instalation, Floors + Flee fish for ofc areas shal Be "hal ove upwards fo the sides of te wall up fe 8 the lor, ‘+I for tiles in wo adjacent rooms with diferent material, color or design meet athe oot opening, the cat shal be located middle ofthe dor thickness when in closed postion, Pvc SERS ‘+ Flor atthe openings of tiles for persons with dsbity shal be sloping. Indicate inthe plans an ston + Thesizof ameter or below. Tet oor les sal ‘quire meters India the ile pater. 4+ Thesize ofthe kitchen panty or less OBER. Indicate tee pattem, + These ofthe footie oft depending onthe proportion tote sze ofthe oor ate the le pater. peeeeees FR eee eee ‘+ All edges, comers and intersections of toilet tiles, sal be provided with polyiry ‘hl te tins ‘© Tilecolorand design shal be approve fist before installation. Ceiling Works Cetin high fae wh pei ast resent. ty, conference roms, teining rooms, excive offer, shall be pogo fo tec Tora cr 25 ‘equa y Oe Sniper Howe, is sea iis acoustic boards on aluminum Tzuners wouldbe used forthe eng, layout should be oncenter an isless tha (Gamera Cee wn sic in poe pte in away to break the redundancy, Provide deta, Soft of extcorbans sd bes! SNe damage de to tater sping note eves orecing, Section eae al Rerauted wo show the dnp mou 5. Doorsand Windows ee (Gos a do eee oy hal at Tie anther wt a hl ae pli hie SEiucsuocues te ould pve SER SEER Color regurene ote Fac Cotte Pay GEE 6s 60: Door finish en color shall be approved fst before application CRRA: >< GRATIS t0 provers damage to windows and at due to water sippage. Seeuon dil stall be required to sow this slope, All doors of @EGSEESEREI or sha SRSA and as required by the Fire Code ofthe Pipe. th no moulding/casing installed on cone walls stall have Provide dts. All door and windows shal hive reinforced concrete intel beams. Provide details. 6 Stir, Ramps and Coridors Ramps for persons wth disci hal! bo SESSA Hondas sd clearances shall eon with the reguement of BP 344 ‘The two (2) stirs shall have risers <0 re Wie (enim). Roth snr shal he fet ae fre encnetes and Se any ‘penings exces forthe dors with builtin panic hardware, it be GOWN, Clearances sh conform with the requirements of he Fire Code of ‘he Palppises Corin lc CAE SSNSRSOOEE be sss clear fom the surfce ofthe finished wall and not om center of te rough CHB wal. CCoriers and exit doors shall confor wit the requirements ofthe Fire Code ofthe Plipines. 17. Fisturesand Accesories the fost andthe top of the stars per lec AEDS ae ones y SASS lecrcl switches and outs sll be iste pmb ad love, Public toilets shall always be provided with {SORDID 1d electric ae GRAB shat always be proviced with TIED conformity to the requiem of BP 344, RE sit be provides fo TAMMIE. Likewise, spit: {ype air-conditioners located in the interior pant ofthe bulding shall beso Toctod adjacent to areas with drinage lines, eg. tlt, downspouts, balconies, 8 Roxfng Works RTSRSSERHER sie nae of cel Soweto thatthe oveow of water wil be diected ouside of the building end not towards the ‘eves or interior cling to prevent ay damage. Provide deals. jin oof design. But in cases require in aesthetic design, valley or inside guters shal be :SISESIGESSSRSHE with membrane {ype waterproofing, ad the section hall be designed with a eat fo big volume to prevent any damage due to overflow. Provide deals, st be designe to sate the preceding purameters, Provide deals The pe of te 0! OSES recor 9 Painting : Se cee. + LD SAAD cy ms Speier ice piles eee eee ‘+ Paten:-related coms, ep emergene rooms, out patin departen and wards, bal bein an-bactrial and odor absorbent pi finch + Special rooms, e. operating rooms, delivery rooms, and laboratory shall ls bein RRR! wet msc ceseantseplt ae red past Hash, leduted or soot, unless otherwise specie, ‘+ Paint olor and sade shall be approved frst before appicstion. V. Specific Requirements Provide SPOON PRHISHOR fe owing: Ger, eaves, and parapet Ceiling ~ covelight, special connections and design, mouldings, valances| Stirs“ hana and balstraling desi ‘Ramps - nda design ad lear pater Doors, windows and gates - ile works, Special Architectural Treaties and Design, eg, foyade design, special window snd oor, counterinuse sation counter 7. Special Carpentry Works, eg, parttions cabinetry 8. Other details as may bereguted Provide Room Data Shets, including detaled floor plan :ellng plan and sections of ‘the following rooms, in coordination with the requiremens ofthe electrical, sanitary ‘and mechanical designer 1. Office