EC-1
LONG LIFE
ENGINE COOLANT
REQUIREMENTSJur
CATERPILLAR INC.
LONG
URLEDLINE HO 781 P0324
LIFE ENGINE COOLANT REQUIREMENTS EC-1
10
1
INTRODUCTION
BACKGROUND
HEAVY DUTY ENGINES HAVE SPECIFIC ENGINE COOLANT REQUIREMENTS TO ADDRESS LINER
PITTING, SOLDER BLOOM, SOLDER CORROSION, AND SCALING IN ADDITION TO FREEZE
PROTECTION, HEAT TRANSFER, BOILOVER PROTECTION AND METAL CORROSION CONTROL.
‘THE INOUSTRY HAS FOR MANY YEARS TYPICALLY RECOMMENDED THE USE OF A FORMULATED
ETHYLENE QLYCOL-BASED PRODUCT IN COMBINATION WITH A SUPPLEMENTAL COOLANT
ADDITIVE (SCA) TO SATISFY THESE REQUIREMENTS. IN THE EARLY TO MID EIGHTIES, HEAVY
DUTY ENGINE MANUFACTURERS BEGAN TO RECOMMEND THE USE OF LOW SILICATE
CONTAINING ENGINE COOLANT (I.E. - ASTM 04985) IN COMBINATION WITH AN SCA TO REDUCE
PROBLEMS FROM SILICATE DROP-OUT. IN 1885, CATERPILLAR INTRODUCED A TRUE HEAVY
DUTY ENGINE COOLANT REQUIRING NO SCA WITH INITIAL FILL OR COOLING SYSTEM MAKE-UP,
BUT NEEDING MAINTENANCE DOSES OF SCA EVERY 250 HOURS. THIS PRODUCT, AND OTHERS
PRECEDING IT, REQUIRES REPLACEMENT AFTER 160,000-240,000 KILOMETERS (2000 - 2000
HOURS) OF USE TO REMOVE SPENT INHIBITORS, CORROSION PRODUCTS, AND CONTAMINANTS
FROM THE SYSTEM.
CATERPILLAR IS NOW INTRODUCING A NEW HEAVY DUTY ENGINE COOLANT WHICH REQUIRES
NO SCA AT INITIAL FILL OR WHEN MAKING UP A LOW COOLING SYSTEM, REQUIRES AN
INHIBITOR ADDITION AFTER 3000 HOURS, AND REQUIRES REPLACEMENT AFTER 6000 HOURS.
THE ENGINE COOLANT IS FORMULATED WITH INHIBITORS THAT DO NOT DEPLETE AS RAPIDLY
AS TRADITIONAL INHIBITOR TECHNOLOGY, THE ENGINE COOLANT EXTENDER (ECE) REQUIRED
TO REINHIBIT THIS ENGINE COOLANT CONTAINS LOWER TOTAL DISSOLVED SOLIDS THAN
CONVENTIONAL SCA'S TO REDUCE THE IMPACT OF SOLIDS BUILD-UP ON LIFE OF THE SYSTEM,
THE DESIGNATION GIVEN THIS TYPE OF ENGINE COOLANT FOR USE IN ALL CATERPILLAR
ENGINES 1S “CATERPILLAR EC-1". PRODUCTS MEETING THE EC-1 SPECIFICATION
REQUIREMENTS ARE EXPECTED TO PERFORM EXCEPTIONALLY IN MOST MOBILE EQUIPMENT
AND STATIONARY ENGINE APPLICATIONS INCLUDING GASOLINE AND NATURAL GAS-FUELED
ENGINES.
THIS DOCUMENT DEFINES ALL OF THE REQUIREMENTS THAT AN ENGINE COOLANT MUST MEET
TO BE MARKETED AS A PRODUCT THAT MEETS CATERPILLAR EC-1 REQUIREMENTS,
CATERPILLAR WILL NOT MONITOR OR APPROVE ANY PRODUCTS MARKETED UNDER THE EC-1
DESIGNATION. EACH INDIVIDUAL SUPPLIER IS RESPONSIBLE FOR THE QUALITY AND
PERFORMANCE OF THEIR OWN PRODUCTS INCLUDING ANY ASSQCIATED LIABILITIES,
FLUIDS ENGINEERING
CATERPILLAR INC.
ENGINE DIVISION
P.0. BOX 619
MOSSVILLE, IL. 61552.0510
Usa
PHONE (309) 578-6142
JuN-27-1997
15:22 303 692 s51¢vues ager va OP
CATERPILLAR INC. EC-1
LONG LIFE ENGINE COOLANT REQUIREMENTS
LVI FY eo:
1.2 OBJECTIVE
THIS DOCUMENT IS INTENDED TO COMMUNICATE THE MINIMUM REQUIREMENTS FOR A LONG
LIFE ENGINE COOLANT AND ENGINE COOLANT EXTENDER INTENDED FOR USE IN CATERPILLAR
ENGINES,
1.8__GENERAL DESCRIPTION
THE CATERPILLAR EC-1 REQUIREMENTS ARE ORGANIZED IN FOUR SECTIONS: PHYSICAL a
CHEMICAL PROPERTIES, COMPATIBILITY CHARACTERISTICS, SENCH PERFORMANCE. TESTING,
AND FIELD TESTING.
