You are on page 1of 2
Save trees use e-Question Paper Go green DOWNLOAD THIS FREE AT www.viuresource.com CBCSDSCREN e (PITLELLLB et Eighth Semester B.E. Degree Examination, Feb./Mar. 2022 Power System Operation and Cont; Time: 3 hrs. Note: Answer any FIVE full questions, choosiug ONE full qu foe Modute-t. 1 & Explain the operating sates of power system with a neat ing, the wansition ‘tween the states. (40 Marks ', With a ncat diagram, describe the major components (a0 oaks) oR 2 a, Diseuss about the commonly used preventive end onto! measures i a power system. “40 Marks) . Explain the various constants to be consideredyunit mitment. oss) 3. Explain the short term hydrothermal iag y-Aiteration method. —_(10Marks) b. Tuo machines operate in parallel machines are 200 MW. and 3 Mi Governors are adjusted 90 Joed of 400 MW. The capacities of the asa droop characteristic of 4%. Their is 100% on full load, Caleulate the loed ‘supplied by each unit and th this load. The system isa 50 He system, ‘aoatantsy mR 4a With a neat block di the basic generstor contro loops (aostarks 1. Explain the fllowinlgheng¥uscllin AGC: (Contr i) Te line (Gi) Net interchange (Gv) Station cog ee HIF (7) Unit contol exor coments) Module-3. 5 a Deri erator model of ALFC system. oars) ®. ‘A. 109Q MVA gR@gator opszatzs on fll load atthe rated fRequeney of $0 HZ. The loud is dyctje 800 MW. The steam valve hae an opersting time lag of 0.6 s. IF H = 5 sec, = in fequency. omar) on 6a, Dysve die space mode! ofan isolated AGC system, omar) Ry generating areas have capacities of $00 MW and 1000 MW respectively. They are sted by a short line. The petcentage speed regulations from no-load to ful-iond of ations are 3% and 4% respectively [the load on each station s 250 MW, ind the ‘power generation ofeach station andthe eine power. omar) « Modules Discuss about the issues related lo AGC implementation omar Two ess of ity of2500 MW, speed regulation R= 3 He/pcr MW and Ht ~ 5 see sre connected by a ie-line of capacity 250 MW, oporting a 45°, Fiad the quency of the Tine power oscillations, oMtaria) Lot? BRANCHES | ALL SEMESTERS | NOTES | QUESTON PAPERS | LAB MANUALS A Vturesource Go Green initiative Save trees use e-Question Paper DOWNLOAD THIS FREE AT ». Modules 1 With « neat flow chert, explain contingency analysis fof List and explain the major functions involved in sy or Discuss the set of sate variables and measurement a stat estimator. OM) “List and explain the other issues in stato estmyion. GoNtaeks Go green www.vturesource.com © on Prove that voltage at receiving end is dependent on active power in power system rc A440 V, 36 distibution feeder has a load of 7S KW drawing & agar capacitor ating of 45 KVAr is conncoted across the load. Determine (pf and esctive loa before compensation, (i) paler compensation. Jo Mats) line outne (OMe omar 2002 BRANCHES | ALL SEMESTERS | NOTES | QUESTON PAPERS | LAB MANUALS A Vturesource Go Green initiative

You might also like