ares, ncaing fixtures an ots wih spcife dimensions ofthe loetion of fures and accesories, edn coordination withthe requirements ofthe electrical and mechanical engineering design 2 Confereave Room VL Summary of Materials eet + Materials to be used shall be Sresesstat, nontoxic, moisturoresisanr and teite- resistant eg fiber cement or gypsum boar, igh gauge sel fame, polity! elerde or Slaminum compote eng panel + Wetareas, eg toilets nd Kishen sll use ron-kidnon-lip vite ceramic lor ies + Heavy wai eeas, eg lobby, and coidor shal use heavy-duty seamless granite Noor ‘es or higher typ of foor materi ‘+ Vinyl lor ites for areas ike offices hall be homogenous and not less 2 thik, + Ramps and stars shal use nonshidlnon- ip loo ties, materials s specie. + Aluminum T-runers sal be powder coated + Metal rod angers with adjustable cis, and not galvanized iron wires, shall be used to support and suspend the shuinum T-runnee and light guage metal fring + Roofing sets shill be Ga 24 aluminum coated, pre-painted, and pre fmeed long-span sheet VIL Draving Requirements: Sc atached DOH checklist of deawings, ‘SUBJECT: _ DESIGN PARAMETERS (STRUCTURALICIVIL WORKS) TL. Codes snd Standards ‘The Civil'Structural Design shal ein acordance wit the following Codes and Standards 1 Nasional Strtual Code of the Pilippines (NSCP) 2015 2 National Building Code of the Philippines and its revised IRR 3. Accesbilty Law 4. Local Codes and Ordinances © Standards ‘Bureau of Produc Standards (PS) Philippine National Standards (PNS) DPWH Ble Book ‘Aetian Concrete Intute (ACI) ‘American Society for Testing Materials (ASTM) 1 ml. 6. American Welding Society (AWS) Site Works asd on Mase Site Development Plan ofthe bildng, provide where applicable complete des sd desl of sidewalks (concrete with curb and gute, ncuding drainage) network, walkways parking areas and fencing. 1. Thesmin road shall be capable of two way tfc at east Gs. width) with minimum ‘hicknss of 150mm (8 inches). Comer strength shuld best least 3000p. lterioe ond (adizg to suppor facilities) shall be so designed to arcommodate delivery vehicles, sod fire us incase of emerpeny. 2 Walkway shoald beat lest 100mm th with eonerete strength of250psi, Ramp shold be provided instead of steps, fr any change in elevations. 3. Parking ara slabs should be at leas 150mm hk with concrete strength of 3000p. 4, Fencesshould be se through infant ofthe hospital while the Tee (3) other sides sould ‘be conse hollow blocks with minimum height of 2 meters and to be provided wth pecimeer lighting, Secthrough fence design wll be made of 32mm square bars spaced, 100i: on center and provided with tree (3) cnerete hollow block (5mm hgh zoelo wall Buildings 1. The office building should be designed using scismic imponance fctr of 1.50 fr lsmedte occupancy category. Buenas shoud be designe in acordance with NSCP Reguirenets up to Magutude (70:ME&.) for those new sels sauce Type * Seismic gap between buldings (ld an nen) shouldbe propery observed 2 The office building should be designed also wsing wind importance factor of 115, (cspecily for design of tussesoofiag system) or Wind pesste fom wind Maps bad fon NSCP 2015 (whichever is higher). Concrete gutters and parapet walls should 3e provided ab additional prosetin ote rofig system drig ong typhoos 3. Soil imetipation mumber of bored bole required by NSCP 2015 should be conducesto etemine sil bearing capacity abi recommended foundation design (apcebleevea Sor one sty strut), 4 Thestuctral designer is encouraged to use resistive ad non-tonie material I. Details the follwing shal be provided: 1. Connection deals ofbeams and columns following the requirements of NSCP on confiand 2 Connection of russes to beams and columns reece 3 Splicing deals of reinforcing bars on columns and beams and he required bar eu pois ‘V. Summary of Materils Conerete shall be Portland cement and coterming o ASTM Speifieaton C150, Type 1 wT ype Conse Aggregates shal consis of washed gravel, rushed stone cr ook ora combination ‘hereof eoorming to ASTM C33. Concrete Hollow Blocks shall be a standard prodect of resogaized manufacturer conforming fo PNS 16 with test SODps strength, ‘Reinforeing Bat sll conform with PNS Grade 60 for 16mm dia, and above and PNS ‘Grade 80 for 2mm dia. end below. Struct scl shall conform with ASTM ASGIAGM Bolts and Studs hall conform with ASTM A 325 ‘Welding electrodes shal be 60 oF 0 and conform with AWS “VL Drawing Requirements: See tached checklist eee URIECT SANITARY /PLUMIB! ‘Codes and