WEIL CONTROL COORDINATION MEETING

Date : May L2,2022

Time : 07:30 AM
.{
:ii
Place : GEMAH #E (nie Office)
Agenda : Preparing for Spud in GEMAH #28 Well.

1. All well controll equipments must be good installed as property prior spud

in.

2. Prior function test the fire pump need to be repaired in hose connection

and from discharge hose to fire pump due to leaking.

3. Report all problem found to Person in charge related, ripair it as soon if i

cannot fixed report to rig superintendet or materialman to request the

material needed.
4. Mention all crewmen to fill up actually the form daily checklist as per
position.

5. Tool pusher shall be monitored the daily checktist every day and give
funishment if there is serious violation to improve work performance.
WELL CONTROL COORDINATION MEETING ATTENDANT LIST

RIG NAME : BOHAI - 92 DATE : May 12,2022

NO NAME POSTTTON 9fNAruRE


7 Ari Kusmiadi Rig Superintendent

2 ldrus Toolpusher

3 Erwan Materialman

4 Deddy Electrick Spv

5 Arpan Mechani.c Spv

5 Valiendrio HSE