KEY PLAN :-

LAE
DG1
BE

DG1
BE

DG2
BE

DG2
BE

DG1 DG1 LT
NE NE BE

DG2 DG2 LT
NE NE BE

PS

PS

PS
UP

OPEN TERRACE
FFL +606.80M LVL

DN
TB3(300x500) TB4(300x500) TB5(300x500) TB6(200x750) TB9(300x500)
TB7(200x750) TB8(300x500)

3.0M WIDE CORRIDOR P P P


150THK. 175THK. 150THK.
TB13 FFL +607.10M LVL P P
P P 150THK. 125THK. 125THK.

#
ADMIN STORE ROOM

TB93(200x600)
(200x400) P
P P +611.30m LVL P P

TB95(200x600)
TB80(300x500)

TB87(200x600)
SHAFT 01

TB84(300x500)
125THK. TB14(350x600)
04 UP
TB15(350x600)
TB77(200x500)

P P P P GM(SAE)

(300x600)
P P P

TB103 (350x600)
L.TOILET
J.C TB19 P P DN * *

TB92(300x600)
* 6 -SEATER
(200x400) TB20(300x500) TB21(200x500)

TB100
03
125THK. 125THK.
MEETING ROOM sto.below&above
full ht. partition

TB108(300x600)
G.TOILET TB22(200x400) ST-1 125THK. 125THK.

P P 150THK. P
A # TB83(300x500)
A P P
TB25(350x600) QRQC TB26(350x600)
STORE
P
P P PA
# TB79(300x500)

TB23(350x600) TB24(350x600)

TB86(200x600)
P P
H.TOILET P
TOILET
TB76(200x500)

125THK. 125THK.
P
125THK.
VISITOR'S 150THK.
P 150THK.
P P P P DN
ROOM 2.0M WIDE CORRIDOR

TB99 (400x750)

(350x600)
TB91(450x750)
P TB30(300x600) P P TB31(300x600)
P P P

(500X650)
TB94
TB32(350x600) TB33(350x600)

TB102
150THK.
* *

TB107(300x600)
2.0M WIDE CORRIDOR MAIN LOBBY 125THK. P 125THK. P
TB75(300x500)

P P P TB37(500x650)
P

full ht.partition 1.5m ht.partition


BELOW
TB40(350x600) TB41(350x600) DRAWING REFERED TO PREPARE THE SHOP DRAWING
FFL +602.90M LVL
cs cs GMR-OFCe-AC02-01-02-255911
TB38(350x600) TB39(350x600) 12 -SEATER
ST-2 P
MEETING ROOM
P REV NO : R1

2.0M WIDE CORRIDOR


2.0M WIDE CORRIDOR
DN P 125THK. 125THK. DATED : 11.07.2020
P P
150THK. P P
A A
4 -SEATER Service
A
MEETING ROOM
TB90(450x750)

TB46(350x600) TB47(350x600)

TB98 (450x750)
WS-4

(400x750)
TB82(350x650)

* *
CABIN TB45(300x600)
GMR-FAC-AR12-01-01-274779

150THK.

TB106(300x600)
(Service)
*

TB101b
cs cs
P glass partition 125THK. 125THK.
cs TYPICAL HEAT RECOVERY UNIT
TB74(200x600)

150THK.
P P

18 SEATER CONNECTION DETAILS


TB51 (400x750) P P
BOARD ROOM
P P P P HVAC GENERAL NOTES:

printer
LEAN
TB48(200x600) low ht.storage
TB49(300x600) TB50(500x650) 1. ALL DIMENSIONS ARE IN MM UNLESS OTHERWISE SPECIFIED.
2.0M WIDE CORRIDOR STO 2. DUCTS SHALL BE FABRICATED WITH GSS SHEETS AS PER SPECIFICATIONS.
150THK.
P P P P 125THK. 125THK.
3. THERMAL INSULATION OF SUPPLY AIR DUCT SHALL BE 19MM THICK
150THK.
CLOSED CELL NITRILE RUBBER WITH CANVAS CLOTH OF 0.18MM THICK.
P P P P 4. ACOUSTIC INSULATION OF SUPPLY AIR DUCT SHALL BE OF
A cs A cs
15MM THICK ARMASOUND - OPEN CELL NITRILE RUBBER.
CABIN TB53(350x750) 6 -SEATER TB54(350x750) 6 -SEATER TB55(350x600) TB56(350x600) 5. THERMAL INSULATION OF RETURN AIR DUCT INSIDE THE FACTORY & HRW
B B FRESH AIR / RETURN AIR DUCTS SHALL BE OF 9MM THICK CLOSED CELL

TB97 (400x750)
(Purchase) MEETING ROOM MEETING ROOM
NITRILE RUBBER.