Standards “The Sanitary/Plumbing Design shall be in accordance with the following Codes and Standards. © codes "National Building Code ofthe Philipines and is Now IRR. ‘Unifonn Planbing Code ofthe Philppnes (UPCP) Fire Code ofthe Pilippines ‘Natcul Plumbing Code ofthe Philippines (NPCP) Sentation Code ofthe Philipines Existing Local Codes and Ordinances, ‘© Standards: Soe Site Works ‘Bureau of Product Standards (BPS) rilppine National Sundards fr Drinking- Water ‘Underwriters Laboratory (UL) ‘DOH National \ Laboretory (RL) [DOH HealthCare Waste Management Mamval [National Water Resources Board (WRB) [Nation Plumbers Assoestion of the Philippines (NAMPAP) Philippine Society of Soitary Engineers, Ic. PSE) ‘¢ Based on the Maser Site Development of the Hospital, tbe Site Works shall provide complete layout of the following: ‘Storm Drainage Nework, indicating Drainage Manoles and Pipe Culvert Sewerage Pipe Network, indicating Sewage Manhole, Sewage pipes and the Joeation ofthe proposed Sewage Treximent Pan; and ‘Water Supply Network, indizsting the location of Water Service entrance, Cisters, Hlevated Water Tek and proposed Pump House. ©The Storm Drainage Network shall ascommosste the magnitude of peak rates of surface sunoff ineluding drainage coming fom the buildings. The syste! sall be expable of ‘nding the design flows outing othe designated outfall; For rainfall alcultion and sing of drsinage pipes, refer to UPCP and curt rin record fom PAGASA, ‘¢ The Sewerage Pipe Network design shall accommodate all sewage coming rom all the ‘aces, conveyed by gravitational ow lading tthe proposed Sewage Testent Pan; Per capita wastewater darand: 280 galceialdsy per bed reer ‘The Water Supply Network shall include the provision of Fre Hyérans,accessble Drinking Fountain ha will serve as testing post for stead potable water supp Per capita water demand: 3125 galcapialday per bed Building Facies Sanitary/Plumabing System 1 Seweline nd Vent Syetern '© Provide complete Sewerlie and Vent System ftom sll omestie) plumbing ‘ixtres and foo rans, ad by gravity ow leading tothe Sewage Trestbent Punt cr) © ForDenand Weight of Faure: in Fiature Units refer to UPCP ‘Waterline Sytem (Potable water) ‘+ Provide complete cold water supply pipes tal plumbing fixtures. From he min water source the water shall be pumped tothe Elevated Water Tank (EWT) end onveyed tothe fours by gravity system andor dsibuted to fixtures by taser ‘pumped with constant pressure though 2 Paeunatic Storage Tank, whichever is ease ‘+ Prove complet Hot water ysem with portable weter heater for select Aras required and or specified by the Owner. Rain Water System (Non-Psable water) ‘© Provide spate waterline fr wate loses sal ural '* Provide separate water supply pipes to all water closets and urinals. From he owtnsout to non-poable water tankiisten the water shal be pumped to he levated Water Tark (EWT) end conveyed tothe Hxtures by gait system andor disebuted to fiues by transfer pumped with constant pressure thoagt = Pheu Stomge Tank, whichever is feasible, ‘Storm Drainage System © Complete Storm Drainage System shall be provided for all root, canopies, ‘concteteleges and balconies including condensate devine lid for gravity fw ‘conected to lenderfpip ine leading to the natal ground level tom dine etwork CCondensite Drain Air-conditioning Drain + Provide complete sir conditioning drain system for ll ir conditioning unit apo nearest lege leading to ston runage system as inde waste water connect provided with ai ap, or provide septate sero acommodae all si-condiionng pene Specific Requirements Summary of Materis Provide details of he following: 1. Grease Trap (fr Panes) 2, stern Tanks and Elevated Water Tanks Sever and Vent pipes; Unpasicized Polyvinyl Chloride (uPVC) extra sree 1000 (Confanning 0180 8683 ASTM D2729 including Trin and Fitings) ‘Storm Desinage pipes; Downspouts, Unplsticized Polyvinyl Chloride (uPVC) extra ses 1000( Conforming to ISO 3633 ASTM D2729 including Trims and Pings, HPS Cesta) ‘Desnage Pipes; 0mm da. and below, Non-Reinfrced Concrete Pipe (NRCDP) 300mm di, and above, Reinforced Concrete Pipe (RCDP) Drainage Mantle; Stet inlet, Cue ne, Traffic Type Reinforced Concrete ‘Area dain/Catch Basin, Reinforced Load Bearing CHB ‘Sewage Mankoles; Trafic Type Reinforced Concrete with Standard Ste Brss Cover ‘Westewster pipeline; Extra Heavy (XID Single Hub, Hubles Cast rn Pipes and Fitings (CIP) conforming to ASTM Standard 858 ‘Cleaouts; Cast ron Bras with cour suk pug (BPS