Time : 07:30 AM
.{
:ii
Place : GEMAH #E (nie Office)
Agenda : Preparing for Spud in GEMAH #28 Well.
1. All well controll equipments must be good installed as property prior spud
in.
2. Prior function test the fire pump need to be repaired in hose connection
material needed.
4. Mention all crewmen to fill up actually the form daily checklist as per
position.
5. Tool pusher shall be monitored the daily checktist every day and give
funishment if there is serious violation to improve work performance.
WELL CONTROL COORDINATION MEETING ATTENDANT LIST
2 ldrus Toolpusher
3 Erwan Materialman
5 Valiendrio HSE