1.4° SUMMARY OF REQUIREMENTS.
PHYSICAL AND CHEMICAL PROPERTIES (SECTION 2)
ETHYLENE GLYCOL-BASED SOLUTION PROPERTIES
PROPYLENE GLYCOL-BASED SOLUTIONS PROPERTIES
ENGINE COOLANT EXTENDER PROPERTIES
WATER QUALITY
COMPATIBILITY (SECTION 3)
ENGINE COOLANTS.
ENGINE COOLANT EXTENDER
WATER,
BENCH PERFORMANCE TESTS (SECTION 4)
FOAMING
GLASSWARE CORROSION
SIMULATED SERVICE,
WATER PUMP CAVITATION
HOT SURFACE ALUMINUM CORROSION
FIELD TEST (SECTION §)198717224 UALUOLINE HO
CATERPILLAR INC.
LONG LIFE ENGINE COOLANT REQUIREMENTS
20 PHYSICAL & CHEMICAL PROPERTIES
2.1 ETHYLENE GLYCOL-BASED ENGINE COOLANT PROPERTIES
‘THE FOLLOWING TABLE IS APPLICABLE TO ALL ETHYLENE GLYCOL-BASEO SOLUTIONS
GONGEN | 50 VOL% | 60 VOL%
TRATE | aLycou | GLYCOL |
SPECIFIC GRAVITY, 155/155°O (ASTM O1122) | 1.110 | 1.058 | 1.068 |
1145 | 1.092] J.092
FREEZING POINT, *G MAX (ASTM 01177) 13 “38 51
BOILING POINT, °C MIN (ASTM 01120) 170 106 108
ASH CONTENT. MASS% MAX (ASTM D1199) 50 25 25
CHLORIDE, PPM MAX (ASTM 03634) 25 25 3
HEAVY METALS, PPM MAX (ATOMIC ABSORPTION | ' ;
SPECTROPHOTOMETER)
JUN-27-1987 15:@2 waa 692 s512sun
iow YALUOL I
CALERPILLAR INC.
LONG LIFE ENGINE COOLANT REQUIREMENTS
JUN-27-1997 15:21
_ - CONCEN | 50 VOL% | 60 VOL
TRaTE | @tycot | Gtycor
SPECIFIC GRAVITY, 16.6/15.5°C (ASTM D1 128) 1.035 1.035. 1,095
1.080 7.060 1.060
FREEZING POINT, *C MAX (ASTM 01177) “56 29 44
BOILING POINT, °C MIN (ASTM 01120) 170 106 108
ASH CONTENT, MASS% MAX (ASTM D119) so | as 25
CHLORIDE, PPM MAX (ASTM 09634) 25 25 25
GRAVY METALS, PPM MAX (ATOMIG ABSORPTION 3 : .
‘SPECTROPHOTOMETER)
CHEMICAL & PHYSICAL PROPERTIES
383 650 S510
exiriza VALUOL IIE HO
CATERPILLAR INC. EC-1
LONG LIFE ENGINE COOLANT REQUIREMENTS
2.4 ENGINE COOLANT EXTENDER
2.3.1 IF NEEDED, ENGINE COOLANT EXTENDERS SHALL BE FORMULATED TO REPLENISH DEPLETED
INHIBITORS OF EC-1 LONG LIFE ENGINE COOLANT AFTER 240,000 km OF USE SUCH THAT THE
ENGINE COOLANT PROVIDES ACCEPTABLE PROTECTION AGAINST CYLINOER LINER PITTING AND.
SORROSION FOR A MINIMUM OF AN ADOITIONAL 240,000 km (3000 HOURS) AS DEMONSTRATED.
BY THE FIELD TEST DESCRIBED IN SECTION 5.