(400x750)
* * * *
A
P P P P 6. CONDENSATE DRAIN WATER PIPE SHALL BE CONNECTED TO THE

TB105(300x600)
cs Purchase
NEAREST DRAIN POINT.
TB73(300x750)

LEAN 7. COLOR OF THE AIR TERMINALS SHALL BE AS APPROVED BY CLIENT

TB101a
6 -SEATER BREAKOUT 6 -SEATER
P P P P REPRESENTATIVE TO SUITE WITH INTERIORS.
MEETING ROOM MEETING ROOM 125THK. 125THK.
150THK. 8. BUILDERS WORK DRAWINGS FOR WALL OPENING WILL BE SHARED
P P
TB89(400x750)

150THK. WS-6
P P P P
WS-6 6 -SEATER BASED ON APPROVED SHOP DRAWING.
MEETING ROOM 9. STARTER PANEL SIZE SHALL BE BASED ON APPROVED GA DRAWING.
TB58(350x600) TB60 (400x750)
4 -SEATERTB57(350x600) TB59(525x750)
MEETING ROOM CABIN-2
PAY ROLL P P (Finance)
CABIN FOR APPROVAL
P
GDB1(300x450)
GDB1(300x450)

125THK. 125THK. 125THK. 125THK.


P P A cs P

TB96(400x650)
A cs GDB1(300x450)
low ht.storage

low ht.storage

TB62(350x650) TB65(350x650)
FINANCE TB66(350x650)
TB63(350x650)
DOUBLE HEIGHT

(400x750)
*
GDB1(300x450)

*
ENTRANCE

TB104(300x650)
TB72(300x650)

HR GDB1(300x450)

TB101
WS-9
WS-9 P
TB88(400x650)

125THK. 125THK. 125THK. 125THK.


P P REVISIONS
P
TB85(350x650)

GDB1(300x450)

125THK.
CABIN-1
GRAPHIC SCALE:
CABIN
TB67(300x500)
cs
cs cs
TB68(300x500) TB69(300x750) TB70(300x500) TB71(300x500) (Finance)
(HR)

CLIENT:

TERRACE FLOOR BEAM LAYOUT +611.00M LVL GMR AEROSPACE AND INDUSTRIAL
PARK @ HYDERABAD  

PROJECT MANAGEMENT
SYNERGY PROPERTY DEVELOPMENT

FIRST FLOOR SERVICES PVT LTD., HYDERABAD.

PROJECT:
PROPOSED FACTORY BUILDINGS FOR
SAFRAN @ GMR AEROSPACE AND
INDUSTRIAL PARK @ HYDERABAD
 
DESIGN CONSULTANT:
design | interiors | engineering | construction management

C.R.Narayana Rao ( Consultants ) Private Limited

No. 10, Karpagambal Nagar,


Mylapore, Chennai-600 004.
India.

1 2 3 4 5 5' 6 7 8 9 9' 10 11 12 13 14 15 16
www.crn.co.in

MEP CONTRACTOR:
B.O.SLAB 3700

B.O.GYPSUM 2700
B.O.GRID 2750

B.O.DUCT 2800

B.O.DUCT 2800
B.O.D 2925

B.O.FC-2925

B.O.D 2925
B.O.D 2925

B.O.D 2950

B.O.D 2900

N
B.O.FC 2750

B.O.FC 2750

B.O.D 2799

B.O.D 2700
B.O.D 2650

ACMV LAYOUT FOR OFFICE FIRST


FLOOR AND TERRACE FLOOR PALN
CABIN (purchase)

R3

MH20-0002-GMR-OFF-AC - 007