You are on page 1of 1

1.

Determine total equivalent traffic load at the end of project period of 6 years with average annual traffic growth
rate od 4 % for following vehicle structure for road with two traffic lanes and dimension the pavement structure
for all three types if default:
CBR=6%
AADT=8000 veh/day
LOAD (kN) OCCUPANCY
Vehicle Real load EQUIVALENT
Axis Own load Payload % fe Fe AADT
types (kN) LOAD (kN)
Front 33 14    
B 65      
Last 67 26    
Front 37 25    
HT3 70      
Last double 37 120    
Front 30 20    
Last 20 80    
HT2+T3 70      
Front 17 59    
Last double 23 81    
Total equivalent daily traffic load (kN)  
Total equivalent annual traffic load (kN)  
Total equivalent traffic load at the end of the project period(kN)  