Certified) Floor Drains; Conczled ype snes ste! ‘Deck Drains snes soe! (BPS Ceri) ‘ter Drains stines sel Dome Type Bass (BPS Cntited) Cold Waterine pipes for buildings, Polypropylene Ph25 Fusion Weld Pipes incluéng “Trims and Fitings (BPS Ceti) Hot Waterine Systems; fr buildings, Polypropylene Pn2S Fusion Wel Pipes incluéng ‘Trims and Fitings (BPS Ceti) ‘Trench Grating, GalvanizedStainless Ste ron grates Plumbing Pxtures including Tris, Pitings and sccessories; (BPS Certified) 2) Water Clost-Tank Type Dual fash push buton 1) Lavatory(Semi PedevllCounter Type) wih C-spout spray faucet ©) Kitchen Sink- G6 Stainless Sto sexless bow with drain board and gooseneck facet ord 4) Urina-Wall bang Flush valve ype ML Drawing Requirements: Se atached DOH checklist standards based on Revised IRR of the Natienal Buldig Code ofthe Pilppines (PD 1096) eens SuBsECT MECHANICAL WORKS DESIGN PARAMET Codes and Standards ‘The Mechanical Design shal be in secrdance wit the olloing Codes and Stands = Codes: 1. National Building Coe ofthe Philipines and lis New IRR 2) Fite Code ofthe Philippines 53. MechiniealEnginering Cade ofthe Philippines (ME Code) 4 Exising Local Government Coes and Ordinances, © Standards: "Bureau of Product Standards (BPS) i 2. Philippine National Standards (PNS) 3. Underwriters Laboratory (UL) and Factory Murs] (3) 44 Internationa Electrotechnical Commission IEC) 1988 SS. National Fire Protection Association (NFPA) 6 Natoma Fire Protection Association (NFPA) 99 Standard for Health Cae Feclits 1. American Society of Heating, Retigetion and Ai Condiiosing aginees (ASHRAE) 8, Centr fr Disease Cortland Provension (CDC) Manu Automatic Fire Sprinkler System ‘The automatic fre sprinkler sytem shall be composed of complete plans and drawings ofthe iallowing 1. Site Development Plan and Vicinity Map, indatng the location ofthe bullings, Grewater reserve tank, Rrewater line, yard logpand private fie hydrant. 2, General Notes, Legends sod Symbols including Schematic Diagram ofthe Fie Spiakler System and Schematic Diagram of Alarm Montoring Syste 3, Floor Layout and Isomers Layout ofthe Automatic Fire Sprinkler System indicating pipe ‘izes and the location ofthe pipes, valves, sprinkler beads, ser nipples, fire ose eabines, “sprinklermain ier, dain pipes, ros sin, braneblnes, inspector's test conection, hagers ad say braces. Equipment Schedule, Detail drawing, Sre paps jockey pump lay. ‘Atcitecural, Stucturl, Electrical and Plumbing dravings of the Firevater tank and ‘+ An automate tre sinker shall be provided in all hospital bung except for those fire resistive one (I) storey hospital building ‘+ Hazard Classification sll be Light Hazard Occupancy. 1 ates of coverage shall be 146 square meters ad water density stallbe 407 Iss 1+ Protection aea pe sprinter eed sale 20 square meters at 2.2 eters minim distance between sprinkles and 42 meters maximum spacing m. Ww. +All oor corral valves stall be equipped with supervisory switch, water ow dette end din sytem ‘+ Water supply shal be hoizontl slit cas cenrfogalKeepump with dese engine ‘or AC moter anda vertical indie jockey pump with conlle. + Firewater reserve tank shall he ground level monolithic concrete tank sized fer @ ‘minim of 30 mines, ‘+ Hyezaulicealculetions report shal be based on NPEA-T3 format ‘Ventilation and Air Conditioning System ‘he vettion and air conitoning syste shall be composed of complete plas aad drawings of the flowing 1 2 a General Noes, Legends sn Symbols inching Schematic Diagram ofthe Veatlstion end ‘Air Conditioning System Floor Layout ofthe Venilaion and Air Conioing System indicating the capacity and locaton of he sr eandiioners end fans. act layout indiating duct sizes, route and location ofthe dampers, ditfses, rerun ait regise, hangers and sway braces. leg png yet ising pie ss, ostn of ves tans nd oxy Equipment Schfule and Details drawing of Ar Conditioners and Venilting System. ‘+ Aicontoning system shall be provided in conference, Trsining ane LT. Server rooms ofces and other areas Whee conditioned airs necessary ‘Cooling Loud ealcalatons report stall be manual or computer generted, hourly sali program stich inches heat trsmission coefciens, solr best gin factors and corected cooing load tenpersture ference calculations + Split ype ar conditioners wil be uted res with larger capitis such athe RCED, QAMD and SDD Staff Rooms, Training and LT. Server Rooms ad for ‘other areas sila in ize. ‘+ Window type air condtoners shall be ute in areas with exterior wall exposure. ‘Centralized