Professional Documents
Culture Documents
ITEM NO:09 Fixing of Rock Bolts Length in RMT Total Qty in Cum
ITEM NO:09 Fixing of Rock Bolts Length in RMT Total Qty in Cum
ADIT 02
ADIT 03
ADIT 02
Length Total Qty
S No Description Ch From Ch To Nos
in Rmt in Cum
ADIT 03
ADIT 04
ADIT 03
ADIT 04
ADIT 03
ADIT 04
ADIT 03
ADIT 03
ADIT 04
ADIT 03
ADIT 04
ADIT 03
ADIT 04
ADIT 03
ADIT 04
ADIT 03
ADIT 04
ADIT 03
ADIT 04
ADIT 03
Total
Length
S No Description Ch From Ch To Nos Length in
in Rmt
Rmt
1 Left Tunnel-U/S (L3) 15025 15000 12 4.00 48.00
15000 14975 8 4.00 32.00
14950 14925 40 4.00 160.00
2 Left Tunnel-D/S (L4) 16700 16725 50 4.00 200.00
16725 16750 60 4.00 240.00
16750 16775 70 4.00 280.00
16775 16800 60 4.00 240.00
ADIT 03 TOTAL 1200.00
ADIT 04
Total
Length
S No Description Ch From Ch To Nos Length in
in Rmt
Rmt
1 Left Tunnel-D/S (L5) 18320 18295 24 4.00 96.00
18295 18270 28 4.00 112.00
18270 18245 26 4.00 104.00
18245 18220 30 4.00 120.00
18220 18195 26 4.00 104.00
18195 18170 24 4.00 96.00
18170 18145 25 4.00 100.00
18145 18120 28 4.00 112.00
18120 18095 30 4.00 120.00
18095 18070 28 4.00 112.00
18070 18045 28 4.00 112.00
18045 18020 24 4.00 96.00
Left Tunnel-D/S (L6) 19570 19595 55 4.00 220.00
19595 19650 50 4.00 200.00
18410 18435 16 4.00 64.00
ADIT 04 TOTAL 1768.00
Total 4008.00
ADIT 04
Total
Length
S No Description Ch From Ch To Nos Length in
in Rmt
Rmt
1 Left Tunnel-D/S (L5) 17840 17815 14 4.00 56.00
Left Tunnel-D/S (L6) 18475 18500 20 4.00 80.00
18500 18525 8 4.00 32.00
18525 18550 6 4.00 24.00
18550 18575 26 4.00 104.00
18620 18645 18 4.00 72.00
18645 18670 9 4.00 36.00
ADIT 04 TOTAL 404.00
Total 1076.00
ADIT 03
Total
Length
S No Description Ch From Ch To Nos Length in
in Rmt
Rmt
1 Left Tunnel-U/S (L3) 14850 14825 6 4.00 24.00
14825 14800 50 4.00 200.00
14800 14775 36 4.00 144.00
14750 14725 30 4.00 120.00
2 Left Tunnel-D/S (L4) 16800 16825 60 4.00 240.00
16825 16850 60 4.00 240.00
16850 16875 50 4.00 200.00
16875 16885 20 4.00 80.00
ADIT 03 TOTAL 1248.00
ADIT 04
Total
Length
S No Description Ch From Ch To Nos Length in
in Rmt
Rmt
1 Left Tunnel-D/S (L5) 17170 17200 20 4.00 80.00
17200 17230 20 4.00 80.00
17230 17260 35 4.00 140.00
17260 17290 35 4.00 140.00
17290 17320 26 4.00 104.00
ADIT 04 TOTAL 544.00
Total 544.00
ADIT 03
Total
Length
S No Description Ch From Ch To Nos Length in
in Rmt
Rmt
1 Left Tunnel-U/S (L3) 14850 14825 6 4.00 24.00
14825 14800 50 4.00 200.00
14800 14775 36 4.00 144.00
14750 14725 30 4.00 120.00
2 Left Tunnel-D/S (L4) 16800 16825 60 4.00 240.00
16825 16850 60 4.00 240.00
16850 16875 50 4.00 200.00
16875 16885 20 4.00 80.00
ADIT 03 TOTAL 1248.00
ADIT 04
Total
Length
S No Description Ch From Ch To Nos Length in
in Rmt
Rmt
1 Left Tunnel-D/S (L5) 17170 17200 20 4.00 80.00
17200 17230 20 4.00 80.00
17230 17260 35 4.00 140.00
17260 17290 35 4.00 140.00
17290 17320 26 4.00 104.00
ADIT 04 TOTAL 544.00
Total 544.00
ADIT 03
Total
Length
S No Description Ch From Ch To Nos Length in
in Rmt
Rmt
1 Left Tunnel-U/S (L3) 15135 15110 25 4.00 100.00
15110 15085 22 4.00 88.00
15085 15060 26 4.00 104.00
15060 15035 30 4.00 120.00
15035 15010 35 4.00 140.00
15010 14985 30 4.00 120.00
14985 14960 32 4.00 128.00
14960 14933 29 4.00 116.00
14933 14910 30 4.00 120.00
14850 14825 31 4.00 124.00
2 Left Tunnel-D/S (L4) 16250 16275 25 4.00 100.00
16275 16300 24 4.00 96.00
16300 16325 28 4.00 112.00
16325 16350 26 4.00 104.00
16350 16375 25 4.00 100.00
16375 16400 25 4.00 100.00
16400 16425 28 4.00 112.00
16425 16450 24 4.00 96.00
16450 16475 23 4.00 92.00
16475 16500 25 4.00 100.00
16500 16525 21 4.00 84.00
16525 16550 27 4.00 108.00
16550 16575 22 4.00 88.00
16575 16600 21 4.00 84.00
16600 16625 17 4.00 68.00
ADIT 03 TOTAL 2604.00
Remarks
25
25
25
25
25
25
25
25
25
25
25
25
25
13
25
25
25
25
25
25
25
25
25
25
25
45
Remarks
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
10
Remarks
Remarks
Remarks
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
15
15
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
Remarks
Remarks
50
25
25
25
25
25
25
25
25
25
25
35
25
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
HEADING BENCHING
R1 12060 12185 12000 12250
12410 12415 12475 12575
12440 12500 12871 13295
13114 13200
13275 13295