2.9.2 THE FOLLOWING TABLE IS,APPLICABLE TO ENGINE COOLANT EXTENDERS FOR EC-1
[Sebient. MASS % () MAX 04
‘CHLORIDE, PPM (ASTM 03634) MAX 25
HEAVY METALS, PPM (ATOMIC ABSORPTION 6
SPECTROPHOTOMETER) MAX
JUN-27-1987 1s:
323 69a 9518 se P.e5saeT UALUOLIN
UAIEKPILLAR INC, EC 1
LONG LIFE ENGINE COOLANT REQUIREMENTS
24 WATER QUALITY ~
LE:
TOTAL SOLIDS. PPM (D1608) MAX 340
TOTAL HARONESS, PPM (D1 126) MAX 170
CHLORIDE, PPM (0612 OR D497) MAX] ad
SULFATE, PPM (D516 OR 04327) Max 100
pH, (01293) 55-90
Sa ES
CHEMICAL & PHYSICAL PROPERTIES
JuN-27-1997 15:10 323 69a ss1erete URLUOL INE HO
CATERPILLAR INC. . EC-1
LONG LIFE ENGINE COOLANT REQUIREMENTS
3.0 COMPATIBILITY CHARACTERISTICS
3.1 ENGINE COOLANTS
3.4.1 SCOPE
THIS TEST METHOD IS USED TO EVALUATE THE COMPATIBILITY OF THE ENGINE COOLANT WITH
OTHER ENGINE COOLANTS,
3.1.2 SUMMARY OF METHOD
‘THE TEST MATERIAL IS MIXED WITH ASTM 04985 ENGINE COOLANT CONCENTRATE CONTAINING
6 VOL% SUPPLEMENTAL COOLANT ADDITIVE, AGED FOR 24 HOURS AT 68°C, AND CENTRIFUGED.
TO DETERMINE THE AMOUNT OF MATERIAL THAT HAS PRECIPITATED FROM SOLUTION.
3.1.9 TEST EQUIPMENT
GENERAL LABORATORY BALANCE, 1 TO 2 kg CAPACITY
CENTRIFUGE TUBE, 100 mL CAPACITY PER'ASTM D1796
CENTRIFUGE CAPABLE OF MAINTAINING 500 ACF
CONSTANT TEMPERATURE BATH, 88°C
GLASS CONDENSER TUBE, APPROXIMATELY 5 mm 0.0. x3 mm 1.0.
RUBBER STOPPERS TO FIT THE CENTRIFUGE TUBE
GRADUATED CYLINDER, 100mL CAPACITY TD
PIPETTE, TO DELIVER 6 mL
3.1.4 MATERIAL
‘SUPPLEMENTAL COOLANT ADDITIVE (SCA)*
ASTM D4985 ANTIFREEZE CONCENTRATE
DEIONIZED WATER, TYPE IV MIN. PER ASTM 01193
NICHROME WIRE
CATERPILLAR 3°2044 COOLING SYSTEM CONDITIONER OR EQUIVALENT
07 SEP 94
JUN-27-1997 15:03 3e3 690 9510 98% P08CATERPILLAR INC.
LONG LIFE ENGINE COOLANT REQUIREMENTS
17 URLUOLINE HO
ans
3151
31.52
3183
an8.4
3155
3.1.6.6
B17
31.5.8
3.1.5.9
PROCEDURE
MEASURE AND ADD 30mL OF THE COOLANT CONCENTRATE TO BE TESTED.TO THE 100 mL
CENTRIFUGE TUBE USING THE GRADUATED CYLINDER.
MEASURE AND ADD 30 mL OF THE ASTM 04985 COOLANT CONCENTRATE TO THE CENTRIFUGE
TUBE FROM STEP 3.3.5.1
USING THE GRADUATED CYLINDER, MEASURE OUT AND TRANSFER 34 mL OF DEIONIZED WATER
TO THE CENTRIFUGE TUBE FROM STEP 3.3.5.1.
PIPETTE 6 mL OF THE SCA SOLUTION TO THE CENTRIFUGE TUBE. COVER WITH A RUBBER
‘STOPPER AND AGITATE THOROUGHLY.
REPLACE THE RUBBER STOPPER WITH A CLEAN AIR CONDENSER PREPARED BY INSERTING A
SHORT LENGTH (30 cm) OF GLASS TUBING THROUGH A PROPERLY SIZED ONE HOLE STOPPER.
IMMERSE THE TUBE TO THE LEVEL OF THE SOLUTION IN A CONSTANT TEMPERATURE SATH AT
‘88°C FOR 24 HOURS, INSERT THE ORY WIRE INTO THE CONDENSER TO THE BOTTOM OF THE
CONDENSER TUBE.
AT THE END OF THE HEATING PERIOO, REMOVE THE CENTRIFUGE TUBE AND SOLUTION FROM
THE BATH AND COOL TO AMBIENT TEMPERATURE (ALLOW AT LEAST ONE HOUR).
CENTRIFUGE FOR 20 MINUTES AT 500 ACF.
AFTER CENTRIFUGING, READ THE VOLUME OF SOLIDS IN THE BOTTOM OF THE TUBE TO THE
NEAREST TENTH OR HUNDREDTH OF A ml. AS APPROPRIATE.