airconditioning wil be wed only itfeasible. {Design fall rita reas sal be laminar postive pressure, wheres the nippy airs 10% move than ext ai, 1 Ceiling csseue type exaust ans with integral air ser shal be povided in ll toilets Celling fans, exbit type with 360° osilation shall be provided in ll non air onditioed roms, uch as Stal, Public and PWD toilets, Supply and Equipment ‘Rooms, Records, Photocopy Room, levator Sytem ‘Theclevatristem shall be composed of complete plans and drawings of the fellowirg 1 2 General Notes, Legends and Symbols incloding Schematic Diagram. "loot Layout, Elevator Shaft Plan and Machine Room Plan. Peron 2. Eauipment Schedule, Dsl drawings and Baulmest ayo. 4 Arhitectural, Stoctral, letra and Plmbing drawings ofthe levator System, ‘+ Omi building ype elevator shall be provided in all mul-storey hospi bilines ‘+ Theminimum cr size shal be 100mm wide and 250mm long. ‘+ Thee door opening shall be not les than 100mm and 2, 00m high Summary of Materials 1, AUTOMATIC FIRE SPRINKLER SYSTEM 1 The frepunp shal be UL Listed FM Approved, diesel engine or electric motor even, designed specially intended for an automatic witer sinker protection system. '. The ckey pump shall be UL Listed FM Approved, lec metor driven, 220V, Sophie, 60ers and electric power conaevtion. « Shrinkler hea shall be UL Listed/FM Approved, pendent, upright or sidewall unt, 83 LPM flow capacity per end and temperature sing at 975° Co 74°C. 4. The alarm assembly shall be UL ListalPM Approved, emstrcted and isalled that any flow of wale rom he sprinkler sytem equl ter geste ha ha rom the single automatic head shal resltinan audible and visa signed inthe vicinity ofthe bling Alin and supervision system of the automatic water speaker sal nelude the ‘monitoring water ow switch at each floor ofthe building, ite pump and jockey pump running condition and power supplies, level of walr inthe rexesvoi and onto valves Pips shall bo BLL Schedule 40. Screw ftings shall be usa for inside piping 2._ AIR CONDITIONING AND REFRIGERATION SYSTEM. 4 Retigern pipes shall be copper tubing ype Lor K backsta pipe, Schedule 40 forsize of 100m diameter and smaller Pipe over 100mm sl be black ses pipe Schedale 40. Black stcl pipes shal be standard seamless, lp-velded, or electric resistant ‘welded fr size of Som diameter and larger, crew type foe size 38mm ameter and smal, fitings for copper tubing sill be east tronze fing designed expres for bszing Pipe insulation shall be performed fiberglass or ts equivalent. The ioslaing materials shall be covered with 100mm x. Hmmm thick rolythelene fm, which shal be ovelaped not less than Sora 4. Dict hal be galvanized shea tee of eandard gauges Ductwork insulation materials hal be gi board made of syropar or equivalent 25mm thick for ground and top flor, 13m thik fer intenedite oor. 3, ELEVATOR SYSTEM err ‘4 Theoific levator sll machine room ess traction type only 1B Theslevatareytom shal he TTF Apres ML ‘Requirements: See atached DOH Standard Checklists based on Revised IRR of the ‘Navona Building Code ofthe Pilippes PD 1096) End of Scheme Pa 2c LECTRICAL DESIGN PARAMETERS 1. Codes and Standards “The Elewrical System Design Parameter sal bein accordance with he flloing Codes sn © Codes: LL" Philippine Electrical Code 2. National Eletial Code 5. Fire Code ofthe Philipines 4 National Building Code ofthe Philipines and Ks New IRR 5. Manual on Practice in EtBiient Lighing Existing Local Codes and Ordinances 1, Bureau of Product Standards (BPS) 2. Underaters Laboratory (UL) 4. National Fire Protaton Association |4 International Elctotecniesl Commission (IEC) 5, Mluminaton Engineesng Society (ES) 6. National Elesrical Menafscrre's Assocation (NEMA) 7. DOH Manual en Techical Guidelines fr Hosptial and Heal Facies Planang and Design H.Site Works [Based on the Master Site Development ofthe building the Site Works shall yrovide complete _lecrial layout ofthe following Substaon/Power House othe new proposed sire. KVA rating and otber specifications of Tansfonne. Switchgear requirements Panelboaré Layout lecrical Metering Devices Service Conductors nd Condit Layout Grounding Sytem Emergency Standby Genertors ‘Soe and Perimeter Lighting Sytem MI, Building Facies Rletreal System Le Lighting System ‘+ Prove and install adesuate normal branch eves for Lighting System al ares using the stondard Ligiing Design Analysis. Uilize the sadard Mumination requeemens pe area of concem using the prefered particu type of Iuninares, 2 PowerSystem ‘Provide and install adequate normal branch circuits forthe Power System. 