T D S

9 0.25
0.25
2.8

1.58

0.00
3

0.00

0.00
Description

B. SUPERSTRUCTURE
1. Concrete Work
1.1. COLUMNS
C-1
(-6.00 - -3.00)(sec1-1)
(-6.00 - -3.00)(sec1-1)
(-6.00 - -3.00)(sec1-1)
(-6.00 - -3.00)(sec1-1)
(-6.00 - -3.00)(sec1-1)
(-6.00 - -3.00)(sec1-1)
(-6.00 - -3.00)(sec1-1)
(-6.00 - -3.00)(sec1-1)
(-6.00 - -3.00)(sec1-1)
N:B you can add as many rows as you want depnding on your drawing
Total Volume of Columns

1.2 SLAB
FIRST AND SECOND FLOOR

GROSS SLAB AREA

DDT FOR ALL OPENINGS

TOTAL VOLUME OF CONCRETE IN SLAB


N:B you can add as many rows as you want depnding on your drawing