ACCEPTANCE CRITERIA
ACCEPTABLE MATERIAL SHALL HAVE NO MORE THAN 0.1 mL OF DEBRIS COLLECT IN THE
CENTRIFUGE TUBE TIP,
JUN-27-1987 15:10 323 680 9518 38x P.22Jun yo 1Pt24 YALUOL INE
CATERPILLAR INC. EC-1
LONG LIFE ENGINE COOLANT REQUIREMENTS:
3.2 ENGINE COOLANT EXTENDER
3.2.1 SCOPE
THIS MATERIAL MUST BE COMPATIBLE WITH ASTM D4985 CONTAINING 6 VOL% SUPPLEMENTAL
COOLANT ADDITIVE AND CATERPILLAR LLG ENGINE COOLANT CONCENTRATES WHEN
EVALUATED ACCORDING TO THE FOLLOWING PROCEDURE.
3.22 SUMMARY OF METHOD
THE MATERIAL TO BE EVALUATED IS’ ADDED TO EACH APPROPRIATE ENGINE: COOLANT
SOLUTION AT 6 VOL% CONCENTRATION: AGED FOR 24 HOURS AT 88°C AND CENTRIFUGED TO
DETERMINE THE AMOUNT OF MATERIAL THAT HAS PRECIPITATED FROM SOLUTION,
3.29 TEST EQUIPMENT
GENERAL LABORATORY BALANCE, 1 TO 2 kg CAPACITY
CENTRIFUGE TUBE, 100 mL CAPACITY PER ASTM O1796
CENTRIFUGE CAPABLE OF MAINTAINING 500 ROF
CONSTANT TEMPERATURE BATH. 88°C
GLASS CONDENSER TUBE, APPROXIMATELY 5 mm 0.0. x 3 mm I,D.
RUBBER STOPPERS TO FIT THE CENTRIFUGE TUBE
GRADUATED CYLINDER, 100 mL CAPACITY TD
PIPETTE, TO DELIVER 6 mL
3.24 MATERIAL
ASTM D498 ANTIFREEZE/ENGINE COOLANT CONCENTRATE WI6% SUPPLEMENTAL
COOLANT ADDITIVE
CATERPILLAR LLC LONG LIFE ENGINE COOLANT CONCENTRATE, ETHYLENE GLYCOL-
BASED
CATERPILLAR LLC LONG LIFE ENGINE COOLANT CONCENTRATE, PROPYLENE GLYCOL-
BASED
DEIONIZED WATER, TYPE IV MIN. PER ASTM D1193
NICHROME WIRE
JUN-27-1897 15:03 303 sa ss10 sex Pon28 URLUOL INE HO
CATERPILLAR INC. EC-1
LONG LIFE ENGINE COOLANT REQUIREMENTS
ee
3.25 PROCEDURE
3.25.1 MEASURE AND ADD 60 mL OF THE COOLANT CONGENTRATE TO THE CENTRIFUGE TUBE,
$282 USING THE GRADUATED CYLINDER, MEASURE OUT AND TRANSFER 34 mL OF DEJONIZED WATER
‘TO THE CENTRIFUGE TUBE FROM STEP Dt
$253 PIPETTE 6 mL OF MATERIAL TO THE CENTRIFUGE TUBE. COVER WITH A RUBBER STOPPER AND
AGITATE THOROUGHLY.
3254 REPLACE THE RUBBER STOPPER WITH A CLEAN AIR CONDENSER PREPARED BY INSERTING A
SHORT LENGTH (30 cm) OF GLASS TUBING THROUGH A PROPERLY SIZED ONE HOLE STOPPER,
9.28.6 IMMERSE THE TUBE TO THE LEVEL OF THE SOLUTION IN A CONSTANT TEMPERATURE BATH AT.
Se FOR. 24 HOURS. INSERT THE ORY WIRE INTO THE CONDENSER TO THE BOTTOM oe THE
CONDENSER TUBE.
$2556 AT THE END OF THE HEATING PERIOD, REMOVE THE CENTRIFUGE TUBE AND SOLUTION FROM
THE BATH AND COOL TO AMBIENT TEMPERATURE (ALLOW AT LEAST ONE HOUR).
3.25.7 CENTRIFUGE FOR 30 MINUTES AT S00 AGF.
3.2.8.8 AFTER CENTRIFUGING, READ THE VOLUME OF SOLIDS IN THE BOTTOM OF THE TUBE TO THE
NEAREST TENTH OR HUNDREDTH OF A mL AS APPROPRIATE.
3.2.8 ACCEPTANCE CAITERIA
ACCEPTABLE MATERIAL SHALL HAVE NO MORE THAN 0.1 mL OF DEBRIS COLLECT IN THE
CENTRIFUGE TUBE TIP.
i DATE
JUN-27-1987 15:18 3e3 630 3510URLUDL INE HO
CATERPILLAR INC.
