You are on page 1of 1

height between floor 3000

rise 150
tread 300
width of flight 900
width of landing 650
live load 5
finish load 0.6
no. of steps between 20
no of rise in 1 flight 10
no of tread 9
l/d 20
leff 4300
d 215
bar dia 20
cover 20
D 245
D,prov 250
effective depth 220

LOAD ON STEP
DEAD LOAD DEAD LOAD
SW OF SLAB 6.25 SW OF SLAB 6.25
SW OF MASONRY 1.5 FINISH LOAD 0.6
FINISH LOAD 0.6 LIVE LOAD 5
LIVE LOAD 5 TOTAL LOAD 11.85
TOTAL LOAD 13.35 FACTORED 17.775
FACTORED 20.025 17.775
LENGTH 2.7 LENGTH 0.8
BENDING MOMENT AT CENTRE
REACTION 41.25375
BM @C 88.69556 24.885 18.24778 45.56278125
C 126195.2
B -215
A 0.013833
SQRT(B^2-4AC) 198.0964
AST 610.9722
BAR DIA 14
NO. OF BARS 3.970962 4
SPACING 250 MAIN RFT- 14MM @250MM C/C
SECONDARY REINFORCEMENT
Ast 300
BAR DIA 8
NO. OF BARS 5.971338 6
SPACING 166.6667 SEC. RFT - 10MM@150MM C/C