PRIVATISATION OF SUNGAI BESI— ULU KELANG
ELEVATED EXPRESSWAY (SUKE) 5
fuyoue gp Se earome eminem | fl
Que IP Serene ISUKE
NON-CONFORMANCE REPORT
iasor ten re te
Package: CA ——Tcaton Pi S6 PIS THOR no: SUKEICAINGRI g)3 Ref Dos
‘A. Description of non-conformance
T1Cwi& Siuctwe C) Environmental C) Salely&Heath Cl Traffcmanegement Bj Others... (MBE)
Basod on our site inspection on 31% March 2022, we found that the copper rod installed at Pier $6 P13 hit the sub-
‘main cable for street lighting feeder pllar FP/SL2 (A8). Kindly be informed that you have proceed the intallaton of
‘Copper rod without issuing RFI and caused the damagerfaut to the sub-main cable. Please refer attached photos for
your easy reference.
Teale corection works “Target completion dao: 272072
—Teser(Suparvang Consul =o
Tenter Confined by (CRERRE) nection (ose
Name :IclahamHamsy 8 Moho On | Nene: Mr Koh Tak Cran Name
Desionaion Resentrgreer | Desgraton: Resort Engnost Desgnaton
Sorte soramre 2 A. Sorat
ate sdocz2 ste zon xe
'B. Technical review
Foot causa (WPC to dont) =
Proposed long tem coxectvelprevenive action ( CAR PAR tobe proposed by WPC and approved by SC )
“Targot Date:
Appeared by SCY
‘Action by (NPC) Taeniior ‘Veifed by (CREE)
Name Nano Een | Nine
Designton Designation Desigraton
‘Slontro von | Slate : sovnmee | Sante
ate ate 5 | ate
. Verification
‘cual CARIPAR completion dole: CCARIPAR effectveness: YESINO(*)
Vester REIORE Endorsenent
tame Name
Designation Destanaton
Slonatre Sire
ate Date
NOR STATUS: Close (YESINO) "NO efor now NOR Rel. Ne
> REFN ATQP SESE eerRmancsoverw ean
PRIVATISATION OF SUNGAI BESI- ULU KELANG
ELEVATED EXPRESSWAY (SUKE)
NON- CONFORMAN ICE REPORT
of