LONG LIFE ENGINE COOLANT REQUIREMENTS
33 WATER
33.1 SCoPE
THIS TEST METHOD IS USED TO EVALUATE THE COMPATIBILITY OF THE ENGINE COOLANT WITH
HARD WATER,
9.3.2 SUMMARY OF METHOD
THE TEST MATERIAL IS MIXED WITH 600 PPM HARO WATER, AGED FOR 24 HOURS AT 98°C, AND
CENTRIFUGED TO DETERMINE THE AMOUNT OF MATERIAL THAT HAS PRECIPITATED FROM
SOLUTION. :
3.3.3 TEST EQUIPMENT
GENERAL LABORATORY BALANCE, 1 TO 2 kg CAPACITY
CENTRIFUGE TUBE, 100 ml CAPACITY PER ASTM 01796
CENTRIFUGE CAPABLE OF MAINTAINING 500 RCF
CONSTANT TEMPERATURE 8ATH, 88°C
GLASS CONDENSER TUBE, APPROXIMATELY § mm 0.0. x 3 mm 10.
RUBBER STOPPERS TO FIT THE CENTRIFUGE TUBE
GRADUATED CYLINDER, 100mL CAPACITY TD
33.4 MATERIAL
600 PPM HARD WATER TEST SOLUTION
NICHROME WIRE
JUN=27-1987 15:84 323 992 ss1a sex P28ALi
CATERPILLAR INC.
LONG LIFE ENGINE COOLANT REQUIREMENTS
33.5 PROCEDURE
3.3.6.1 MEASURE AND ADD 50 mL OF THE COOLANT CONCENTRATE TO BE TESTED TO THE 100 mL.
CENTRIFUGE TUBE USING THE GRADUATED CYLINDER.
3.3.82 MEASURE AND ADD 50 mL OF THE 600 PPM HARD WATER TO THE ABOVE MENTIONED
CENTRIFUGE TUBE. COVER WITH A RUBBER STOPPER AND AGITATE THOROUGHLY.
3.9.5.3 REPLACE THE RUBBER STOPPER WITH A CLEAN AIR CONDENSER PREPARED BY INSERTING A.
SHORT LENGTH (30 cm) OF GLASS TUBING THROUGH A PROPERLY SIZED ONE HOLE-STOPPEA,
3.3.5.4 IMMERSE THE TUBE TO THE LEVEL OF THE SOLUTION IN A CONSTANT TEMPERATURE BATH AT.
88°C FOR 24 HOURS. INSERT THE DRY WIRE INTO THE CONDENSER TO THE BOTTOM OF THE
CONDENSER TUBE.
3.3.5.5 AT THE END OF THE HEATING PERIOD, REMOVE THE CENTRIFUGE TUBE AND SOLUTION FAOM
THE BATH AND COOL TO AMBIENT TEMPERATURE (ALLOW AT LEAST ONE HOUR).
3.9.5.6 CENTRIFUGE FOR 30 MINUTES AT 500 RCF.
3.35.7 AFTER CENTRIFUGING, READ THE VOLUME OF SOLIDS IN THE BOTTOM OF THE TUBE TO THE
NEAREST TENTH OR HUNDREDTH OF A mL AS APPROPRIATE.
3.3.6 ACCEPTANCE CRITERIA
ACCEPTABLE MATERIAL SHALL HAVE NO MORE THAN 0.25 mL OF DEBRIS COLLEGT IN THE
CENTRIFUGE TUBE TIP.
JUN-27-1987 15:89 323 6s@ 9510 se P.20L UALUOLINE,
CATERPILLAR INC. EC-1
LONG LIFE ENGINE COOLANT REQUIREMENTS
4.0 BENCH PERFORMANCE TESTING
41 FOAMING
44.1 SCOPE
THIS TEST METHOD COVERS A SIMPLE GLASSWARE TEST FOR EVALUATING THE FOAMIN
TENDENCY OF ENGINE COOLANTS.
44.2 METHOD
ASTM D1eo1
4.1.3 ACCEPTANCE CRITERIA
FOAM VOLUME AT'S MIN, MAX, ml. 150
FOAM BREAK TIME, MAX, s 5
07 SEP 94
BENCH PERFORMANCE TESTING
JUN-27-1597 15:24 383 692 S510 sex rae73BL P1824
gu UALUOLINIE. HD
CATERPILLAR INC. EC-1
LONG LIFE ENGINE COOLANT REQUIREMENTS
4.2 GLASSWARE CORROSION TEST
4.21 SCOPE
THIS TEST METHOD COVERS A SIMPLE GLASSWARE PROCEDURE FOR EVALUATING THE
CORROSIVE EFFECTS OF ENGINE COOLANTS ON METAL SPECIMENS.