3. Stendhy/Emerpeney System + Prove and install adequate Life safety and tital emergency ranch ccs for lighting or ization equipment connected fo the dtermate power saree, 4. Ausiliay System ‘Provide nd intl the fllowing Auxiliary System 2) Communication System Telephone System Local Area Nework System Public Addres Pging System. Private Braneh xchange (PABX) ‘+ Mesteror Cable Antenna Televison 1) Fire Alam Sytem ©) Security System 5. Lighting Protection System ‘+The building lighting protection system shall iscude roofnounted air tenninals wounding conductors, ground rods, condus, clamps, and auxlary equipment 3s required fora complete ae operation lightning prtetion system Provide Details ofthe following: Lighting Fixes Laminar Pnelboord end Cui Breakers Switchgear and other Metrng Devices “lecrcal and Hospital Equipment Istalation and Termination of Auxiliary and eter Special Devices and Equipment Powe and Telephone Handholes (as may be required) Pedestal and Service Enirance to Bldg. Grounding System Layout lectriel Rooan Others as may be required. Cope Sumamary of Materials 1.Geseral Lighting Luminars:Fiatures type shal be as indeed onthe Lighting Layout Plan, ‘> Downlights and Pinlighs shall be of heavy gauge spun aluminum equipped with lamp as indicated on the drawings. ‘© Use LED Slim Panels Peewee Use of LED Lighting systems + Other Special Lighting requirements shall be as approved by the implementing agency, +Other Specie Lighting requirements shall be as approved by he implementing agency 2.Wiring Devices: Wising device hal be nom automatic contol devices the contact is guaranteed ‘bythe pressure ofthe special spiral sings. «Sorte shall be of 16A, 250V or SODV except as etherwse noted and approved ‘Terminals sal be serev-type or quick-comnested ype. 1 General we receptacle sal be 16A, 240V grounding type uns otherwise inieted con the drawings Special purpose rcepacis shall be as called fron the drawings. Matching pgs shall be supplied ‘Panetoerds and Circuit Breakers: The Paneboard and Circuit Breakers shal be equipped with ‘molded-cse circuit breakers and sal be the ype a nested in pancboud schedule snd deta 1 Provide molded-case circuit breakers of eae, trip ating and tering pacity as shown on the drawings. The cireit breaker shill be qubkemake, quick break, ‘therralsmagneti, ripindcaing ad shal have common tipo all multiple breakers ‘wih remap mechanism. ‘+All cuenccanying pars ofthe panelboads shall be plated. Provide solid neural (GIN) assembly when required. Te assembly shal be solated fm the enclose 4.Eletrical Conduits, Boxes and Fitings: All conduits, boxes and fitings hall be saad gid sted, in coated or galvanized. ‘+ Rigid Stel Conduits (RSC) ~for main feeder on each floor 1 Intmdiate Metal Conduite (MIC) ~all xian system ‘+ Unplascized Polyvinyl Chloride (uPVC) if required shall be schedule 40 ~ for clowrical branches, ‘S.Conductrs: Wires and cables stall be of the approved type and unles speifed or indicated ‘otherwise al power ad lighting condoctrs shal be insulated for 600 vols ‘The condsetors used inthe wiring system shal be of soft-armcaled copper having 2 conductivity of not les than 98% of tat of pure copper and insulated for 60 °C Temperatures + Alleondits of convenience outlets and wiry or lighting wanch eet homerans ‘hulle wire with a minimam of 3.8 mam square in se (Master Antenna Television (MATV) and Cable Television (CATY) System ‘Two sources of TV signals shall be provide tothe building, One (1) shall be fom a ‘aster antenna natalled atthe ro or within a suitable aes the building and the ‘other wl be fom commercial cable television service. ‘+ The master antenna system sll consist of FM, VHF and UNF antennas, combine, istbution amplifier, conxal cables, spits, pots and TV cutlets. the quick ‘brown fox jumps over the lazy dog by the bank ofthe iver ‘Thee shall beinividual tanking for master antenna sd abl leison ring inthe ule. *7Siuctred Cabling & Telephone System: Arminiuan provision fr etiated S00 mixed PABX eatension and diet. telephone lines shall be requie fr tertiary hospitals. "Fina deals ofthe system shall follow specific requsemens, quantity and ype of | ‘Fite Detection and Alan Syste: ‘TheFiee Detection an Alenn System shal be of multiplex, micrprocesse-cotolled aresable, alarm and communication syste ‘The system shall consist of full integration automatic fire detection, voice alam communication and fre Hightrs elephone