Professional Documents
Culture Documents
LAE
DG1
BE
DG1
BE
DG2
BE
DG2
BE
DG1 DG1 LT
NE NE BE
DG2 DG2 LT
NE NE BE
PS
PS
PS
UP
OPEN TERRACE
FFL +606.80M LVL
DN
TB3(300x500) TB4(300x500) TB5(300x500) TB6(200x750) TB9(300x500)
TB7(200x750) TB8(300x500)
#
ADMIN STORE ROOM
TB93(200x600)
(200x400) P
P P +611.30m LVL P P
TB95(200x600)
TB80(300x500)
TB87(200x600)
SHAFT 01
TB84(300x500)
125THK. TB14(350x600)
04 UP
TB15(350x600)
TB77(200x500)
P P P P GM(SAE)
(300x600)
P P P
TB103 (350x600)
L.TOILET
J.C TB19 P P DN * *
TB92(300x600)
* 6 -SEATER
(200x400) TB20(300x500) TB21(200x500)
TB100
03
125THK. 125THK.
MEETING ROOM sto.below&above
full ht. partition
TB108(300x600)
G.TOILET TB22(200x400) ST-1 125THK. 125THK.
P P 150THK. P
A # TB83(300x500)
A P P
TB25(350x600) QRQC TB26(350x600)
STORE
P
P P PA
# TB79(300x500)
TB23(350x600) TB24(350x600)
TB86(200x600)
P P
H.TOILET P
TOILET
TB76(200x500)
125THK. 125THK.
P
125THK.
VISITOR'S 150THK.
P 150THK.
P P P P DN
ROOM 2.0M WIDE CORRIDOR
TB99 (400x750)
(350x600)
TB91(450x750)
P TB30(300x600) P P TB31(300x600)
P P P
(500X650)
TB94
TB32(350x600) TB33(350x600)
TB102
150THK.
* *
TB107(300x600)
2.0M WIDE CORRIDOR MAIN LOBBY 125THK. P 125THK. P
TB75(300x500)
P P P TB37(500x650)
P
TB46(350x600) TB47(350x600)
TB98 (450x750)
WS-4
(400x750)
TB82(350x650)
* *
CABIN TB45(300x600)
GMR-FAC-AR12-01-01-274779
150THK.
TB106(300x600)
(Service)
*
TB101b
cs cs
P glass partition 125THK. 125THK.
cs TYPICAL HEAT RECOVERY UNIT
TB74(200x600)
150THK.
P P
printer
LEAN
TB48(200x600) low ht.storage
TB49(300x600) TB50(500x650) 1. ALL DIMENSIONS ARE IN MM UNLESS OTHERWISE SPECIFIED.
2.0M WIDE CORRIDOR STO 2. DUCTS SHALL BE FABRICATED WITH GSS SHEETS AS PER SPECIFICATIONS.
150THK.
P P P P 125THK. 125THK.
3. THERMAL INSULATION OF SUPPLY AIR DUCT SHALL BE 19MM THICK
150THK.
CLOSED CELL NITRILE RUBBER WITH CANVAS CLOTH OF 0.18MM THICK.
P P P P 4. ACOUSTIC INSULATION OF SUPPLY AIR DUCT SHALL BE OF
A cs A cs
15MM THICK ARMASOUND - OPEN CELL NITRILE RUBBER.
CABIN TB53(350x750) 6 -SEATER TB54(350x750) 6 -SEATER TB55(350x600) TB56(350x600) 5. THERMAL INSULATION OF RETURN AIR DUCT INSIDE THE FACTORY & HRW
B B FRESH AIR / RETURN AIR DUCTS SHALL BE OF 9MM THICK CLOSED CELL
TB97 (400x750)
(Purchase) MEETING ROOM MEETING ROOM
NITRILE RUBBER.
(400x750)
* * * *
A
P P P P 6. CONDENSATE DRAIN WATER PIPE SHALL BE CONNECTED TO THE
TB105(300x600)
cs Purchase
NEAREST DRAIN POINT.
TB73(300x750)
TB101a
6 -SEATER BREAKOUT 6 -SEATER
P P P P REPRESENTATIVE TO SUITE WITH INTERIORS.
MEETING ROOM MEETING ROOM 125THK. 125THK.
150THK. 8. BUILDERS WORK DRAWINGS FOR WALL OPENING WILL BE SHARED
P P
TB89(400x750)
150THK. WS-6
P P P P
WS-6 6 -SEATER BASED ON APPROVED SHOP DRAWING.
MEETING ROOM 9. STARTER PANEL SIZE SHALL BE BASED ON APPROVED GA DRAWING.
TB58(350x600) TB60 (400x750)
4 -SEATERTB57(350x600) TB59(525x750)
MEETING ROOM CABIN-2
PAY ROLL P P (Finance)
CABIN FOR APPROVAL
P
GDB1(300x450)
GDB1(300x450)
TB96(400x650)
A cs GDB1(300x450)
low ht.storage
low ht.storage
TB62(350x650) TB65(350x650)
FINANCE TB66(350x650)
TB63(350x650)
DOUBLE HEIGHT
(400x750)
*
GDB1(300x450)
*
ENTRANCE
TB104(300x650)
TB72(300x650)
HR GDB1(300x450)
TB101
WS-9
WS-9 P
TB88(400x650)
GDB1(300x450)
125THK.
CABIN-1
GRAPHIC SCALE:
CABIN
TB67(300x500)
cs
cs cs
TB68(300x500) TB69(300x750) TB70(300x500) TB71(300x500) (Finance)
(HR)
CLIENT:
TERRACE FLOOR BEAM LAYOUT +611.00M LVL GMR AEROSPACE AND INDUSTRIAL
PARK @ HYDERABAD
PROJECT MANAGEMENT
SYNERGY PROPERTY DEVELOPMENT
PROJECT:
PROPOSED FACTORY BUILDINGS FOR
SAFRAN @ GMR AEROSPACE AND
INDUSTRIAL PARK @ HYDERABAD
DESIGN CONSULTANT:
design | interiors | engineering | construction management
1 2 3 4 5 5' 6 7 8 9 9' 10 11 12 13 14 15 16
www.crn.co.in
MEP CONTRACTOR:
B.O.SLAB 3700
B.O.GYPSUM 2700
B.O.GRID 2750
B.O.DUCT 2800
B.O.DUCT 2800
B.O.D 2925
B.O.FC-2925
B.O.D 2925
B.O.D 2925
B.O.D 2950
B.O.D 2900
N
B.O.FC 2750
B.O.FC 2750
B.O.D 2799
B.O.D 2700
B.O.D 2650
R3
MH20-0002-GMR-OFF-AC - 007