422 METHOD
ASTM D1364
4.23 ACCEPTANCE CRITERIA
THE ENGINE COOLANT CONCENTRATE SHALL PROVIDE SUFFICIENT PROTECTION AGAINST
CORROSION AT 30% CONCENTRATION BY VOLUME SOLUTION TO MEET THE FOLLOWING LIMITS
(MAX WEIGHT LOSS, mg PER SPECIMEN)
COPPER | 10
SOLDER [15
BRASS 10
STEEL 10
CAST IRON | 10
ALUMINUM | 20
Tare
. BENCH PERFORMANCE TESTING 07-SEP 94
JuN=27-1997 15:03 3a 69@ 9518 98% P19“1387
ATERPILLAR INC.
LONG LIFE ENGINE COOLANT REQUIREMENTS
VALVOLINE HO
4,3 SIMULATED SERVICE TEST
43.1 SCOPE
THIS TEST METHOD EVALUATES THE EFFECT OF CIRCULATING ENGINE COOLANT ON METAL
SPECIMENS AND COOLING SYSTEM COMPONENTS UNDER CONTROLLED, ESSENTIALLY
ISOTHERMAL CONDITIONS.
432 METHOD
ASTM 02570
4.33 ACCEPTANCE CRITERIA
THE ENGINE COOLANT CONCENTRATE SHALL PROVIDE SUFFICIENT PROTECTION AGAINST
CORROSION AT 44% CONCENTRATION BY VOLUME SOLUTION TO MEET THE FOLLOWING LIMITS
(MAX WEIGHT LOSS, mg PER SPECIMEN)
OGPPER | 20
souer [40
eras | 20
STEEL 20
cast iRON | 20
ALUMINUM
JUN-27-1987 15:04 BS 680 9510 sex PiaCATERPILLAR INC. E C-1
LONG LIFE ENGINE COOLANT REQUIREMENTS
_—
44
44s
442
443
WATER PUMP CAVITATION TEST
SCOPE
TPIS TEST METHOD EVALUATES THE CAVITATION EROSION-CORROSION CHARACTERISTICS OF
ENGINE COOLANTS IN ALUMINUM WATER PUMPS,
METHOD
ASTM 02809
ACCEPTANCE CRITERIA
THE ENGINE COOLANT CONCENTRATE SHALL PROVIDE SUFFICIENT PROTECTION AGAINST
CAVITATION EROSION-CORROSION AT 16.67% CONCENTRATION BY VOLUME SOLUTION TO MEET
‘MINIMUM CORROSION RATING OF 8.
x381 P1124
UPLUOL INE: HO
CATERPILLAR INC. EC-1
LONG LIFE ENGINE COOLANT REQUIREMENTS
SEER
HOT SURFACE ALUMINUM TEST
45.1 SCOPE
THIS TEST METHOD COVERS A LABORATORY SCREENING PROCEDURE FOR EVALUATING THE
EFFECTIVENESS OF ENGINE COOLANTS IN CONTROLLING CORROSION OF ALUMINUM CASTING
ALLOYS UNDER HEAT-REJECTING CONDITIONS,
45.2 METHOD
ASTM 04349
4.5.3 ACCEPTANCE CRITERIA
THE ENGINE COOLANT CONCENTRATE SHALL PROVIDE SUFFICIENT PROTECTION AGAINST
CAVITATION EROSION-CORROSION AT 25% CONCENTRATION BY VOLUME ‘SOLUTION TO MEET
A MAXIMUM CORROSION RATE OF 1 mg/omtiwoek
BENCH PERFORMANCE TESTING
es 822 ss10 sex Poin1n3
‘CATERPILLAR INC. . EC-1
1 Pea
ALUOLINE HO
LONG LIFE ENGINE COOLANT REQUIREMENTS:
. _ Oe
5.0
51
5.2
5.3
5.3.1
532
5.3.3
FIELD TESTING
scope
THIS SECTION DESCRIBES A RECOMMENDED PRACTICE FOR EVALUATING THE ABILITY OF
LONG LIFE ENGINE COOLANT TO PROVIDE ACCEPTABLE CORROSION CONTROL AND COOLIt
SYSTEM PERFORMANCE WITH SIGNIFICANTLY REDUCED OR NO MAINTENANCE ADDITIONS ¢
INHIBITOR IN FIELD SERVICE,
SUMMARY OF METHOD
EACH ENGINE COOLANT IS EVALUATED AT THE RECOMMENDED CONCENTRATION WITH WATE
MEETING THE REQUIREMENTS OF THIS SPECIFICATION (SECTION 2.4), THE DUNATION SCoere
TEST IS 560,000 KILOMETERS (7000 HOURS) WITH A MINIMUM DURATION OF 480,000 KlLOMerer
RYSTEM CONDITION BY ANALYSIS OF COOLANT SAMPLES. AN ENGINE COOLANT EXTENDE
MAY (BE USED DURING THE TEST PERIOD BUT IS NOT REQUIRED. THE CONDITION Or st
NARIOUS ENGINE COMPONENTS INSPECTED AT THE ENO OF THE TEST PERIOD AND Th
SOOLANT SAMPLE ANALYSIS RESULTS DETERMINE WHETHER OR NOT ACCEPTAGL
PERFORMANCE WAS DEMONSTRATED.