system The systen stall consist of eontol sation, mine pane! intting ant indicating devices, cmtol modules and system of wires ‘Actuation of the prtetive signaling system shall occur by manual pall stn, !utomate smoke or heat detetr, sprinkle low switch and tamper switch ‘The system shall be ale to monitors the satu of flow swithes and superisoy switches isalled atthe Sprinkler System risers. These monitaring ots ae also ‘dcesabl or the eonversionsl zonal nthe same way asthe detectors ae making ‘them easily recognizable atthe contal pane ‘Occupant notification shall be accomplished auomaticaly. Noteation will e ‘general audible alam type complying with appropriate section of NFPA. The sysem shal be installed with provisos for future comnstion to the ears re services ston inthe locally. 9.Secury System: ‘The Securty sytem sal include inmsiondeetion and alarm, CCTV, socess contol ors may be requie Drawing Requirements: Sce tached DOH Standard Checklists based on Revised IRR ofthe atonal Building Code ofthe Pilippins (PD 1096) Bad of Scheme emt (Checklist f Draving Regenesis he rpaasoleahuaton/aprval fDi Aritc ad Englrig Pl ander Docume fr intatre Poet Inleneatin, efwnce: Reid plementng Rae Reps of he Neto Bung Coe ft Pipi PD 18) Prose ARTES BN aa eect, Ste Depent an Vis Mapa (0 Ka Rai Toe | Fier nD i) nig ios ya Toa (oases Ge Om minis) Toe Secs Ge 0m i) aT "as Fa wig ow te im cng ee pe a ea agin ima ag ee ‘if in repel a Gale Se aig eae online Wal a0, esp an Det Tees (0) cig mere lene Gen hc Hoon ‘eas op ds Fas Gee TS a a pas ae Det fp bay an gos Ga TSO) Denial pcceons50=) mie ml Io ae oS ws aN es ee ISU ang pe a ‘Scns owas ee 5) ig ea aa key peente Chest of Drowing Requiem isthe preparation aluaoa/pproval of Dele Architect ead "gine ln nde Docent forint Projet Inpleeition Ieervce; Reed imple Rus ed Rghnion fh toe Bang Caf Phones PD 1086) Press: UNRER SHEET CONTENTS [REMARKS* "ARCHITECTURAL INTERIOR DESIGN DRAWINGS as psiaIe) [ID=Tia a) — | Flor Plas showing yout of or Hass eae 1100 eis) ‘ADT (@-8) | Flor Plane showing pet of friarelinaking pres, cab fie: 100m sie) ‘ID—T(@.) | InkeorFiation =n Seciner owing wall po eg st, ae 100m ii TID=¥ia-a) | Deals of Fartons, Caines, Fara, Cling ad te aio Design estes ale -100m minim) 7AID=Sia a} | Arete Perpetvels “eee ner Desi Tesla Sess daha or Dein Soe of Wes ‘Aiea irr Dein Bi of Que + Folemurdads ate Cophingo Hon Comping Complore by vate efi with sparing comnts aoa ss J) lah: ‘Checks of Drawing Reuienents inte preparonivauton/ sora of Dead Architect and Engine Pl odor Dockets for ItractuePoet plement ference: Rese non ale nd Replat ofthe Nao! ung Cote of he Plies (0 1056 suet NUMBER SHEET CONTENTS REMARKS" "ELECTRICAL DRAWINGS a plea) E=1pa) | Gene Noe and Lepeds EZ) —| Coston and Sit Fas E=3p.-8) | Lighting Layout (eal £100 mininon) acing Js B= 3) | Power Laoat Gene 10 minimus) eli cet E=Sp..a) | Aus Sytem Layout eae 100m mina) ncn as 6 ..n|_| Scedlend Det of Loads Tiga) [is Digre F860) —| Ofer Deal Biel Compan Design Aas “Bice Tec SESSION Elstical Scope of Wars “Hise Bl of Quaner 4% Tobemarted as ether Comping or Non Conpying Compete o Incomplete by the evaluator 010 Def with supporting comment ae atonal sees neces) ‘Boat ‘Chects of Drawing Requirement inthe preprint approval of etal Archer and Enpneeriog Pans and ther Domes fr nase Poet pletion crn Ree inpmening Bet ad Resa fhe Neto ug Cob of he Ppnes (PD 186) sueer NUMBER SHEET CONTENTS| REMARKS* [ELECTRONICS DRAWINGS ape) EGET (ea) _| Goma Noes and Lape | ECE = 2.8) | Lectios wd Se Piss ECE 3(..n) [Aviary Layot eal 100 mininan elaing die TL Fre Alans Syem 2 Pasig Syste 3 Telehons Sta TAN Sem SCATUMATV SS CCTV System 7 fasens Con TSE 5. Boing Management Se EE=a ew | Bee Dagon ECE= Ste) | Oter Dean ison T echnical Speiicaton ElsonicrSeae of Waris Elsa Bil of Guaies + Tobemartad ihr Comping or Non Comping Complete or Icompltby he vitro 2 filed with apport comment (ue atonal shot seer) vaunted by gets Checks of Drawing Resumen in he preparn/aluson/proval of Detsied ‘Avchecal end Eainera Piss an te Documeas fo Infuse Pres Inplemesaton ‘ere: se oponning let nd Repose Mao Blin Coe the Pipi 1086) ‘HECTANICAL DRAWINGS papgia I= Rca al Note and Lene, Sie Doc en Fi Loan Fa M=2{e2) —] Pr Pinan Doings Gn 10m niu) dowrg Vain wa HSE) — | fr Pieslionete Dens Gee 10y inna) o Arcane Spenser OTE | Hse Pnstaonene Des (ste [tia siiman) of Fi Sen ‘Syn fwspler net ound ey snipe erm HSE — [Dass Weer an Flom Dg THI=Sis- | —[ Desir Fieve Sel Seer Gl =e} [Det of ets le =e.) [at er Mine Bien T= MoS) | Lew emer Eo aa ETTORE haa Teal seein ‘Misi Spe Ware ‘Msi Bf Que + Tohemartad at iter Campo or No CamphingiCogie or compe yh ecaerote fi ith morn comment eon Ysa) beady: ee ac (Checklist of Drawing Requirements inthe prepratico/evalutionapprval of Deiaied Archiesaral and Engineenng Plans and other Dosurens for fasiinre Proje: lplemetation Reference: Revised inplementing Rules and Regulations ofthe National Buldng Codeof the Philipines (PD: 1096) Projet Loeion SHEET CONTENTS| REMARKS" ‘STRUCTURAL DRAWINGS Cr appisBa] (Geter Notes el Consraton Sasa Sie Developer Pl Founisies Plan (le 1:00am For Faniag Pan's ele 100m isi) Roof Framing Pl Gale 100m muna) ‘Sebel nd Del of Fotings nd Coen ‘Sel bd Dtal of Beare 8 For Sab Denil of Tres aes ‘Dein of Sas, Ramps, Fe Es ‘Oe Spot dts ‘Staal Analysed Design ‘Being snd Land Tet Rel Semis Amis Stra Total Spica Sractral Scope of Works Sraetral Bil of Quis 5 Retemurs ex ity Complying or Nom Crying Campo Inst by he erator or 2 bested wh aproting comments ue odo sheets sar) coe ens (Check of Drawing Requirement inthe prepretionlvaluaton/sproval of Deiled Architectural and Engineering Plans and other Document for lnfrasrucre Proec lnlemetation| Reference: Revised Implementing Rules and Regulation ofthe National Buling Code ofthe Philipines (PD 1096) Projet Locwioe ‘SHEET ‘PLUMBINGISANITARY DRAWINGS ar pIESET PET al — | Gare Notes and Leer P=2(a..a) | Cosson and Se Po P=3(@..a) | Storm Drainage yout (ae 110 ics ang wal a ‘fapping line to Mia Dsiape Lite FF Ga) | Waterine Layout Gesle 100 ina lang al gio ‘apna ise om main water oar when applable FS a) | Sewertine and Vent Layout fee F100 nimi) Reg a length of pin line ops uak or exiting smesine FOG a | Alreoudldoniog Drata Layout (Cals har mamma) TORRE cal gh of gp ie tre waste connection FT) — [ema avon wig atin, sf eT P=B(a.-a) | Detlef corms, ct bass, ‘P=S (a) — | Dea of Sop Tank See Tretie! Fas Neti Ta Dasa Ais Seta Tec Spe ‘Sina Seog of Works Bi of Quasee a ANNEX“ PROIECT PHASE PROPOSED CONSTRUCTION OF BUILDING TS Location DOH COMPOUND, TAYUMAN COR. RIZAL AVENUE, STA. CRUZ, MANILA’ OWNER DEPARTMENT OF HEALTH. FUNDING [HEALTH FACILITIES ENHANCEMENT PROGRAM 2019 (HFEP SOURCE 2019 FUND + PHP 35,000,00.00, “ALLOCATION sumsect SCOPE OF WORKS. A. GENERAL REQUIREMENTS 1. DETAILED ARCHITECTURAL AND ENGINEERING DESIGN SERVICES. 4 The ArcitecUDesigneiContractor stall prepare the complete Detaled Achtectural and Engineering Design (DAED) for this Project from the Ground to Fourth Floors in reference tothe schematic plas prepared by te end-user (Signed and dry-saled) fm: 1). Schematic Design Phase. 2) Design Development Phase 3) Construction Phase 4) Post~ Construction Phase (As Built Drawings). “This also inchs preparation of 1) Tecnica! Spesitestions. 2) Scope of Works 5) Billof QuanttiesDeailed Estimates. For Architectural Works, Civi/Structural Works, Electrical & Awilary Work, Plambing/Sanitay Works, and Mechanial/Fire Protetion Werks, 2. PURMITS, LICENSES AND TAXES Design Analysis 1) Structural Analysis, 2) Boring and Pat Loud Tests 3) Seisme Test », Bing Permit ©. DENK Clearances {4 Fre SaferyFvalution Cerificate. 3. CONSTRUCTION PHASE ‘Consrution of Phase I sal be confine to the apen pace between the BOHT {Gyranasis and Bung 6 and shal not afet bot adjacent bling Moving-in and “Mobilization sal comuence after he asuance of Notice to Proce (NTP). » 2 2 a 3 Demolition of covered pking areas (Constrvtion of Tenpeary Facilites and Ui. “Temporary fies shal include bu ot inte othe felowing items: 2) Stoel Ofc - sal be at least 4.0m x 5.0m in arc tse designed by the Arctestngineerin-Charge. The std olflee sal be of wooden éemnstucon with 9m (34°) thick plywood Boring 12mm (1/2 thick wed sings and partons, Ga.2 comopsted voting she on wooden Frames sd nut chides sanitary flee. Fd oe sl be provide with let two (2 ofc tbe, ene (I) ceafing tbl, ax (6) eis, oe (1) actors fig cabin, sic: for plans end fee supe, eng ‘entlion ster, Tesolé be lestd to sid ooding ring wet eon 1) Workshop mechous, tock ares nd sorage format, trent, Spars, fel do bat no way pos ae hazard tothe premises ©) Coostocion camp for hosing a0 accomadation of Conssor's 4) Werke fetes inulin puble water supply, elise! over ‘eure, dsm, ege ops saitaion fit i ree olson, temporary fees an arcades en fe protein fie. “The contactor upon recipe ofthe notice to proces shill immeditly mele tnd transport his machinloqupment, matedals and employees to the ste and

You might also like