EQUIPMENT
CRORE SX ENGINES TARGETEO FOR FULL INSPECTION, TWO MUST BE CATERPILLAR 31;
ENGINES AND FOUR MUST BE CATERPILLAR 3406 ENGINES. THESE ENGINES ARE TO nave
POWER RATING OF 260 KW OR GREATER,
PAREAST | COPPER-BRASS RADIATOR AND 1 ALUMINUM RADIATOR MUST BE INCLUDED
PART OF THE FULL INSPECTION,
JHE PREFERRED APPLICATION IS LINE-HAUL TRUCKING SERVICE, BUT ANY VEHICL
APPLICATION OPERATING AT GREATER THAN 60% LOAD FACTOR IS CONSIDERED AGCEPTADLI
JUN-27-1887
303 659 9510 sex 43JuNe2
29 VALUOLINE Ha
1387
VIE ILLAM ING,
LONG LIFE ENGINE COOLANT REQUIREMENTS EC-1
5.4 EQUIPMENT PREPARATION
544
542
5.4.3
5.44
46
COOLING SYSTEMS OF ENGINES PREVIOUSLY FILLED wer A DIFFERENT ENGINE COOLANT
THAN THE TEST ENGINE COOLANT SHALL SE CLEANED AND FLUSHED PRIOR TO FILLING WITH.
THE TEST. COOLANT PRIOR TO BEING PUT IN SERVICE,
AZAD Ce ENGINES SHOULD BE INSPECTED FOR COOLING SYSTEM PROBLEMS (L. - LEAKING
HEAD GASKETS OR EXCESS AIR INDUCTION INTO THE COOLING SYSTEM) OR DAMAGE IN THE
COOLING SYSTEM PRIOR TO INCLUSION IN THE TEST PROGR
INSPECT ALL ENGINES FOR LEAKS AND REPAIR IF FOUND,
THE CONDITION OF THE FOLLOWING PARTS OF USED ENGINES TARGETED FOR FULL
CSRECTION AT THE END OF THE TEST MUST BE DOCUMENTED WITH a Soren WRITTEN,
ALL CYLINDER LINERS
RADIATOR
WATER PUMP COVER
WATER PUMP IMPELLER
‘SPACER DECK (3176 ONLY)
HEAD COOLANT PASSAGES
THERMOSTAT HOUSING
HEP UAtiG, OR CORROSION DAMAGE IS FOUND ON ANY OF THESE PARTS, THE PART MUST BE
REPLACED.
Fee a SUGSESTED THAT AN IDENTIFICATION SYSTEM: BE ESTABLISHED THAT ALERTS
OPERATORS AND MAINTENANCE PERSONNEL THAT THE ENGINES ARE PART OF A TESTING
SROGRAM AND ADVISES ‘THEM OF THE PROPER ENGINE COOLANT TO INSTALL WHER
QOOMIONS ARE REQUIRED. THIS COULD INCLUDE LABELS ON OR NEAR THE FILL POINT IN Tre
SNe ed IDENTIFYING THE COOLANT TO BE INSTALLEO OR USED AS MAKE-UP Id! THE ENGINE
A RZCLOR CODING THE RADIATOR CAP WITH THE COLOR OF THE CAP ON THE COOLANT
BARREL OR CONTAINER,
70, REOUCE PROBLEMS WITH CONTAMINATION DUE TO MAKE-UP, AN APPROPRIATELY SIZED
CONTAINER OF THE TEST ENGINE COOLANT PREDILUTED TO THE RECOMMENDED TEST
CONCENTRATION SHOULD ACCOMPANY THE VEHICLE AT ALL TIMES.
FIELO TESTING
JUN-27-1997 15:87 23 692 9510 98%
FSeTIS1 P1624Jun
136 UALUDLINE HO
CATERPILLAR INC.
LONG LIFE ENGINE COOLANT REQUIREMENTS “EC. 1
5.5 TEST PROCEDURE
5.5.1 INSTALL THE TEST COOLANT IN THE ENGINE AT THE 50/50 VOL% CONCENTRATION OF
GLYCOL/WATER MIX IN ALL CASES WHERE TEMPERATURES ARE NOT EXPECTED TO DROP
BELOW -36°C(-34°F). IF LOWER TEMPERATURES ARE EXPECTED INSTALL THE TEST COOLANT
AT THE 60/40 VOL% CONCENTRATION OF GLYCOLWATER,
5.5.2 DOCUMENT THE TYPE OF SERVICE FOR EACH VEHICLE INCLUDED IN THE TEST FLEET.
5.5.3 DOCUMENT THE HOURS AND DISTANCE ACCUMULATION FOR EACH VEHICLE IN THE TEST
FLEET.
5.5.4 DOCUMENT THE INCIDENCE OF WATER PUMP SEAL LEAKAGE WITH ANY VEHICLE INCLUDED IN
THE TEST FLEET.
5.55 TAKE A COOLANT SAMPLE EVERY 40,000 KILOMETERS (500 HOURS) AND SUBMIT FOR THE
FOLLOWING ANALYSES:
pH
RESERVE ALKALINITY
METALLIC CORROSION ELEMENTS (FE, AL, PB, SN, CU)
CONTAMINANTS (CA, MG, CL, SULFATE)
INHIBITOR CONCENTRATION
5.5.8 AN ENGINE COOLANT EXTENDER MAY BE USED’ OURING THE TEST PERIOD AS LONG AS IT
MEETS THE REQUIREMENTS (SECTION 2.3) OF THIS SPECIFICATION. IF AN ENGINE COOLANT
EXTENDER IS USED; IT MUST BE ADDED BETWEEN 240,000 TO 280.000 KILOMETERS (3000 - 3500
HOURS) INTO THE TEST AND IN ALL ENGINES FROM THE CORE TEST GROUP.
JUN-27-1997
‘age
15:06 303 699 9512 P.i3P52.
— WRLUCLINE HO iia _—
VADEOILLAK ING,
LONG LIFE ENGINE COOLANT REQUIREMENTS EC-1
5.8 POST TEST INSPECTION AND REPORT ™~
581 REPORT THE FOLLOWING INFORMATION FOR EACH ENGINE FROM THE CORE TEST.GROUP.
5.6.1.1 ENGINE MODEL AND CONFIQURATION
5.6.1.2 RADIATOR MAKE AND TYPE
5.6.1.3 TEST PERIOD AND LOCATION
5.82 INSPECT, AND REPORT THE CONDITION OF THE FOLLOWING PARTS OF ENGINES INCLUDED IN
THE CORE TEST GROUP:
ALL CYLINDER LINERS
RADIATOR
WATER PUMP COVER
WATER PUMP IMPELLER
‘SPACER DECK (3176 ONLY)
HEAD COOLANT PASSAGES
THERMOSTAT HOUSING
583 REPORT ANY UNUSUAL CIRCUMSTANCES OR PROBLEMS INVOLVING COOLANT MAINTENANCE
OR COOLING SYSTEM PERFORMANCE THAT MAY HAVE DEVELOPED. OURING THE TEST,
5.84 REPORT THE INCIDENCE OF WATER FUMP SEAL LEAKAGE FOR ALL VEHICLES IN-THE TEST
FLRET. :
56.5 REPORT THE FOLLOWING RESULTS VS. DISTANCE (OR TIME) IN GRAPHICAL FORM FOR ALL
VEHICLES IN THE TEST FLEET:
5.6.5.1 pH
5.8.8.2 RESERVE ALKALINITY
5.65.9 METALLIC CORROSION ELEMENTS (FE, AL, PB, SN, cu)
5.6.5.4 CONTAMINANTS (CA, MG, CL, SULFATE)
5.6.55 INHIBITOR CONCENTRATION
FIELD TESTING 07 SEP 94
JUN-27-1987 15:87 323 59a 9sia sexJUN-2P-1987 18:26 3e3 650 ssia
BL Plaza
UALIOLINE BD
CATERPILLAR INC. EC-1
LONG LIFE ENGINE COOLANT REQUIREMENTS,
8.
ACCEPTANCE CRITERIA
57.1 THE ENGINE CONDITION MUST MEET THE FOLLOWING CRITERIA:
S714 NO CYLINOER LINER SHALL HAVE PITTING OAMAGE DEEPER THAN 15% OF THE WALL
THICKNESS,
8.7.1.2 RADIATOR TUBES MUST BE CLEAN WITH NO EVIDENCE OF BLOCKAGE 0A SLUDGE,
5:7-4.9 WATER PUMP COVERS, WATER PUMP IMPELLERS, ALUMINUM SPACER DECKS, HEAD COOLANT
PASSAGES, AND THERMOSTAT HOUSINGS MUST BE FREE On CORROSION AND PITTING
5.7.1.4 THERE MUST BE NO REPORTED WATER PUMP SEAL LEAKS OURING THE TEST PERIOD,
57.2 ALL ENGINES IN THE TEST FLEET MUST MEET THE FOLLOWING CRITERIA:
572.1 pH MUST BE MAINTAINED WITHIN TWO UNITS OF THE INITIAL VALUE AT THE START OF THE
TEST,
57.2.2 CORROSION METALS MUST BE UNDER CONTROL AND NOT TRENDING UPWARDS. -
eax Pate